Skip to content

build(deps-dev): bump locust from 2.25.0 to 2.31.8 in /requirements #4314

build(deps-dev): bump locust from 2.25.0 to 2.31.8 in /requirements

build(deps-dev): bump locust from 2.25.0 to 2.31.8 in /requirements #4314

Triggered via pull request October 1, 2024 05:15
Status Failure
Total duration 19m 8s
Artifacts 6

tests.yml

on: pull_request
Matrix: tests
Coverage report
0s
Coverage report
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 5 warnings
tests (3.10)
Process completed with exit code 2.
tests (3.11)
The job was canceled because "_3_10" failed.
tests (3.9)
The job was canceled because "_3_10" failed.
tests (3.9)
The operation was canceled.
tests (3.8)
The job was canceled because "_3_10" failed.
tests (3.8)
The operation was canceled.
tests (3.12)
The job was canceled because "_3_10" failed.
tests (3.12)
The operation was canceled.
tests (3.10)
Restore cache failed: Dependencies file is not found in /home/runner/work/karapace/karapace. Supported file pattern: go.sum
tests (3.11)
Restore cache failed: Dependencies file is not found in /home/runner/work/karapace/karapace. Supported file pattern: go.sum
tests (3.9)
Restore cache failed: Dependencies file is not found in /home/runner/work/karapace/karapace. Supported file pattern: go.sum
tests (3.8)
Restore cache failed: Dependencies file is not found in /home/runner/work/karapace/karapace. Supported file pattern: go.sum
tests (3.12)
Restore cache failed: Dependencies file is not found in /home/runner/work/karapace/karapace. Supported file pattern: go.sum

Artifacts

Produced during runtime
Name Size
coverage-3.11
230 KB
karapace-integration-test-logs-3.10
4.99 MB
karapace-integration-test-logs-3.11
4.63 MB
karapace-integration-test-logs-3.12
4.59 MB
karapace-integration-test-logs-3.8
5 MB
karapace-integration-test-logs-3.9
4.53 MB