Pre-production June 2021 Concept
cdean-github
released this
22 Jun 15:44
·
168 commits
to master
since this release
This tag holds the June 2021 concept BEFORE we start testing the reconstruction. There will be some debugging to be done and a v1.0 will be released before we launch full production.
Detector configuration table:
Detector | Component Name | Brief description | Location | Dimension | Fast/Full geometry? |
g4detector code ready? | Reference implimentation in https://github.com/eic/fun4all_eicmacros |
ECCE macros done? (by sim team) |
Open Action Item | Notes |
---|---|---|---|---|---|---|---|---|---|---|
Field map | Y | standard with field return. Open return map available | ||||||||
Beam pipe | Central Beam Pipe | Be pipe | IP | R=3cm, -60-80cm | Full | y | https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L75 | Y | Suggest to further add +2um Au coating for SynRad control | |
Beam pipe | Central Beam Chamber | Beam chamber Mar2020 model | IP | -4.5m to 4.5m | Full | y | https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L105 | Y | To be upgrade to new model by project | |
Tracking | Barrel vertex | ITS3 | See "Tracking reference layout" | Full | y | Y | Double check tracking association | |||
Tracking | Barrel silicon | Full | y | |||||||
Tracking | Barrel MPGD | Fast | y | Y | Swtitch to Ar:CO2:CF4 in 45:15:40 % ratio considering 45 microns spatial resolution is with this gas mixture. | |||||
Tracking | h-going silicon layers | See "Tracking reference layout" | Fast | y | Y | |||||
Tracking | e-going silicon layers | Fast | y | Y | ||||||
Tracking | h-going GEM | Fast | y | Y | Update to EIC prototype geometry description | ~ePHENIX GEM design as of now, use 70um resolution | ||||
Tracking | e-going GEM | Fast | y | Y | ||||||
Tracking | Support barrel | Fast | y | Y | 0.2cm CFRP support barrel | |||||
Calorimetry | Backward EMCal | Hybrid | Z_start=190 cm (offset from center) | Thickness = 60 cm (detector length) | ePHENIX | Pending implimentation | Use ePHENIX PbWO4-Xtal when hybrid being developped | |||
Calorimetry | Backward HCal | STAR | Y | Check digitization-reco chain | Outside the barrel HCal | |||||
Calorimetry | Barrel EMCal | sPHENIX | ePHENIX | Full model in development | ||||||
Calorimetry | Barrel HCal | sPHENIX | Full | y | Y | Including full model of EMCal active support structure | ||||
Calorimetry | Forward EMCal | PHENIX | Y | |||||||
Calorimetry | Forward HCal | new | ePHENIX | |||||||
PID | e-going TOF | Z_start=?? | Fast | y | Y | Confirm projection reconstruction | ||||
PID | h-going TOF | Y | ||||||||
PID | barrel TOF | Y | ||||||||
PID | mRICH | See "PID reference layout" | Full | y | Y | Reco. integration in progress | ||||
PID | dRICH | Fast | y | Y | missing window and mirror materials, fast PID | Could have a few week delay, use stand-in or FastSim if needed | ||||
PID | hpDIRC | Fast | y | Y | Need to impliment fast PID | Could have a few week delay, use stand-in or FastSim if needed | ||||
Far-forward | ZDC | Z_center=37.50 m, X_center=96 cm, rotation in Y = 0.0256 rad | 60cm x 60 cm x 2 m | Full | y | Y | ||||
Far-forward | B0 tracker | Z_center=5.55 m | Thickness 20cm, radius 10cm, Pacman shape with 120 degree opening angle for hadron beam pipe + hole for electron beam pipe | Fast | y | Y | ||||
Far-forward | B0 calo | Z_center=5.8 m | Thickness 10cm, radius 10cm, Pacman shape with 120 degree opening angle for electron beam pipe + hole for hadron beam pipe | N | Miss working reference implimentation in Fun4All | |||||
Far-forward | Roman-pots | Layer 1: xyz = (84.49,0,2600) [cm] Layer 2: xyz = (93.59,0,2800) [cm] | Fast | Y | ||||||
Far-forward | Far-forward beam pipe | We are concern that it is not in correct place. Preffer to run without it | Y | |||||||
Far-forward | Off Momentum 1 | Z_center=22.5, x_center = 0.8m | Width = 30cm, height=30cm | Y | ||||||
Far-forward | Off Momentum 2 | Z_center=24.5, x_center = 0.85m | Width = 30cm, height=30cm | Y |