Pre-production June 2021 Concept

Compare
Choose a tag to compare
@cdean-github cdean-github released this 22 Jun 15:44
· 168 commits to master since this release
38efad6

This tag holds the June 2021 concept BEFORE we start testing the reconstruction. There will be some debugging to be done and a v1.0 will be released before we launch full production.

Detector configuration table:

Detector Component Name Brief description Location Dimension Fast/Full
geometry?
g4detector code ready? Reference implimentation in
https://github.com/eic/fun4all_eicmacros
ECCE macros done?
(by sim team)
Open Action Item Notes
Field map Y standard with field return. Open return map available
Beam pipe Central Beam Pipe Be pipe IP R=3cm, -60-80cm Full y https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L75 Y Suggest to further add +2um Au coating for SynRad control
Beam pipe Central Beam Chamber Beam chamber Mar2020 model IP -4.5m to 4.5m Full y https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L105 Y To be upgrade to new model by project
Tracking Barrel vertex ITS3 See "Tracking reference layout" Full y Y Double check tracking association
Tracking Barrel silicon Full y
Tracking Barrel MPGD Fast y Y Swtitch to Ar:CO2:CF4 in 45:15:40 % ratio considering 45 microns spatial resolution is with this gas mixture.
Tracking h-going silicon layers See "Tracking reference layout" Fast y Y
Tracking e-going silicon layers Fast y Y
Tracking h-going GEM Fast y Y Update to EIC prototype geometry description ~ePHENIX GEM design as of now, use 70um resolution
Tracking e-going GEM Fast y Y
Tracking Support barrel Fast y Y 0.2cm CFRP support barrel
Calorimetry Backward EMCal Hybrid Z_start=190 cm (offset from center) Thickness = 60 cm (detector length) ePHENIX Pending implimentation Use ePHENIX PbWO4-Xtal when hybrid being developped
Calorimetry Backward HCal STAR Y Check digitization-reco chain Outside the barrel HCal
Calorimetry Barrel EMCal sPHENIX ePHENIX Full model in development
Calorimetry Barrel HCal sPHENIX Full y Y Including full model of EMCal active support structure
Calorimetry Forward EMCal PHENIX Y
Calorimetry Forward HCal new ePHENIX
PID e-going TOF Z_start=?? Fast y Y Confirm projection reconstruction
PID h-going TOF Y
PID barrel TOF Y
PID mRICH See "PID reference layout" Full y Y Reco. integration in progress
PID dRICH Fast y Y missing window and mirror materials, fast PID Could have a few week delay, use stand-in or FastSim if needed
PID hpDIRC Fast y Y Need to impliment fast PID Could have a few week delay, use stand-in or FastSim if needed
Far-forward ZDC Z_center=37.50 m, X_center=96 cm, rotation in Y = 0.0256 rad 60cm x 60 cm x 2 m Full y Y
Far-forward B0 tracker Z_center=5.55 m Thickness 20cm, radius 10cm, Pacman shape with 120 degree opening angle for hadron beam pipe + hole for electron beam pipe Fast y Y
Far-forward B0 calo Z_center=5.8 m Thickness 10cm, radius 10cm, Pacman shape with 120 degree opening angle for electron beam pipe + hole for hadron beam pipe N Miss working reference implimentation in Fun4All
Far-forward Roman-pots Layer 1: xyz = (84.49,0,2600) [cm] Layer 2: xyz = (93.59,0,2800) [cm] Fast Y
Far-forward Far-forward beam pipe We are concern that it is not in correct place. Preffer to run without it Y
Far-forward Off Momentum 1 Z_center=22.5, x_center = 0.8m Width = 30cm, height=30cm Y
Far-forward Off Momentum 2 Z_center=24.5, x_center = 0.85m Width = 30cm, height=30cm Y