Skip to content

[Stability] Fix combined network CI failures #2

[Stability] Fix combined network CI failures

[Stability] Fix combined network CI failures #2

Triggered via pull request December 13, 2023 16:32
Status Cancelled
Total duration 21m 34s
Artifacts 1

build-test.yml

on: pull_request
Matrix: build-arm
Matrix: build
Matrix: test_crypto
Matrix: build-dockers
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (tokio)
Process completed with exit code 101.
build (async_std)
The job was canceled because "tokio" failed.
build (async_std)
The operation was canceled.
test_crypto (async_std)
Canceling since a higher priority waiting request for 'Build, Lint, and Test-refs/pull/2208/merge' exists
test_crypto (async_std)
The operation was canceled.
build-arm (async_std)
Canceling since a higher priority waiting request for 'Build, Lint, and Test-refs/pull/2208/merge' exists
build-arm (async_std)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
binaries-aarch64-tokio Expired
140 MB