Skip to content

Commit

Permalink
Update README.md
Browse files Browse the repository at this point in the history
  • Loading branch information
jaktk authored Jun 27, 2024
1 parent b211b30 commit b9abf68
Showing 1 changed file with 2 additions and 3 deletions.
5 changes: 2 additions & 3 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -38,9 +38,8 @@ This document present the construction of a modified De Montfort Incinerator Mar

The construction of this incinerator is part of a broader project, conducted by Global Health Engineering, a ETH research group, aiming to introduce regular waste collection in the township of Cape Maclear, Malawi, ensuring safe waste disposal and minimizing contamination as much as possible.
The main goal of the incinerator is to reduce waste volume and make hazardous waste harmless, emphasizing cost-effectiveness and minimizing risks.
<p align="middle">
![](img/Picture1.png){width=60%}
</p>

![](img/Picture1.png)

# License

Expand Down

0 comments on commit b9abf68

Please sign in to comment.