name | about | title | labels | assignees |
---|---|---|---|---|
Epic |
Captures a large body of work |
[EPIC]: |
Epic |
The success of this Epic will be measured on our capability to split correctly all the needed implementation. Those will be described in applicative tasks in our Board application and measured as estimated time of development. Such process will help us keep track of the technical progress of the epic.
The must-have for launch will be modified over the technical analysis and development, the scope is defined by the milestone related.
Related issues:
- #2
The stakehoders of this epic should be the whole dev team and the defined scrum master
Linked issues are the only ressources needed.