Skip to content

Implementation of cl_khr_icd 2.0.0 #28

Implementation of cl_khr_icd 2.0.0

Implementation of cl_khr_icd 2.0.0 #28

Triggered via pull request September 4, 2024 23:42
Status Failure
Total duration 7m 9s
Artifacts

presubmit.yml

on: pull_request
Code formatting
7s
Code formatting
Matrix: android
Matrix: linux
Matrix: macos
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

10 errors
macos (gcc-11, g++-11, Ninja Multi-Config, 11)
Process completed with exit code 1.
macos (gcc-11, g++-11, Ninja Multi-Config, 99)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (gcc-11, g++-11, Ninja Multi-Config, 17)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (gcc-11, g++-11, Ninja Multi-Config, 17)
Process completed with exit code 1.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 17)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 17)
The operation was canceled.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 99)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 99)
The operation was canceled.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 11)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 11)
The operation was canceled.