Skip to content

Better biosphere install/update handling #630

Better biosphere install/update handling

Better biosphere install/update handling #630

Triggered via pull request December 2, 2023 14:03
Status Cancelled
Total duration 2h 55m 44s
Artifacts 7

main.yaml

on: pull_request
patch-test-environment
6s
patch-test-environment
Matrix: tests
deploy-development
0s
deploy-development
Fit to window
Zoom out
Zoom in

Annotations

12 errors
tests (windows-latest, 3.9)
The run was canceled by @marc-vdm.
tests (windows-latest, 3.9)
The operation was canceled.
tests (windows-latest, 3.8)
The run was canceled by @marc-vdm.
tests (windows-latest, 3.8)
The operation was canceled.
tests (ubuntu-latest, 3.8)
The run was canceled by @marc-vdm.
tests (ubuntu-latest, 3.8)
The operation was canceled.
tests (macos-latest, 3.9)
The run was canceled by @marc-vdm.
tests (macos-latest, 3.9)
The operation was canceled.
tests (ubuntu-latest, 3.9)
The run was canceled by @marc-vdm.
tests (ubuntu-latest, 3.9)
The operation was canceled.
tests (macos-latest, 3.8)
The run was canceled by @marc-vdm.
tests (macos-latest, 3.8)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
env-macos-latest-3.8 Expired
5.56 KB
env-macos-latest-3.9 Expired
5.53 KB
env-ubuntu-latest-3.8 Expired
7.7 KB
env-ubuntu-latest-3.9 Expired
7.67 KB
env-windows-latest-3.8 Expired
5.69 KB
env-windows-latest-3.9 Expired
5.66 KB
patched-environment Expired
313 Bytes