Skip to content

Latest commit

 

History

History
40 lines (26 loc) · 1.73 KB

PULL_REQUEST_TEMPLATE.md

File metadata and controls

40 lines (26 loc) · 1.73 KB

Jira ticket number:

Does this PR introduce a breaking change?

Are all of the original requirements satisfied in this PR?

What is the current behavior?

What is the new behavior?

How to test

Motivation and context

Checklist

  • The title of this PR follows the conventional commit guidelines
  • Acceptance criteria from the original issue has been satisfied or will be covered by multiple PRs
  • I have performed a self-review of my code and the expected functionality
  • I have added tests that prove that my feature works or my fix is effective
  • I have made any necessary changes to the documentation
  • The changes introduced can go live immediately with stakeholder approval
  • Product or Business stakeholders have performed acceptance testing