Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

ChargePoint? #453

Open
skinkie opened this issue Jun 21, 2023 · 15 comments
Open

ChargePoint? #453

skinkie opened this issue Jun 21, 2023 · 15 comments
Assignees
Labels
document has been updated NeTEx Document already updated enhancement non semantic enhacement: technical enhancement, etc. late_work
Milestone

Comments

@skinkie
Copy link
Contributor

skinkie commented Jun 21, 2023

Is there any support for a specific TimingPoint or GaragePoint derivative where a vehicle may charge or have ChargingEquipment in place?

@nick-knowles
Copy link
Contributor

nick-knowles commented Jun 21, 2023 via email

@ue71603
Copy link
Contributor

ue71603 commented Dec 12, 2023

@Aurige What will we do?

@Aurige
Copy link
Contributor

Aurige commented Dec 12, 2023

We promised Germany that we will include it ... but TM is not done yet on it (the MODE discussion kind of killed everything else). I need to check with Kasia, but will favour integrating it as promised

@ue71603
Copy link
Contributor

ue71603 commented Dec 12, 2023

@Aurige is it already fully modeled. The image doesn't work for me.

@nick-knowles
Copy link
Contributor

Current Recharging model proposal
image

ANd
image

@ue71603
Copy link
Contributor

ue71603 commented Dec 13, 2023

@nick-knowles @Aurige Is it ripe enough to be modeled in NeTEx or do we wait until January and when it is finalized in Transmodel?

@ue71603
Copy link
Contributor

ue71603 commented Dec 13, 2023

Christophe: TM not finalised yet.

@ue71603
Copy link
Contributor

ue71603 commented Dec 13, 2023

Contact through Winfried

@ue71603 ue71603 added enhancement non semantic enhacement: technical enhancement, etc. needs documentation update The NeTEx document needs to be updated and removed question labels Dec 13, 2023
@ue71603
Copy link
Contributor

ue71603 commented Dec 13, 2023

Wilfried: VDV 462 has been enhanced with all those things.
Nick: I did take into account VDV 462. Not scheduling, but the rest.

@ue71603 ue71603 assigned ue71603 and unassigned Aurige and ue71603 Apr 19, 2024
@Aurige
Copy link
Contributor

Aurige commented Sep 4, 2024

To be reviewed and documented @duexw

@ue71603 ue71603 assigned duexw and unassigned ue71603 Sep 30, 2024
@duexw
Copy link
Collaborator

duexw commented Oct 14, 2024

The NeTEx charging model does have some functional gaps when compared to the current version of the German VDV 452 1.6
Summary:

  • No explicit data object for charging stations and charging points (charging points may be modelled as Charging Equipments
  • No data on energy consumption of vehicles
  • No Matching between RECHARGING_EQUIPMENT_PROFILE and VEHICLE_CHARGING_EQUIPMENT (Can I charge vehicle x at station y)
  • Scheduled charging process not modelled at all. In case of opportunity charging you cannot express where in the vehicle schedule recharging takes place, at which charging point, start and end time, expected state of charge after the recharging process and so on.

For more details see
E-Bus-Charging_NeTEx_VDV452.pdf

@Aurige
Copy link
Contributor

Aurige commented Oct 14, 2024

Some comments... but we will discuss it on Wednesday:

No explicit data object for charging stations and charging points (charging points may be modelled as Charging Equipments)
Isn’t it Ok to do it via RechargingPointAssignment ?

No data on energy consumption of vehicles
same as other energies … is it needed ?

No Matching between RECHARGING_EQUIPMENT_PROFILE and VEHICLE_CHARGING_EQUIPMENT (Can I charge vehicle x at station y)
There is CouplignType+PugType +an open ended TypeofPlugRef … do we need more ?

Scheduled charging process not modelled at all. In case of opportunity charging you cannot express where in the vehicle schedule recharging takes place, at which charging point, start and end time, expected state of charge after the recharging process and so on.
Did you check the RechargingPlan ?

@Aurige
Copy link
Contributor

Aurige commented Oct 14, 2024

image

@duexw
Copy link
Collaborator

duexw commented Oct 15, 2024

OK, my fault - I looked at the UMLs from Nicks proposal only.

After reviewing the current TransmodelEcoSystem2024-EAv16-nk69.qea, it looks much better. Charging Processes are modelled and RechargingPointAssignment solves part of the problem.

Updated review document for discussion tomorrow:

E-Bus-Charging_NeTEx_VDV452_V2.pdf

@Aurige Aurige removed the needs documentation update The NeTEx document needs to be updated label Oct 28, 2024
@Aurige Aurige added the document has been updated NeTEx Document already updated label Oct 28, 2024
@Aurige
Copy link
Contributor

Aurige commented Oct 28, 2024

The fixes decided on October 16th are here #793
Closing this one
Note: the documentation for the part covered by this issue was already done by @nick-knowles

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
document has been updated NeTEx Document already updated enhancement non semantic enhacement: technical enhancement, etc. late_work
Projects
None yet
Development

No branches or pull requests

5 participants