diff --git a/SolarTaxonomyMaster.xlsx b/SolarTaxonomyMaster.xlsx index 8e24009..aa098ec 100644 Binary files a/SolarTaxonomyMaster.xlsx and b/SolarTaxonomyMaster.xlsx differ diff --git a/core/solar_2019-07-31_lab.xml b/core/solar_2019-07-31_lab.xml index fc96a15..8acc6ae 100644 --- a/core/solar_2019-07-31_lab.xml +++ b/core/solar_2019-07-31_lab.xml @@ -25,36618 +25,36911 @@ Initial Solar taxonomy--> xlink:role="http://www.xbrl.org/2003/role/link" xlink:type="extended"> + xml:lang="en">Information about the Environmental Site Assessment II. + xml:lang="en">Indicates if the Local Incentive Contract is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Approvals, Granting Employee + xml:lang="en">Table containing data about insurance and surety needed for IECRE certificates. + xml:lang="en">Expiration date of the UCC Precautionary Lease Filing, a legal form filed to indicate that they have or will have an interest in the property of the debtor. + xml:lang="en">Used to group information about permits related to a cultural resource on a site. + xml:lang="en">Amount of the Pro Forma gross income balance. + xml:lang="en">Identifier for Limited Liability Company Agreement. + xml:lang="en">Name of the individual or organization who can take advantage of the incentive. + xml:lang="en">Comment made during Residual Value Review + xml:lang="en">Name of individual or organization providing the security interest. + xml:lang="en">Information about the utility. + xml:lang="en">Credit Support, Parent Guarantee Identifier + xml:lang="en">Percentage of P50 energy variation expected between a given month to the same month in the following over a single standard variation year based on the historical variability of weather observed. + + + + xml:lang="en">Surplus Cash Applied to Collateral Account + xml:lang="en">Performance Guarantee [Abstract] + xml:lang="en">Entity, Vendor Code + xml:lang="en">Warranty review of Racking, Tracker or Parking Structure. + xml:lang="en">Ratio of measured to targeted power per IEC 61724-2, section 6.4. + xml:lang="en">Ratio of actual to expected energy production of projects. + xml:lang="en">Name of the company responsible for preparing the Equity Contribution Guarantee. + xml:lang="en">Site Environmental Condition Diesel Soot, Flag + xml:lang="en">Information about a Membership Interest Purchase Agreement which describes ownership in the Limited Liability Company (LLC). + xml:lang="en">Text of line item on the invoice for the financial transaction related to the Fund. + xml:lang="en">Financial Transaction For System [Line Items] + xml:lang="en">Represents information about an asset manager which can include number of megawatts and projects under management, states where the manager has operated, production statistics, NERC and FERC qualifications, as well as description of strategies for reporting, continuity programs, supply, remediation, insurance policies and REC accounting, and other information that may be helpful in making an evaluation. + xml:lang="en">The ratio of output power (or energy) to input power (or energy) for the inverter. + xml:lang="en">Master Services Agreement [Abstract] + xml:lang="en">Expected annualized AC capacity degradation on the project-level after the first year based on major design/energy production model used. + xml:lang="en">Expected average P50 insolation generated in kWh per square meter. The value can be reported for the period defined on the PeriodAxis, for example to record the average insolation for Q1, this element would be used with the PeriodFirstQuarterMember on the Period Axis. + xml:lang="en">Represents the time period of the month of August. Used for this month of any year. + xml:lang="en">Power Purchase Agreement, Invoices, Billing Contact, Telephone Number + xml:lang="en">Target Balance, Amount + xml:lang="en">Reserve Type [Line Items] + xml:lang="en">Items on the Independent Engineering Services Checklist regarding review of contracts. + xml:lang="en">Communications Expense, Amount + xml:lang="en">Information about the Project Administration Agreement with managing member to administer services required to operate the project. + xml:lang="en">Renewable Energy Credit Contract Structure, Description + xml:lang="en">Description of the asset manager plans for renewable energy credit (REC) accounting, for example through WREGIS, renewable energy registry and tracking. + xml:lang="en">Battery Inverter equipment. + xml:lang="en">Information about the co-tenancy agreement which is used when more than one system shares the tenants rights for a single property. + xml:lang="en">Information about the Permission To Operate Interconnection Approval for the project. + xml:lang="en">Period Month February [Member] + xml:lang="en">Effective date of the Qualifying Facilities Self Certification. + xml:lang="en">Power Purchase Agreement or Lease, Remaining Term + xml:lang="en">Information about the funds flow. + xml:lang="en">Weight of the Inverter. + xml:lang="en">Completion confirmation of remote SCADA system functionality at operator's facility via witness, e.g. screen sharing with operator. + xml:lang="en">Actual cost of penalties due to unavailability during period of the availability test in currency/kWh. + xml:lang="en">Indication that the MLPE (module level power electronics) has a device that will dynamically optimize the voltage-current combination of a string to maximize power. + xml:lang="en">Monthly Operating Report [Abstract] + xml:lang="en">REC Buyer Acknowledgement, Link + xml:lang="en">Represents information related to title policy exceptions. + xml:lang="en">Certificate Of Final Completion [Abstract] + xml:lang="en">Property Insurance [Abstract] + xml:lang="en">Asset Management Contract, Type, Description + xml:lang="en">Name of the counterparty to the lease. + xml:lang="en">Estimation Period Start Date [Axis] + xml:lang="en">Description of action suggested in the natural resource study. + xml:lang="en">Site Environmental Condition Hail, Flag + xml:lang="en">Test Condition Irradiance, Amount + xml:lang="en">Agreement Section Related To Action, Description + xml:lang="en">Nominal AC power rating of the System based on the design of the system in kWp. + xml:lang="en">Other Curtailment Model Factor, Percent + xml:lang="en">Description of the purchase option per the Limited Liability Company Agreement. + xml:lang="en">The start voltage of an inverter is the minimum voltage at which the inverter begins pulling power from the array. + xml:lang="en">Use of Funds, Third Party Identifier + xml:lang="en">Membership Certificate Of Lessee [Abstract] + xml:lang="en">Names of counterparties to the Supplemental Report Review Of Local Tax Review. + xml:lang="en">Cultural Resource Permit Action, Description + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Others if needed. + xml:lang="en">Model Inverter Loss, Amount + xml:lang="en">Used as identifier for title policy exclusions. + xml:lang="en">Lease Interest Accrued, Amount + xml:lang="en">Inverter Has Certification UL1741, Flag + xml:lang="en">Inverter Input, Strings Per Maximum Power Point Tracker, Number + xml:lang="en">Date of initial UCC (Uniform Commercial Code) filing. + xml:lang="en">Indicates if the Board Resolution for Master Lessee, Lessee and Operator is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Module Aperture Area + xml:lang="en">Name of the company responsible for preparing the Notice Of Approval. + xml:lang="en">Information about the performance of the asset manager by state. + xml:lang="en">Number of days over 30 days past due (delinquent). + xml:lang="en">Description of method used to calculate availability, which could be IECRE 61724-3 or some other method. + xml:lang="en">Availability Of Final Estoppel Certificate Power Purchase Agreement, Flag + xml:lang="en">PV Installation Permitting Fees Cost, Amount + xml:lang="en">System Performance Availability [Abstract] + xml:lang="en">Period Month November [Member] + xml:lang="en">Information about the Incentive Assignment. + xml:lang="en">Pro Forma Net Income Balance, Amount + xml:lang="en">Other Administrative Fees Per Watt + xml:lang="en">Identifier for Operations and Maintenance Subcontractor Contract. + xml:lang="en">Master Lessee Security Agreement, Expiration Date + xml:lang="en">Additional comments by user + xml:lang="en">Lease Escalator, End Date + xml:lang="en">Credit evaluation model used for the most recently obtained FICO score. + xml:lang="en">Inverter Input, Short Circuit Current DC + xml:lang="en">Status report on IE Reports. + xml:lang="en">Current Federal Tax Expense Benefit Per Watt + xml:lang="en">Permits and assessments review of DG Interconnection agreement (confirm completion). + xml:lang="en">Device Listing, Purchase Date + xml:lang="en">Name of the company that has or will install the system. + xml:lang="en">Renewable Energy Credit Contract, Term + xml:lang="en">System Dates [Abstract] + xml:lang="en">Test Lab Is NRTL, Flag + xml:lang="en">Ready for Procurement of Equipment, Date + xml:lang="en">Engineering, Procurement And Construction Agreement, Cap on EPC Liabilities, Amount + xml:lang="en">Maintenance cost of roads under warranty. + xml:lang="en">Amount of DC input in current, measured in amps. + xml:lang="en">Module Frame Material, Description + xml:lang="en">Preparer Of Lessee Claim Documents, Name + xml:lang="en">Effective date of the Environmental Site Assessment I. + xml:lang="en">Cost of security software upgrade. + xml:lang="en">Document Identifier, Advisor Invoices + xml:lang="en">Asset Manager Identifier [Axis] + xml:lang="en">Information specific to Tracker products that are used in the system. + xml:lang="en">Identifier for UCC Precautionary Lease Filing. + xml:lang="en">Availability Of Final Interconnection Agreement, Flag + xml:lang="en">Installation Altitude, Length + xml:lang="en">Preparer Of Lessee Collateral Agency Agreement, Name + xml:lang="en">Document Identifier, Local Incentive Contract + xml:lang="en">Wiring Instructions Exceptions, Description + xml:lang="en">Actual Cost of Penalties From Lost Energy Cost Per kWdc, Amount + xml:lang="en">Energy Budget, System Performance Degradation, Percent + xml:lang="en">Completion Of Functional Test [Member] + xml:lang="en">Performance ratio, non-weather corrected, percent, calculated per IEC 61724-3. + xml:lang="en">Preparer Of Casualty Insurance Policy Insurance Policy, Name + xml:lang="en">Expiration date of the Hedge Agreement. + xml:lang="en">Battery [Member] + xml:lang="en">Punch List, Link + xml:lang="en">Purchase price of the project company in the Master Purchase Agreement which covers the agreement of the developer to sell the assets to the investor. + xml:lang="en">Document Identifier, Property Insurance Policy + xml:lang="en">Guarantee Beneficiary + xml:lang="en">Power Target Cap Measurement, Power + xml:lang="en">Vegetation Management Cost Per Acre, Amount + xml:lang="en">Regulatory Application, Approval Date + xml:lang="en">Review Of Construction Monitoring [Member] + xml:lang="en">Operational budget review of Decommissioning. + xml:lang="en">Module Performance Warranty, Guaranteed Output + xml:lang="en">Names of counterparties to the UCC Tax Lien and Judgment Lien Searches. + xml:lang="en">Utility Details [Line Items] + xml:lang="en">UCC Tax Lien and Judgment Lien Searches, Effective Date + xml:lang="en">Employee, Last Name + xml:lang="en">Time stamp indicating first day of IEC 61724-3 test, administered under OD-402. + xml:lang="en">Password and login id for combination lock for installation and for equipment. + xml:lang="en">Optimizer Maximum Input Current + xml:lang="en">Power Purchase Agreement, Expected Revenue, Inception To Date, Amount + xml:lang="en">Identifier for Operating Agreements For Master Lessee, Lessee And Operator. + xml:lang="en">Document Preparer Of Supplemental Report Review Of Local Tax Review, Name + xml:lang="en">Information contained in the servicing for a project lease. + xml:lang="en">Energy Contract Hourly Rate, Hour 10 [Member] + xml:lang="en">The length of service to an employer from the start of employment until the date of the loan. + xml:lang="en">Cross Default Pool for Membership Interest Purchase Agreement, Flag + xml:lang="en">Counterparties To The Lessee Claim Documents, Names + xml:lang="en">Indicates if the Construction Loan Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Parent Guarantee, Beneficiary + xml:lang="en">Revenue Meter Enclosure, Description + xml:lang="en">Initiation date of the Engineering Procurement and Construction performance guarantee that the project will perform at a certain level of energy output. + xml:lang="en">PowerPurchaseAgreementContractTermsFinancialAssurances + xml:lang="en">Name of the company responsible for preparing the Pricing Model Report. + xml:lang="en">Document Identifier, Membership Interest Purchase Document + xml:lang="en">Reserve Type [Domain] + xml:lang="en">Used to identify classes of reserves used to finance a solar installation which can be for the fund or the project. + xml:lang="en">OffTaker Contract Review Considered, Flag + xml:lang="en">Technician System Employees, Count + xml:lang="en">Indicates if the LCC Registration is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Approvals, Availability of Proof, Flag + xml:lang="en">Period First Quarter [Member] + xml:lang="en">Revenue Meter Dimensions, Width + xml:lang="en">Fund [Table] + xml:lang="en">Link to the Transmission Report And Curtailment Estimate document. + + xml:lang="en">Proforma and actual cost of vegetation management in currency per acre. + xml:lang="en">Power Factor + xml:lang="en">Closing Documents, Link + xml:lang="en">Optimizer Has Certification EN61000, Flag + xml:lang="en">Information about insolation performance measures, measured and expected. + xml:lang="en">Power Purchase Agreement, Curtailment Provisions, Description + xml:lang="en">Site review of system impact, facility or interconnection study. + xml:lang="en">Description of fund prospectus' and other reports provided to investors for the current fund. + xml:lang="en">Term Sheet [Abstract] + xml:lang="en">Expiration date of the Interconnection Approval. + xml:lang="en">Effective date of the Monthly Operating Report, which documents monthly statistics on insolation, energy, availability and performance. + xml:lang="en">Module Has Certification IEC61646, Flag + xml:lang="en">Used to group information about a single piece of equipment used in a system. + xml:lang="en">Term Sheet Exceptions, Description + xml:lang="en">Availability Of Interconnection Approval, Flag + xml:lang="en">Details about the site lease. For example, could include existence of a land remediation bond. + xml:lang="en">Names of counterparties to the Renewable Energy Credit Buyer Acknowledgement. + xml:lang="en">Description of the operations manager warranty claims experience and warranty work management. + xml:lang="en">Transmission and curtailment report, tracking account estimate (for project settling on LMP market). + xml:lang="en">Information about insurance and surety needed for IECRE certificates. + xml:lang="en">Names of counterparties to the Lessee Collateral Agency Agreement. + xml:lang="en">Tax Indemnity Agreement, Federal Tax Incentive Indemnity Cap, Amount + xml:lang="en">Inverter, Maximum MPP Voltage + xml:lang="en">Power Purchase Agreement, Notices Contact, Telephone Number + xml:lang="en">Building Inspection, Effective Date + xml:lang="en">Availability Of Exceptions To The UCC Precautionary Lease Filing, Flag + xml:lang="en">Region where power is sold, for example California CAISO, MISO, New England, New York, Northwest, PJM, Southeast, Southwest, SPP, Texas which are markets named at ferc.gov. + xml:lang="en">Independent Engineering Services Checklist Substantial Or Final Completion Review [Member] + xml:lang="en">Environmental Site Assessment II, Effective Date + xml:lang="en">Device Listing Manual, Link + xml:lang="en">Project Working Capital Account Required, Amount + xml:lang="en">Zoning Permit, Upfront Fee, Amount + xml:lang="en">Cross Default Pool, Both Parties Cross, Flag + xml:lang="en">Preparer Of Design And Construction Documents, Name + xml:lang="en">Operator Performance Guarantee, Sponsor Performance Guarantee, Description + xml:lang="en">Federal tax identification number for the Asset Manager. + xml:lang="en">Indicates if the LCC Registration is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability Of Term Loan, Flag + xml:lang="en">Availability Of Exceptions To The Interconnection Agreement, Flag + xml:lang="en">Availability Of Permission To Operate Interconnection Approval, Flag + xml:lang="en">Cost of repairs. + xml:lang="en">Site Lease Assignment, Effective Date + xml:lang="en">Availability Of Exceptions To The Wiring Instructions, Flag + xml:lang="en">Recipient Of Wire Amount, Name + xml:lang="en">Availability Of Final Construction Loan Agreement, Flag + xml:lang="en">Operational Issues, Average Time Between Equipment Failures + xml:lang="en">ISO country code where the equipment manufacturer is located. + xml:lang="en">Component Maintenance [Line Items] + xml:lang="en">Information about the backup operations and maintenance plan. + xml:lang="en">Equipment review of Telco Infrastructure. + xml:lang="en">Indication that the MLPE (module level power electronics) allows monitoring at the module level. + xml:lang="en">Availability Of Final Qualifying Facilities Self Certification, Flag + xml:lang="en">Indicates if the appraisal considers the cost approach. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Account Name for funds flow wire instructions for parties involved in the transaction. + xml:lang="en">Percentage of site based on units per the Power Purchase Agreement. + xml:lang="en">Information about the MLPE (module level power electronics). - - + xml:lang="en">Fund Description [Abstract] + xml:lang="en">Initial Uniform Commercial Code, Filing Date + xml:lang="en">Information about the use of funds for a financing event. + xml:lang="en">The amount of power consumed during the night. + xml:lang="en">Sale Leaseback Contract For Project [Abstract] + xml:lang="en">Expiration date of the installation agreement. + xml:lang="en">Period Month June [Member] + xml:lang="en">Indicates if the module has a microinverter, if it does, TRUE; if it does not, FALSE. + xml:lang="en">Availability Of UCC Security Agreement, Flag - - - + xml:lang="en">Guarantee Payment, Scaling Factor, Percent + xml:lang="en">Document Identifier, Insurance Consultant Report + xml:lang="en">Information about the inverter related to the battery. + xml:lang="en">System Availability Achievement Requirement, Reconciliation Period, Description + xml:lang="en">Indicates if the obligor is an SPV or a counterparty. + xml:lang="en">Transmission Report and Curtailment Estimate [Abstract] + xml:lang="en">Special Regulatory Features, Description + xml:lang="en">Description of any exceptions to the Renewable Energy Credit Buyer Acknowledgement or issues raised. + xml:lang="en">Indicates if the meter meets Performance Based Incentive Program eligibility with certificate documenting accuracy to less than 2%. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Availability Of Appraisal, Flag + xml:lang="en">Surety Bond, Effective Date + xml:lang="en">Inverter Has Certification IEC62109-1, Flag + xml:lang="en">Inverter has certification IEC62109-2, Safety of Power Converters for Use in PV Power Systems, Part 2: Particular Requirements for Inverters. + xml:lang="en">Indicates if there are exceptions to the funding proposal request. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Average amount of rent over any 6 month time period during the lifetime of the lease. + xml:lang="en">Inverter Static MPPT Efficiency, Percent + xml:lang="en">Effective date of the Membership Certificate of Master Lessee. + xml:lang="en">Type of financial contract between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company, which can be Lease, PPA, Loan, Cash, Upfront, PSA or Unknown. + xml:lang="en">Fund Insurance [Abstract] + xml:lang="en">Security Interests, Status + xml:lang="en">The maximum amount of power (kW) drawn for any given time interval (typically 15 minutes) during the billing period, multiplied by the relevant demand charge ($/kW). Demand charges are fees applied to the electric bills of commercial and industrial customers based upon the highest amount of power drawn during any interval during the billing period. + xml:lang="en">Description of developer's EPC (Engineering Procurement and Construction) warranty strategy. + xml:lang="en">Inverter Power Level [Line Items] + xml:lang="en">Roof Type + xml:lang="en">Document Identifier, Engineering Procurement And Construction Contract + xml:lang="en">Name of the company responsible for preparing the Site Lease Assignment. + xml:lang="en">Operator Guarantee, Expiration Date + xml:lang="en">Power Purchase Agreement, Time of Use Pricing Schedule, Flag + xml:lang="en">Availability Of Final Closing Indemnity Agreement, Flag + xml:lang="en">Indicates if the project has a production based incentive (PBI). If it has a PBI, TRUE; if not, FALSE. + xml:lang="en">Project Recent Event, Severity Of Event + xml:lang="en">Preparer Of Qualifying Facilities Self Certification, Name + xml:lang="en">Operational Performance, Days Of Production Lost + xml:lang="en">Table reflecting information about arrays, which are comprised of sub arrays; and sub arrays which are PV surface units with the same angle and orientation which combine together to make an array. + xml:lang="en">Basis for Measurement of Uncertainty, Description + xml:lang="en">Output guaranteed in the Power Purchase Agreement in kWh. + xml:lang="en">Text of line item on the invoice for the financial transaction related to the system. + xml:lang="en">Parent Company [Abstract] + xml:lang="en">Description of the asset manager's strategy to manage consumable parts, which are items such as fuses that are used up quickly and must be replenished. + xml:lang="en">Document Identifier, Casualty Insurance Policy Insurance Policy + xlink:from="solar_SystemName" + xlink:to="label_solar_SystemName" + xlink:type="arc"/> + xml:lang="en">Name of the system. + xml:lang="en">Preparer Of Bill Of Sale, Name + + xml:lang="en">Availability Of Exceptions To The Renewable Energy Credit Offtake Agreement, Flag + xml:lang="en">Link to the Notice Of Commercial Operations document. + xml:lang="en">Closing Indemnity Agreement [Abstract] + xml:lang="en">Energy Production Insurance [Line Items] + xml:lang="en">Availability Of Term Sheet, Flag + xml:lang="en">Represents 23:00 in 24 hour military time, 11:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Operational Issues, Date And Time Production Resumed + xml:lang="en">Counterparties To The Certificate Of Acceptance Report, Names + xml:lang="en">Energy Unavailability Excluding External Or Other Outages Comparison + + + + + xml:lang="en">Availability Of Exceptions To The Master Lessee Security Agreement, Flag + xml:lang="en">Availability Of Final Certificates Of Insurance, Flag + xml:lang="en">Subaccount number of the recipient of the wired funds. + + + + + + + xml:lang="en">Operations Manager Performance Guarantees, Description + xml:lang="en">Project Identifier [Axis] + xml:lang="en">Average Ambient temperature of the site over a given time period based on major design/energy production model used. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Comments written about the maintenance ticket. + xml:lang="en">AC Disconnect Switch [Member] + xml:lang="en">Property Tax Exemption Opinion [Abstract] + xml:lang="en">Combiner Box Temperature + xml:lang="en">Module Nameplate [Abstract] + xml:lang="en">Entity State + xml:lang="en">Legal Entity Identifier of the parent company of the entity. + xml:lang="en">Indicates if the Operations Manual is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Legal Entity Type, Description + xml:lang="en">Design review of the Electrical IFC (Industrial Foundation Classes) Drawings including substation(s). + xml:lang="en">Description of any exceptions to the Interconnection Agreement. + xml:lang="en">Description of the amortization method, for example straight line, 200% declining. + xml:lang="en">Independent Engineering Services Checklist Review Of Report Status [Member] + xml:lang="en">Timing of the upfront fee for the zoning permit. + xml:lang="en">Information about the Operations Manual for the project. + xml:lang="en">Expected Energy At Unavailable Times + xml:lang="en">Link to the documentation URI for the SCADA System. + xml:lang="en">Data Acquisition Systems Manufacturer, Contact Name and Title + xml:lang="en">Description of any exceptions to the Environmental Site Assessment II or issues raised. + xml:lang="en">Component Maintenance Cost Under Warranty [Abstract] + xml:lang="en">Name of the company responsible for preparing the Master Services Agreement. + xml:lang="en">Minimum voltage at which the inverter can deliver its rated power + xml:lang="en">Indicates if there are exceptions to the Monthly Operating Report or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Supplemental Report Review Of Local Tax Review [Abstract] + xml:lang="en">Performance Based Incentive Escalator, Percent + xml:lang="en">Developer Identifier [Axis] + xml:lang="en">Link to the Title Survey document. + xml:lang="en">Environmental Site Assessment [Table] + xml:lang="en">Units, for example, months, years, for the reconciliation period during which the system availability must be met. + xml:lang="en">Name of the company responsible for preparing the UCC Tax, Lien and Judgment Lien Searches. + xml:lang="en">Indicates if there are exceptions to the Supplemental Report Review Of Local Tax Review or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Holdback final completion payment amount per the pricing model. + xml:lang="en">Module, Length + xml:lang="en">Represents information about exclusions to title policies for a site. + xml:lang="en">Date Tax Rebate is applied + xml:lang="en">Identifier for Other Equipment Due Diligence Reports. + + xml:lang="en">Barometric pressure at the site. + xml:lang="en">Information that provides a general overview of financing. + xml:lang="en">Trust Company (Trustee) + xml:lang="en">Next date when the rate is expected to be adjusted, for example, when the escalator will go into effect. + xml:lang="en">Team name for the employee. + xml:lang="en">Number of states where Operations and Maintenance manager operates. + xml:lang="en">Data Acquisition System, IP Address + xml:lang="en">Reserve Balance Actual, Amount + xml:lang="en">Model Weather Source + xml:lang="en">Term of the original Power Purchase Agreement, calculated by Last Payment Date minus First Payment Date. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Amount of expense classified as other. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Link to the Pledge Agreement document. + xml:lang="en">Identifier for the zoning permit related to a site. + xml:lang="en">Used as the identifier for the zoning permit. + + xml:lang="en">Periodic Budget Identifier [Axis] + xml:lang="en">Credit Support for Term Loan Agreement, Flag + xml:lang="en">Used to group a listing of information about a Parent Company. - + xml:lang="en">Represents 14:00 in 24 hour military time, 2:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Email address of the entity. + xml:lang="en">Site Control, Effective Date + xml:lang="en">Description of the asset manager's strategy to manage spare parts. + xml:lang="en">Link to the Bill Of Sale document. + xml:lang="en">Utility [Table] + xml:lang="en">Indicates if the Certificate Of Completion is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Estimated energy lost in kWh which could be associated with a specific event or downtime. + xml:lang="en">Guarantee, Link + xml:lang="en">Document Identifier, Independent Engineering Report + xml:lang="en">IECRE Measured Performance Data [Abstract] + xml:lang="en">Financing Event, Date + xml:lang="en">Cultural Resource Permit [Table] + xml:lang="en">Initial monthly savings the utility is expected to receive for first year based as the percentage cost difference per kilowatt hour. + xml:lang="en">Availability Of Design And Construction Documents, Flag + xml:lang="en">Optimizer Maximum Input Voltage + xml:lang="en">Cross Default Pool Identifier [Axis] + xml:lang="en">Test Was Calibrated, Flag + xml:lang="en">Employee Role, Type + xml:lang="en">Prepaid Expenses, Amount + xml:lang="en">End date for the time period + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Asset Management. + xml:lang="en">Indication as to whether revenue meter kVar data has been collected. If data has been collected, TRUE; if data has not been collected, FALSE. + xml:lang="en">Battery Management System [Member] + xml:lang="en">Indicates if the Insurance Consultant Report is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Inverter is at 100% power level. + xml:lang="en">Insurance Payment Received, Amount + xml:lang="en">Indicates if the Notice of Commercial Operations Date is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Remaining value of the project after the lease term or project ends. + xml:lang="en">Punch List [Abstract] + xml:lang="en">Table used to capture information about financial and production performance data, comparing predicted to actual. + xml:lang="en">Amount of the Local Incentive Contract. + + xml:lang="en">Preparer Of Engineering Procurement And Construction Contract, Name + xml:lang="en">Indication if test results were submitted for securement, humidity-freeze, and temperature cycling. If they were, TRUE; if they were not, FALSE. + xml:lang="en">Start date of the guarantee. + xml:lang="en">Expiration date of the Renewable Energy Credit Contract performance guarantee. - + xml:lang="en">Represents 17:00 in 24 hour military time, 5:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Represents the time period of the month of April. Used for this month of any year. + xml:lang="en">Information about measured energy related to the system. + xml:lang="en">Revenue Meter, Power Factor + xml:lang="en">Subcontractor [Abstract] + xml:lang="en">Description of the type of counterparty. For example, trust. + xml:lang="en">Environmental Site Assessment I [Line Items] + xml:lang="en">Link to the Property Tax Exemption Opinion document. + xml:lang="en">Appraisal Status, Description + xml:lang="en">UCC Precautionary Lease Filing, Link + xml:lang="en">Cultural Resource Permit Action [Table] + xml:lang="en">Natural Resource Permit, Issue Date + xml:lang="en">Inverter Input Nameplate [Abstract] - - + xml:lang="en">Indicates if the module factory audit report is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Cap on indemnity that the investor receives from the project developer for potential investment tax credit recapture per the Tax Indemnity Agreement. + xml:lang="en">Email address of the insurance carrier or the surety carrier. + xml:lang="en">Contract Review Washing Plan [Member] + xml:lang="en">Description of units used to measure the guarantee. For example, performance guarantees require certain level of energy output (kWh). + xml:lang="en">Bank Account Type, Description - - + xml:lang="en">Preparer Of Local Incentive Contract, Name + xml:lang="en">Product Identifier, Meteorological Station [Abstract] + xml:lang="en">Names of counterparties to the Security Agreement Supplement. + xml:lang="en">Description of any exceptions to the Renewable Energy Credit Offtake Agreement or issues raised. + xml:lang="en">Developer Portfolio Performance Guarantee, Link + xml:lang="en">Renewable Energy Credit Expected, Amount + xml:lang="en">Module Technology, Type Detailed + xml:lang="en">Used for state abbreviation codes. + xml:lang="en">Availability Of Exceptions To The Tax Indemnity Agreement, Flag + xml:lang="en">Availability Of Host Acknowledgement, Flag + xml:lang="en">Other Payments To Financiers, Amount Per Watt + xml:lang="en">Inverter Input, Maximum Operating Current DC + xml:lang="en">Effective date of the Certificates of Insurance. + xml:lang="en">The name of the Principal to a surety bond, which is a promise by a surety or guarantor to pay one party (the obligee) a certain amount if a second party (the principal) fails to meet some obligation, such as fulfilling the terms of a contract. + xml:lang="en">Availability Of Tax Indemnity Agreement, Flag + xml:lang="en">Revenue Meter Rating, Continuous Current + xml:lang="en">Electrical Inspection [Abstract] + xml:lang="en">Description of the type of financing structure, for example, Partnership, Sale/Leaseback, Other. + xml:lang="en">Issue Detail, Future Steps, Description + xml:lang="en">Description of the location of the cultural resource. + xml:lang="en">The Legal Entity Identifier for the utility. + xml:lang="en">Description of the energy forecasting and settlement capabiities and tools of the asset manager. + + + xml:lang="en">Description of any exceptions to the Site Lease Assignment or issues raised. + xml:lang="en">Inverter Power Factor + xml:lang="en">Description of the Environmental Site Assessment which evaluates the environmental impact of the site, including the scope of the report such as whether the full site is covered. + xml:lang="en">Abstract for the Cut Sheet Document + xml:lang="en">Availability Of Final Membership Certificate Of Master Lessee, Flag + xml:lang="en">Financial Transaction For System, Counterparty Name - + xml:lang="en">Start date for the time period + xml:lang="en">Independent Engineering Production Estimate Report [Abstract] + xml:lang="en">Type of child company which can be counterparty or Special Purpose Vehicle. + xml:lang="en">Information about the Limited Liability Company Agreement, between the project company, developer and investor. + xml:lang="en">Effective date of the Module Accelerated Age Test Report. + xml:lang="en">Asset Manager Reporting, Description + xml:lang="en">Warranties Review Medium Voltage Transformers [Member] + xml:lang="en">Effective date of the Construction Monitoring Report. + xml:lang="en">Module, Depth + xml:lang="en">Document Identifier, Incentive Assignment + xml:lang="en">Master Services Agreement, Effective Date + xml:lang="en">Bank Investment, Amount + xml:lang="en">Tax Indemnity Agreement, Expiration Date + xml:lang="en">Renewable Energy Credit Buyer Acknowledgement [Abstract] + xml:lang="en">Status Report Of Independent Engineering Opinion Documents [Member] + xml:lang="en">Information about the actual and expected credit amounts of the Renewable Energy Credit + + + + xml:lang="en">Description of insurance requirement. + xml:lang="en">Third Party, Vendor Code + xml:lang="en">Assessors parcel number, or APN, which is a number assigned to parcels of real property by the tax assessor of a particular jurisdiction for purposes of identification and record-keeping. + xml:lang="en">Date on which the investor's target return has been reached, also called the flip point. + xml:lang="en">Renewable Energy Credit OffTake Agreement [Abstract] + xml:lang="en">Used to represent information about financing events that may be needed for an IECRE certificate. + xml:lang="en">Date on which the permit was issued. + xml:lang="en">Information about curtailment model factor estimates. + xml:lang="en">Independent Engineering Services Advisor Opinion, Description + xml:lang="en">Kroll credit rating of the entity. + + + xml:lang="en">Description of any exceptions to the Module Accelerated Age Test Report. + xml:lang="en">Unique identifier used to identify the product. + xml:lang="en">Master Services Agreement, Budgeted Amount + xml:lang="en">Module [Member] + xml:lang="en">Developer Project Guaranteed Output, Energy + xml:lang="en">Used as the identifier for the Sponsor Group. + xml:lang="en">System [Abstract] + xml:lang="en">Energy Budget, Year 1 Energy Yield, Percent + xml:lang="en">Use of Funds Project Specific, Flag + xml:lang="en">Counterparties To The Building Inspection, Names + xml:lang="en">Counterparties To The Qualifying Facilities Self Certification, Names + xml:lang="en">Document Identifier, Master Lease Document + xml:lang="en">Additional comments about the credit support. + xml:lang="en">Preparer Of Membership Certificate Of Master Lessee, Name + xml:lang="en">Author of the Independent Engineering Production Estimate report. + xml:lang="en">Expected flip period for the partnership based on a P99 yield. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Actual measured insolation divided by P50 insolation from inception to date. + xml:lang="en">Availability Of Site Lease Access Agreement, Flag + xml:lang="en">Indicates whether the FICO score was calculated using the Classic or Next Generation model. + xml:lang="en">Equipment review of Racking, Tracker or Parking Structure. + xml:lang="en">Operations And Maintenance Contract, Rate Escalator, Percent + xml:lang="en">Indicates if high insolation conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Minimum percent of P50 expected energy production output guaranteed such that if output falls below that level, a refund will be made. For example, if output is guaranteed to be 98% or higher, the minimum threshhold is 98%. If output falls below 98%, a refund will be made. + xml:lang="en">Sum of expected energies for both times of availability and unavailability, calculated as Expected Energy At Revenue Meter + Expected Energy At Unavailable Times. This element should be used with the Period Axis to indicate the period. + xml:lang="en">Developer Renewable Operating Experience, Description + xml:lang="en">Counterparties To The Design And Construction Documents, Names + xml:lang="en">Date on which the Qualified Facility (QF) or Exempt Wholesale Generators (EWG) application was submitted. + + xml:lang="en">Indicates if the Supplemental Report Review Of Insurance Review is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of the Monitoring Contract rate type defined in the Monitoring Contract between the project company and engineering company to monitor system performance. + xml:lang="en">Date and time production stopped to resolve reported issue + xml:lang="en">Inverter has certification IEC61683, for Power Conditioners - Procedure for Measuring Efficiency. + xml:lang="en">Indicates if salt air conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Availability Of Equipment Warranties, Flag + xml:lang="en">Used as the identifier for the zoning covenant. + + + xml:lang="en">Information about the retail credit performance of the off-taker. + xml:lang="en">Power Purchase Agreement, Production Guarantee, Energy + xml:lang="en">Length of Individual Issue in Days + xml:lang="en">Preparer Of Permission To Operate Interconnection Approval, Name + xml:lang="en">Ratio of active (real) energy generation of system divided by energy that would have been generated if the system was operating continuously at its AC rated power typically over a year but could be over another measurement period, per IEC 61724-3 Section 6.8.2. + xml:lang="en">Indicates if the Assignment of Interest is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Use to group a listing of information about the approval condition for a financing event. + xml:lang="en">Status of the American Land Title Association Survey (ALTA). + xml:lang="en">LCC Registration [Abstract] + xml:lang="en">Preparer Of Certificate Of Final Completion, Name + xml:lang="en">Date of the funding of the project. + xml:lang="en">Document Identifier, Environmental Assessment I + xml:lang="en">Pricing File, Effective Date + xml:lang="en">Security Interest in Asset Management Agreement, Flag + xml:lang="en">Site Longitude At Revenue Meter + + xml:lang="en">Actual estimated cost for future lost revenue from lost energy generation during period of the availability test in currency/kWh. + xml:lang="en">Measure of system availability (uptime), calculated by taking the ratio of total useful time (time during which the plant is operating without taking any exclusion factors into account) minus total downtime, divided by the total useful time, multipled by 100. Total useful time is defined as the time when the plant is exposed to irradiation levels above the generator’s Minimum Irradiance Threshold (MIT). This measure is sourced from Solar Power Europe. + xml:lang="en">Actual incentive cost from inception to date, cumulative per month, cumulative per year. - + xml:lang="en">Title Policy Available, Flag + + xml:lang="en">Approval Condition [Line Items] + xml:lang="en">Cost of permits and licenses needed for the solar installation. + xml:lang="en">Amount paid by the lessor which is probably the bank, to purchase the project. + xml:lang="en">Maintenance cost of DAS SCADA Telecomm under warranty. + xml:lang="en">Funding Proposal Request, Expiration Date + xml:lang="en">Availability of string level data, which refers to a feed of energy coming from a single panel. If string level data is available, TRUE; if not available, FALSE. + + xml:lang="en">Aperture area of the module, measured by the long side of the module multiplied by the short of the module, measured in square meters. Also called A_c. + xml:lang="en">Information about testing requirements for inverter cut sheets. + xml:lang="en">The default domain of the period axis. + xml:lang="en">Name of the company responsible for preparing the Funding Memo. + xml:lang="en">Description of certifications available for the module. + xml:lang="en">Represents information about the approval memo for a financing event which may include the a description of the memo, date and link to the memo. + xml:lang="en">Actual Power Purchase Agreement Revenue divided by expected Power Purchase Agreement revenue inception to date. + xml:lang="en">Document Identifier, Operational Event Report + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of PPA. + xml:lang="en">Pledge Agreement [Abstract] + + xml:lang="en">Description of any exceptions to the Host Acknowledgement or issues raised. + xml:lang="en">Renewable Energy Credit, Actual To Expected Revenue, Percent + xml:lang="en">Names of counterparties to the liability insurance certificate. + xml:lang="en">Supply Agreements Exceptions, Description + xml:lang="en">Indicates if there are exceptions to the Master Lease. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Used to collect information about actual and predicted performance data. + xml:lang="en">Electrical Inspection, Effective Date + xml:lang="en">Account Number for funds flow wire instructions. + xml:lang="en">Appraised Value, Fair Market Value, Amount + xml:lang="en">Number Of Offtakers In Fund + xml:lang="en">Identifier for Membership Certificate Of Lessee. + xml:lang="en">Names of counterparties to the Estoppel Certificate Power Purchase Agreement. + xml:lang="en">Document Identifier, Renewable Energy Credit Buyer Acknowledgement + xml:lang="en">Used as the identifier for studies about the natural resource. + xml:lang="en">Operations Manager Workflow, Description + xml:lang="en">Document Identifier, Equity Capital Contribution Document + xml:lang="en">Component Maintenance Cost (Under Warranty) Racking/Tracker, Amount + xml:lang="en">Total of all project account balances at the end of the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. - - + xml:lang="en">Second line of the address of the equipment manufacturer. + xml:lang="en">Link to the UCC Precautionary Lease Filing document. + xml:lang="en">Module Bypass Diode, Optimal Number + xml:lang="en">Other Permits [Abstract] + xml:lang="en">Amount of the rebate coming from the state. + xml:lang="en">Preparer Of Commitment Agreement, Name + xml:lang="en">Expected system production at P50 which is the expected energy production reached with a probability of 50%. This element is used with the PeriodAxis to indicate the period of production. Usually this will be a year. + xml:lang="en">Third Party Roles Details [Line Items] + + xml:lang="en">Funding Memo [Abstract] + xml:lang="en">Inverter has certification other than UL1741, IEC61683, IEC62109-1, or IEC62109-2. If it does, then list the certifications. + xml:lang="en">Snow Model Factor, Typical Met Month, Percent + xml:lang="en">Lease Rent Payments (Net of Collateral Account) + xml:lang="en">Used as the identifier for Credit Support Amount. + xml:lang="en">Performance Guarantee, Term + + + + xml:lang="en">Information about contracts that may be related to the cross default pool. + xml:lang="en">Fund Investor Holding Company, Name + xml:lang="en">Allows reporting of multiple events that occur associated with the ongoing operations of a project. Data reported can include title, date, time before responding to the event, action agreed upon to respond, priority of corrective action. + xml:lang="en">Optimizer Maximum Output Voltage + xml:lang="en">Supply Agreements, Expiration Date + xml:lang="en">Indicates if there are exceptions to the Supply Agreements or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Module Pre-Qualification Tests (IEC and Extended Testing). + + xml:lang="en">Inverter Maximum Efficiency, Percent + xml:lang="en">Name of the company responsible for preparing the Equipment Warranties. + xml:lang="en">Zoning Permit Renewable, Flag + xml:lang="en">Letter Of Credit Guarantee Purpose, Description + xml:lang="en">Availability Of Final Membership Certificate Of Lessee, Flag + xml:lang="en">Product Identifier, Logger [Abstract] + + xml:lang="en">Name of the insurance company for the title insurance. + xml:lang="en">Counterparties To The Closing Indemnity Agreement, Names + xml:lang="en">General Insurance Expense Per Watt + xml:lang="en">Number of sites per Site Control. + xml:lang="en">Model Low Irradiance Loss, Amount + xml:lang="en">Availability Of Final LLC Formation Documents, Flag + xml:lang="en">Information about the rates in the Power Purchase Agreement. + xml:lang="en">Notice And Payment Instructions, Link + xml:lang="en">Other Equipment Due Diligence Reports [Abstract] + xml:lang="en">Revenues Per Watt + xml:lang="en">Name of the company responsible for preparing the Business Interruption Insurance Policy. + xml:lang="en">Information about the Site Lease Agreement. + xml:lang="en">Inverter Night Tare Loss, Amount + xml:lang="en">Date of the payment deadline for the performance based incentive. + xml:lang="en">Decommissioning, Date + xlink:label="label_solar_InterconnectionApprovalEffectiveDate" + xlink:role="http://www.xbrl.org/2003/role/label" + xlink:type="resource" + xml:lang="en">Interconnection Approval, Effective Date + xml:lang="en">Other Equipment Due Diligence Reports, Effective Date + xml:lang="en">Project Hedge Agreement Type + xml:lang="en">Expense to store consumables, which are parts that are expected to be used up and in need of replacement on a regular basis, like fuses. + xml:lang="en">Indicates if there is security interest in the Equity Capital Contribution Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Operations And Maintenance Contract, Expiration Date + xml:lang="en">Date of the partnership flip when the annual energy output is a P50 yield. + xml:lang="en">Amount of energy lost due to curtailment based on major design/energy production model.To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">Names of counterparties to the Title Survey. - - + xml:lang="en">Description of the Title Policy Exclusion. + xml:lang="en">Maximum voltage that the optimizer can output. - + xml:lang="en">Used as the identifier for the zoning permit document. + xml:lang="en">Primary Operations And Maintenance Subcontractor, Phone + xml:lang="en">Preparer Of Vegetation Management Agreement, Name + xml:lang="en">Information about the LLC Formation Documents for the project. + xml:lang="en">Lease Contract For Project [Abstract] + + xml:lang="en">Description of any exceptions to the Electrical Inspection or issues raised. + xml:lang="en">Project Regulatory Information [Abstract] + xml:lang="en">Component Maintenance, Percent Completed + xml:lang="en">Availability Of Final Financial Lease Schedule, Flag + xml:lang="en">Information about various climate classifications that can be used to indicate the climate of a site. + xml:lang="en">Entity Size, Storage, Energy + xml:lang="en">Period Month October [Member] + xml:lang="en">SCADA Systems, Number Of Units + xml:lang="en">Inverter Dimensions [Abstract] + xml:lang="en">Data Acquisition Systems Manufacturer, Email Address + xml:lang="en">Names of counterparties to the Environmental Site Assessment I. + + xml:lang="en">Contract term of the partnership flip. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Pretax cash return percent per the pricing model. + xml:lang="en">Closing Certificate Exceptions, Description + xml:lang="en">The time between detecting the problem (receipt of the alarm or noticing a fault) and the acknowledgement of the fault by the O&M Contractor which is signaled by dispatching a technician. The acknowledgement time reflects the O&M Contractor’s operational ability. The value should be entered as a durationItemType using the ISO8601 format of PnYnMnDTnHnMnS. Acknowledgement Time may also be called Reaction Time, where H means hours, M means minutes, and S means seconds. + xml:lang="en">Entity Details [Line Items] + xml:lang="en">Performance Guarantee, Provider + xml:lang="en">Use to group a listing of information about the source of funds for a financing event. + xml:lang="en">Parent Guarantee, Duration + xml:lang="en">Information about reports and documents used to evaluate independent engineering services. + xml:lang="en">DC Nameplate capacity which is the sum of module ratings at standard test conditions as defined in the design. + xml:lang="en">Used to group information about the zoning permit. + + xlink:from="solar_FundDescriptionCurrentSimplePaybackEndDate" + xlink:to="label_solar_FundDescriptionCurrentSimplePaybackEndDate" + xlink:type="arc"/> + xml:lang="en">End date of simple payback period. + xml:lang="en">Description of the version of the appraisal. + xml:lang="en">Credit Support Amount [Table] - + xml:lang="en">Project Financing [Abstract] + xml:lang="en">Expense for scheduling and forecasting service for most utility scale projects. + xml:lang="en">Information about products used in the system, for example, ABC brand of inverters, or XYZ brand of module. + xml:lang="en">Lease Federal Tax Identifier For Lessee + xml:lang="en">Information about Commercial General Liability insurance. + xml:lang="en">Unavailability is a metric that quantifies the amount of energy lost when the system is not operating. This metric compares measured versus expected energy unavailability. This concepts reports the difference which is calculated as Measured – Expected. + + + xml:lang="en">Module Operating Temperature Maximum Temperature + xml:lang="en">Regulatory withdrawal amount as noted in the Limited Liability Company Agreement. + xml:lang="en">Identifier for Tax Opinion. + xml:lang="en">Document Identifier, Interconnection Approval + xml:lang="en">Sub Reason For Maintenance, Description + + xml:lang="en">Surety Electronic Bond, Validation Web Site + xml:lang="en">Design review of the Geotech report to ensure compatibility with IFC (Industrial Foundation Classes) Drawings. + xml:lang="en">kWh output guaranteed by the developer for the portfolio. + xml:lang="en">Amount of counterparty tax obligations in the Power Purchase Agreement. + xml:lang="en">Advisor Invoices Exceptions, Description + + xml:lang="en">Total AC Capacity of the system based on the design of the system and the manufacturer's expected capacity (calculated as DC X (1-derate factor)). + xml:lang="en">Monthly Period [Axis] + xml:lang="en">Link to the Advisor Invoices document. + xml:lang="en">Developer Past Funds, Description + xml:lang="en">Measured Capacity At Target Conditions + xml:lang="en">Interconnection Approval Exceptions, Description + xml:lang="en">Identifier for the approval condition for an individual financing event. + xml:lang="en">Reserve for a project. + xml:lang="en">Expiration date of the backup asset management agreement. + xml:lang="en">Rent Coverage Ratio, Percent + xml:lang="en">Independent Engineering Opinion Report [Abstract] + xml:lang="en">Master Lessee Security Agreement Exceptions, Description + xml:lang="en">Name of the individual responsible for the information reported on the checklist. + xml:lang="en">Description of the type of Master Services Agreement which can be a stand-alone agreement, or can include the Operations and Maintenance Contract or can include the Asset Management Agreement or can include both the Operations and Maintenance and Asset Management Agreement. + xml:lang="en">Partnership Flip, P50 Flip Period + xml:lang="en">Property Insurance Pollution Requirement, Description + + xml:lang="en">System Minimum Irradiance Theshold, Amount + xml:lang="en">Tax Equity Cash Distributions, Amount Per Watt + xml:lang="en">Financial Lease Schedule, Effective Date + xml:lang="en">Washing And Waste Agreement [Line Items] + xml:lang="en">Developer Construction and Development Experience, Description + xml:lang="en">Expiration date of the Asset Management Contract. + + xml:lang="en">Post Funding Activity Closing Punch List [Member] + xml:lang="en">Indicates if the property insurance certificate is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">System Entity [Table] + xml:lang="en">Description of type of incentive. + xml:lang="en">Preparer Of Power Purchase Agreement, Name + xml:lang="en">Predicted active electrical production at the revenue meter for each year, based on historical weather data that is representative for the site, per IEC 61724-3. Calculated as Total Predicted Energy reflecting times of unavailability and parasitic loss. This element is defined as the sum of electrical production over a period of time, for example from the 1st day to the last day of the month, and has a period type of duration. This should not be used with the Period [Axis]. + xml:lang="en">Energy Contract Hourly Rate, Hour 6 [Member] + xml:lang="en">Site review of Site plan including access, transmission and substation(s). + xml:lang="en">Depreciation of property, plant and equipment directly related to services rendered by an entity during the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Description of the methodology for the appraisal, for example, average, lower of, or higher of. + xml:lang="en">Identifier used to link a subset of attributes within a fund, for example grouping the characteristics of a portion of a fund owned by a particular entity. + xml:lang="en">Information about the the engineering procurement and construction related to the system. + xml:lang="en">Date preventative maintenance started. - - + xml:lang="en">Natural Resource Study [Line Items] + xml:lang="en">Availability Of Final Supplemental Report Review Of Insurance Review, Flag + xml:lang="en">Equity Contribution Agreement, Effective Date + xml:lang="en">Advisor Invoices, Expiration Date + xml:lang="en">Document Identifier, Site Lease Memo + xml:lang="en">Second line of the address of the site. - - - + xml:lang="en">Counterparties To The Construction Contractor Notice Of Certification, Names + xml:lang="en">Description of rate type for Power Purchase Agreement, e.g. $/kWh. + xml:lang="en">Operations and Maintenance Contract, Subcontractor Scope of Work, Description + xml:lang="en">Membership Interest Purchase Agreement, Effective Date + xml:lang="en">Operations Manager Identifier + xml:lang="en">Description of any exceptions to the Construction Monitoring Report. + xml:lang="en">Counterparties To The Invoice Including Wiring Instructions, Names + xml:lang="en">This section is used to define the relationship between the System and its entities. It is also used to relate an entity to multiple systems. + xml:lang="en">Description of any exceptions to the LLC Formation Documents or issues raised. + xml:lang="en">Counterparties To The Membership Certificate Of Master Lessee, Names + xml:lang="en">Multiple Listee Letter Signed By NRTL, Flag + xml:lang="en">Inverter, Is MPPT, Flag + + xml:lang="en">Names of counterparties to the Qualifying Facilities Self Certification. + xml:lang="en">Module Performance Warranty, End Date + xml:lang="en">IECRE Model And Design [Abstract] + xml:lang="en">Engineering, Procurement And Construction Agreement, Contract Type, Description + xml:lang="en">Estoppel Certificate Power Purchase Agreement [Abstract] + xml:lang="en">Description of the operational center managed by the asset manager. + xml:lang="en">Indicates if the UCC Security Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Equipment Warranties [Abstract] + + xml:lang="en">Engineering, Procurement and Construction Performance Guarantee, Percent + xml:lang="en">Information about the monitoring contract. + xml:lang="en">Information about the Operator Guarantee for the project. - + xml:lang="en">Description of most important weakness of the fund. + xml:lang="en">Indicates if the entity or counterparty is a Holding Company; if it is, TRUE; if it is not, FALSE. + xml:lang="en">Site Inspections Small DG Photographic Inspection [Member] + xml:lang="en">Inverter Ground Fault Detector Interrupter Threshold, Amount + xml:lang="en">Energy production estimate of independent engineer including Inter-Annual Variability and P50, P75, P90, P99 for 1 and 10 years in kWh. + xml:lang="en">Lessee Claim Documents Exceptions, Description + + xml:lang="en">Monthly Period [Domain] + xml:lang="en">Actual Power Purchase Agreement Revenue divided by expected Power Purchase Agreement revenue per month. + + xml:lang="en">System Entity [Abstract] + xml:lang="en">Indicates if there are exceptions to the Notice and Payment Instructions. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Availability Of Exceptions To The Breakage Fee Agreement, Flag + xml:lang="en">Link to the Commitment Agreement document. + xml:lang="en">Power Purchase Agreement, Location to Receive Notices, Address + xml:lang="en">Identifier for Equity Contribution Guarantee. + xml:lang="en">Represents 11:00 in 24 hour military time, 11:00 am. on the am/pm 12 hour clock. + + xml:lang="en">Counterparties To The Interconnection Approval, Names + xml:lang="en">Name of the company responsible for preparing the Renewable Energy Credit Offtaker Agreement. + xml:lang="en">Name of the company responsible for preparing the Transmission Report and Curtailment Estimate. + xml:lang="en">IECRE Inspection Body + xml:lang="en">Information about natural resources such as water or minerals located or within proximity of a site that may have an impact on the system. + + xml:lang="en">Notice Of Commercial Operations Date, Effective Date + xml:lang="en">Term Loan, Effective Date + xml:lang="en">Percent uptime of the project during normal operating conditions from inception to date, actual, availability defined per IECRE 61724-3 or through another standard method. + xml:lang="en">Information about the array installation type. + xml:lang="en">Natural Resource Permit [Table] + xml:lang="en">Insurance Requirement, Description + xml:lang="en">Date of a major event that happened during the period related to the operations of the project. + xml:lang="en">Energy, Contract Rate Details [Line Items] + xml:lang="en">Percent loss reported value. + + + xml:lang="en">Name of the company responsible for preparing the Certificate Of Completion. + xml:lang="en">Availability Of Equity Contribution Agreement, Flag + xml:lang="en">Counterparties To The LCC Registration, Names + xml:lang="en">Preparer Of Lease Contract For Project, Name + xml:lang="en">Indicates if the Investment Memo is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Tracker [Member] + xml:lang="en">Module, Width + xml:lang="en">Counterparties To The Environmental Impact Report, Names + xml:lang="en">Source of Funds SPV or Counterparty + + + xml:lang="en">Site Lease Details, Description + xml:lang="en">Environmental Impact Report [Line Items] - - + xml:lang="en">Used to group information about different types of insurance related to the project or the system. + xml:lang="en">Insurance Carrier, Email + xml:lang="en">Permits and assessments review of DG risk assessment of secondary studies or system upgrades due to PV penetration in area. + xml:lang="en">Information about the Master Purchase Agreement between developer and investor to purchase the project from the developer. + xml:lang="en">Punch List, Description + xml:lang="en">Project Class Type + + xml:lang="en">Maximum value of the voltage range of the inverter, per manufacturer specification. + xml:lang="en">Initiation date of the Renewable Energy Credit Contract which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">Power Purchase Agreement, Notices Contact, Name + xml:lang="en">Additional comments needed to explain the targeted conditions for the capacity measurement using IEC 61724-2. + xml:lang="en">Module Factory Audits Pre Shipment Inspection Report [Member] + xml:lang="en">Model Parasitic Load, Amount + xml:lang="en">Availability Of Exceptions To The Operations Manual, Flag + xml:lang="en">Date the Environmental Site Assessment report was issued. + xml:lang="en">PV Installation Interconnection Fees Cost, Amount + xml:lang="en">Guaranteed Obligation, Description + xml:lang="en">Lessee Claim Documents [Abstract] + + xml:lang="en">Preparer Of Workers Compensation Insurance Policy Insurance Policy, Name + xml:lang="en">Inverter continuous power rating at 40 degrees celsius. + xml:lang="en">Bank, Name + xml:lang="en">Temperature of the IGBT (insulated gate bipolar transistors of the inverter). Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Identifier for Notice Of Commercial Operation. + xml:lang="en">Environmental Site Assessment II, Expiration Date + xml:lang="en">Credit Support Receiver, Name + xml:lang="en">Counterparties To The Certificate Of Completion, Names + xml:lang="en">Availability Of Final Property Insurance Certificate, Flag + xml:lang="en">Description of the geospatial boundaries of the site. + + xml:lang="en">Performance Based Incentive (PBI) Revenue + xml:lang="en">Name of project company lessee. + xml:lang="en">Date when the maintenance ticket was closed. + xml:lang="en">Names of counterparties to the Term Sheet. + xml:lang="en">Accounts Receivable Aging Current Balance [Member] + xml:lang="en">Module Cell Column Count, Number + xml:lang="en">Effective date of the Construction Contractor Notice of Certification. + xml:lang="en">Name of the governing authority that issued the permit. + + + xml:lang="en">Indicates if there is security interest in the Power Purchase Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Represents information about the installation type of the array with can be Rooftop or Ground. + xml:lang="en">Closing Documents [Line Items] + xml:lang="en">Comments or notes about the product that may be found on a cut sheet. For example, ABC product also sold under the name XYZ product, or Model has been discontinued, or Part of family of several other models. + + xml:lang="en">Project Interconnection Type + xml:lang="en">Manufacture date of the device. + xml:lang="en">Case identifier for the operations and maintenance provider. + xml:lang="en">Limited Liability Company Agreement, Cash Distributions, Amount + xml:lang="en">Information about the entity. + xml:lang="en">Level of severity of the maintenance event, which can be Low, Moderate, or High. + xml:lang="en">Certificate Of Formation For Master Lessee, Lessee And Operator, Effective Date + xml:lang="en">Total number of battery management systems in the plant (system). + + xml:lang="en">Beneficiary of Insurance. + xml:lang="en">Represents information about systems located on a site such as size and structure. + xml:lang="en">Counterparties To The Site Lease Assignment, Names + xml:lang="en">Basic rent which is the amount of rent payable on a specified date, e.g., the amount that must be paid to lessor by lessee. + xml:lang="en">Used to identify different types of installations. + xml:lang="en">Regulatory Facility Type + xml:lang="en">Shading Model Factor, Typical Met Month, Percent + xml:lang="en">Effective date of the Assignment and Assumption Agreement. + xml:lang="en">Name of the lessor of the site per the Site Lease Agreement. + xml:lang="en">Percent uptime of the project during normal operating conditions from inception to date, expected, availability defined per IECRE 61724-3 or through another standard method. + + xml:lang="en">Financial Performance Estimates [Abstract] + xml:lang="en">Module Level Power Electronics Has String Length, Flag + xml:lang="en">Name of the backup Operations and Maintenance subcontractor company. + xml:lang="en">Name of the renewable energy inspection body completing the annual test. + xml:lang="en">Met Station, Number of Stations + xml:lang="en">Closing Documents, Description + xml:lang="en">Employee, Title + xml:lang="en">Measured Insolation To P50 Insolation, Percent + xml:lang="en">Description of any exceptions to the Site Lease Memo or issues raised. - + xml:lang="en">Information about guarantees which are not otherwise defined within the taxonomy related to a specific contract. - - + xml:lang="en">Site Collection Substation Availability, Flag + xml:lang="en">Operational Event, Estimated Energy Lost + xml:lang="en">Insurance Consultant Report Exceptions, Description + xml:lang="en">Expiration date of the Site Lease Memo. + + xml:lang="en">Inverter, Weight + xml:lang="en">Amount of the buy-out at the end of the lease. + xml:lang="en">Surety Bond, Contract Date + xml:lang="en">Information about the UCC Security Agreement for the project. + xml:lang="en">Identifier for LLCA Agreement. + xml:lang="en">Used as an identifier for an operational event that is reported. + xml:lang="en">Casualty Insurance [Abstract] + + xml:lang="en">Counterparties To The Term Sheet, Names + xml:lang="en">Description of any exceptions to the Master Purchase Agreement. + xml:lang="en">Description of the asset manager workflow process and ticketing system. + xml:lang="en">Optimizer Maximum Power Point Tracking minimum operating voltage range. + xml:lang="en">Description of the surety bond contract. + xml:lang="en">Represents the total outstanding balance for customer accounts that are past due between 61 and 90 days. + xml:lang="en">Information about the backup asset management. + xml:lang="en">Pricing Model, Pretax Cash Return Expense, Amount + xml:lang="en">Expiration date of the Site Lease Agreement. + xml:lang="en">Design Review Of Architectural Report [Member] + xml:lang="en">Developer, Federal Tax Identification Number + xml:lang="en">Zoning Permit Termination Provision, Description + xml:lang="en">Indicates if there is a cross default pool for the Term Loan Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Use of Funds, Entity Type + xml:lang="en">Effective date of the funding proposal request. + xml:lang="en">Maintenance cost of Data Acquisition System with no warranty. + xml:lang="en">Indicates if there are exceptions to the Exposure Report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Zoning Permit, Upfront Fee Timing, Description + xml:lang="en">Date of the financial transaction related to the system. - + xml:lang="en">Master Lessee Security Agreement, Link + xml:lang="en">Indicates if high wind conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Availability Of Final Term Loan, Flag + + + xml:lang="en">Parallel Monitoring Contract, Expiration Date + xml:lang="en">Name of the company responsible for preparing the Installation Agreement. + xml:lang="en">Power Purchase Agreement, Renewable Energy Credits Bundled With Electricity, Amount + xml:lang="en">Price rate in currency per kWdc per year for the Asset Management Contract. + xml:lang="en">Azimuth measure of the tracker. + xml:lang="en">Expiration date of the Co Tenancy Agreement. + xml:lang="en">Note describing how the distributed funds will be used. + xml:lang="en">Identifier for Financial Lease Schedule. + xml:lang="en">Information about the performance of the operations manager by state. + xml:lang="en">Local Incentive Contract, Jurisdiction + xml:lang="en">Notice Of Approval, Link + xml:lang="en">Technician Salary and Benefits Expense, Amount + xml:lang="en">Entity City + xml:lang="en">Indicates if the O&M contract review has been considered. If it has been considered, TRUE; if it has not been considered, FALSE. + xml:lang="en">Name of the company responsible for preparing the Renewable Energy Credit Buyer Acknowledgement. + xml:lang="en">Other Permits, Issue Date + xml:lang="en">Indicates if the project must file a MBR (market based rate) application under FERC 205. If the project must file an application, TRUE; if not, FALSE. + xml:lang="en">Energy Production Insurance [Table] + xml:lang="en">Power Purchase Agreement, Counterparty Reporting Requirements, Description + + xml:lang="en">Preparer Of Environmental Impact Report, Name + xml:lang="en">Description of project permits required before the project can begin on a single solar installation. + xml:lang="en">Indicates if the Financial Lease Schedule is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">SCADA Systems, License Expiration Date + xml:lang="en">Power Purchase Agreement, Financial Assurances, Description + xml:lang="en">Summary information included in the monthly operating report. + xml:lang="en">Financial Transaction For System [Table] + xml:lang="en">Indicates if there are exceptions to the Supplemental Report Review Of Insurance Review or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Performance Based Incentive Term, Initiation Date + xml:lang="en">Host Electricity Use Profile defined as system size as percent of customer load. + xml:lang="en">Description of any exceptions to the Incumbency Certificate or issues raised. + xml:lang="en">Represents 04:00 in 24 hour military time, 4:00 am. on the am/pm 12 hour clock. - - + xml:lang="en">Confirmation of the availability of the contract documents, per the Engineering Procurement and Construction Agreement. If available, TRUE; if not available, FALSE. + + xml:lang="en">Name of fund investor holding company. + + xml:lang="en">Master Services Agreement, Link + xml:lang="en">Date which sale leaseback or group of sale leasebacks is set to expire, in CCYY-MM-DD format. + xml:lang="en">Estoppel Certificate Power Purchase Agreement Exceptions, Description + xml:lang="en">Auditing Fee Per Watt + xml:lang="en">Inverter Input, Maximum Power DC, Amount + xml:lang="en">Utility Legal Entity Identifier + xml:lang="en">Used to group information about liability insurance related to the project or the system. + xml:lang="en">Effective date of the Operator Guarantee. + xml:lang="en">Availability Of Easement Report, Flag + xml:lang="en">Description of SCADA (control system) test results per the Continuity of Operations Agreement. + + xml:lang="en">Title Survey, Expiration Date - - - + xml:lang="en">Transmission Report and Curtailment Estimate, Effective Date + xml:lang="en">Energy Budget Source, Description + xml:lang="en">Information about the Tax Opinion for the project. + xml:lang="en">System Spare Parts Level, Status + xml:lang="en">Maintenance cost amount for equipment that has no warranty. + xml:lang="en">Link to the Shared Facility Agreement document. + xml:lang="en">Insurance [Abstract] + xml:lang="en">AC voltage of the line to neutral revenue meter. + xml:lang="en">Revenue Meter Dimensions, Height + xml:lang="en">Membership Certificate Of Master Lessee Exceptions, Description + xml:lang="en">Letter of Credit, Security, Beneficiary + + xml:lang="en">Name of the local jurisdiction providing the incentive which could be state, city, or county. + xml:lang="en">Module Temperature Coefficient Operating Voltage + xml:lang="en">Period Month July [Member] + xml:lang="en">Annual Escalator for Lease Payment, Percent + xml:lang="en">Counterparties To The Equity Contribution Guarantee, Names - - + xml:lang="en">Link to the approval memo. + xml:lang="en">Actual renewable energy credit revenue divided by expected renewable energy credit revenue. + xml:lang="en">Financial Lease Schedule Exceptions, Description + xml:lang="en">Equity Contribution Guarantee [Abstract] + xml:lang="en">Indicates if the Operations Manual is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Guaranteed kWh output (developer as sponsor) per the Operator Performance Guarantee. + xml:lang="en">Used to collect information about supply agreements for equipment used in the system. + xml:lang="en">Availability Of Liability Insurance Certificate, Flag + xml:lang="en">Document Identifier, Construction Loan Document + xml:lang="en">Document Identifier, Workers Compensation Insurance Policy Insurance Policy + xml:lang="en">Percentage of P50 energy variation expected year to year over a single standard variation based on the historical variability of weather observed. + + xml:lang="en">Model number of Pyranometer to measure solar radiation flux density. + xml:lang="en">Cultural Resource Permit [Axis] + xml:lang="en">Actual cost of penalties and low performance during period of the test in currency/W. + xml:lang="en">Preparer Of Surety Bond Policy Insurance Policy, Name + xml:lang="en">Link to the LCC Registration document. + xml:lang="en">Fund Composition And Financing Structure [Abstract] + xml:lang="en">Title of the issue. + xml:lang="en">Operating Agreements For Master Lessee, Lessee And Operator, Link + xml:lang="en">Description of the developer performance guarantee type for the portfolio. + xml:lang="en">Description of the operating plan. + xml:lang="en">Inverter UL1741 Supplement A Certification, Date + xml:lang="en">Used as the identifier for the OffTaker. + xml:lang="en">URI to the location of the Cut Sheet (Data Sheet) published by the manufacturer. + xml:lang="en">Closing Certificate [Abstract] + xml:lang="en">Availability Of Supply Agreements, Flag + xml:lang="en">Availability Of Exceptions To The Site License Agreement, Flag + xml:lang="en">State Incentives and Credits Filings, Description + xml:lang="en">Easement Report [Abstract] + xml:lang="en">Financial Transaction For Fund [Axis] + xml:lang="en">Availability Of Building Inspection, Flag + xml:lang="en">Name of the company responsible for preparing the Module Factory Audit Report. + xml:lang="en">Preparer Of Assignment Of Interest, Name + xml:lang="en">Reserve Fund Accumulation On Schedule, Flag + xml:lang="en">Information about the Data Acquisition System. + xml:lang="en">Description of any exceptions to the Security Agreement Supplement or issues raised. + + xml:lang="en">Indicates if there are exceptions to the property insurance certificate. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Expected Energy Availability Estimate is modelled predicted energy for unity availability, and can be calculated by dividing ExpectedEnergyAtTheRevenueMeter by Predicted_Energy_Availability. This element can be used with the PeriodAxis to indicate the period such as year and has a period type of instant to measure a point in time. + xml:lang="en">Last Residual Value Review, Date + + + + xml:lang="en">Letter of Credit, Security, Expiration Date + xml:lang="en">Wiring Instructions, Effective Date + xml:lang="en">Description of reporting obligations in the Parent guarantee, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. + xml:lang="en">PV Installation Municipal Inspections Cost, Amount + xml:lang="en">Module Factory Audit Report, Effective Date + xml:lang="en">Analyst, Name + xml:lang="en">Developer Governance Decision Authority, Description + xml:lang="en">Used to group a listing of information about the System on a site. + xml:lang="en">Size of the entity in megawatts AC. + + xml:lang="en">Engineering, Procurement And Construction Contract, Description + xml:lang="en">Used to show information about the cash distribution payments made from the project to investors. + xml:lang="en">Supplemental Report Review Of Insurance Review, Link + xml:lang="en">Description of the test condition. + xml:lang="en">REC Revenue Per Watt + xml:lang="en">Date of execution of the sale leaseback contract. May be the same as the commencement date of the sale leaseback. + + xml:lang="en">Amount of credit support during the period. + xml:lang="en">Equipment Review PV Modules [Member] + xml:lang="en">IECRE Testing Dates [Abstract] + xml:lang="en">Power Purchase Agreement Performance Guarantee Expiration Date + xml:lang="en">Module Built In DC Optimizer Availability, Flag + xml:lang="en">Power Purchase Agreement, Firm Volume, Amount + xml:lang="en">Earnings before income tax, depreciation and amortization, estimate made at start of project. + xml:lang="en">Term of the Operations and Maintenance contract. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Description of structure and history of the Operations and Maintenance contract. + + xml:lang="en">Used as the identifier for the Periodic Budget. + xml:lang="en">Document Identifier, Bill Of Sale + xml:lang="en">Expected Net Investment Balance, Amount + xml:lang="en">Names of counterparties to the LLC Formation Documents. + xml:lang="en">Electrical Inspection, Link + xml:lang="en">Product Identifier [Table] + xml:lang="en">Renewable Energy Credit Contract Firm Volume, Power + xml:lang="en">Computed average energy production for the period defined on the PeriodAxis over all years of operation since activation date in kWh. To record the average energy for Q1 for example this element would be used with the PeriodFirstQuarterMember on the Period Axis. If the period axis is not used this represents the energy over all years of operation since Activation Date (in kWh). + xml:lang="en">Site Property Location Of Spare Parts Inventory, Description + xml:lang="en">Information about system (plant) dates needed for the IECRE certificate. + xml:lang="en">Indicates if the Master Lessee Security Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Availability Of Commitment Agreement, Flag + xml:lang="en">Indicates if there are exceptions to the Operations and Maintenance Manual or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Description of the developer plan for tax equity reporting and communication including a short description of how the sponsor will interface with the tax equity recipient on consent requests, operating issues, tax return filing, tracking models, operating reports and other issues. + xml:lang="en">Module Factory Audit Report, Link + xml:lang="en">Installation Labor Costs excluding manufactuer costs with a labor component. + xml:lang="en">Document Identifier, Building Inspection + xml:lang="en">Estimated Measures [Abstract] + xml:lang="en">Used to identify different types of installations. + xml:lang="en">Night Tare Loss Data in Weighted Efficiency Form, Flag + xml:lang="en">Transformer, Design Factor + xml:lang="en">This is the sum of principal amount outstanding for both securitized and unsecuritized loans of all types. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + + xml:lang="en">Site Review Of Hazardous Waste [Member] + xml:lang="en">Assumed Irradiation Model, Amount + xml:lang="en">Estimated system removal costs in the event the project is removed, for example, due to permitting or lease agreement. + xml:lang="en">Indicates if the Advisor Invoices is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Availability Of Final UCC Precautionary Lease Filing, Flag + xml:lang="en">Guaranteed output of the solar installation in kWh. + xml:lang="en">Description of type of project working capital account collateral which could be cash or letter of credit. + xml:lang="en">Form of Current Reserve + xml:lang="en">Equipment Review Meteorological Station [Member] + xml:lang="en">Letter Of Credit, Account Number - + xml:lang="en">Division Of State Architect Approval [Abstract] + xml:lang="en">Availability Of Assignment And Assumption Agreement, Flag + xml:lang="en">Master Services Agreement, Fees, Amount + xml:lang="en">Preparer Of Energy Production Insurance Policy, Name + xml:lang="en">Indicates if there are exceptions to the Closing Indemnity Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Confirmation of deficit restoration obligation obligation which is the partners unconditional obligation within the partner agreement to restore any deficit balance in their capital account when the partnership liquidates. If available, TRUE; if not available, FALSE. + xml:lang="en">Effective date of the Continuity of Operations Agreement. + xml:lang="en">Identifier for Environmental Assessment II. + xml:lang="en">Preparer Of Tax Indemnity Agreement, Name + + xml:lang="en">Actual renewable energy credit revenue divided by expected renewable energy credit from inception to date. + xml:lang="en">Information about the Interconnection Approval for the project. + xml:lang="en">Document Identifier, Host Acknowledgement - + xml:lang="en">Availability Of Final Site Lease Access Agreement, Flag + xml:lang="en">Indicates if the Hedge Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Phone number of the entity. - - + xml:lang="en">Name of the company responsible for preparing the Master Lease Agreement. + xml:lang="en">The height of the installation from ground-level. + xml:lang="en">System Preventive Maintenance Tasks, Status + xml:lang="en">Cost Based Incentive Amount + xml:lang="en">Identifier for Engineering Procurement and Construction Agreement. + + xml:lang="en">Information about the notice of approval. + + xml:lang="en">Membership Interest Purchase Agreement, Expiration Date + xml:lang="en">Expiration date of the Renewable Energy Credit Contract which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">NonUnity Power Model Factor, Typical Met Month, Percent + xml:lang="en">Identifier for Site Control Contract. - - + xml:lang="en">Independent Engineering Production Estimate Report Exceptions, Description + xml:lang="en">Accounts Receivable Aging [Line Items] + xml:lang="en">Name of the company responsible for preparing the Vegetation Management Agreement. + xml:lang="en">Limited Liability Company Agreement, Pricing Parameters, Description + xml:lang="en">Equipment Onboarding [Line Items] + xml:lang="en">Counterparties To The Property Insurance Certificate, Names + xml:lang="en">Identifier for Notice Of Commercial Operations Date. + xml:lang="en">Initiation date of parallel monitoring contract per the Continuity of Operations Agreement which is the plan for the installation going forward including contingencies which may be triggered by financial performance. + xml:lang="en">Information about the Design and Construction Documents for the project. + xml:lang="en">Name of the company responsible for preparing the Energy Production Insurance Policy. + xml:lang="en">Developer Staffing and Subcontractor, Description + xml:lang="en">Combiner Box Temperature, Minimum + xml:lang="en">Module Has Certification IEC61215, Flag + xml:lang="en">Description of special features described in the Engineering Procurement and Construction Agreement. + xml:lang="en">IECRE Certifying Body + xml:lang="en">Description of any exceptions to the Certificate of Acceptance Report. + xml:lang="en">Effective date of the Construction Loan Agreement. + + xml:lang="en">Expiration date of the Master Lessee Security Agreement. + xml:lang="en">Indemnified, Amount + + xml:lang="en">Amount of the proforma net income balance. + xml:lang="en">Revenue Sources, Description + xml:lang="en">Completion of Punch List Review to confirm no material risk to project operation or pro forma. + xml:lang="en">Availability Of Notice and Payment Instructions, Flag + xml:lang="en">Entity Is COP Backup Provider, Flag + xml:lang="en">Name of the company responsible for preparing the Mechanical Completion Certificate. + xml:lang="en">Length of the Inverter. + xml:lang="en">Component Maintenance Actions [Line Items] + xml:lang="en">A PV system or part of a system is considered to be unavailable when it’s status is observed to be non-functional.This measure reports the amount of energy that is unavailable. + xml:lang="en">Availability Of Construction Contractor Notice Of Certification, Flag + xml:lang="en">Availability of Independent Engineering Production Estimate Report, Flag + xml:lang="en">Permits and assessments review of Environmental permit. - + xml:lang="en">Generally recurring costs associated with normal operations except for the portion of these expenses which can be clearly related to production and included in cost of sales or services. Includes selling, general and administrative expense. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. - + xml:lang="en">Name of the company responsible for preparing the Operator Performance Sponsor Guarantee Contract. + xml:lang="en">Counterparty to the Power Purchase Agreement. + xml:lang="en">Represents information about zoning covenants for a site. + + xml:lang="en">Reconciliation period during which the system availability must be met. - + xml:lang="en">Operational Status Of The System, Flag - + xml:lang="en">Unlevered internal rate of return. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Reserve Used, Flag + xml:lang="en">Membership Certificate Of Lessee, Link + xml:lang="en">Expiration date of the Electrical Inspection. + xml:lang="en">Financing Event, First Financing Entity, Name - + xml:lang="en">Actual (measured) amount of energy lost due to inverter issues. + xml:lang="en">Preparer Of Letter Of Credit Agreement, Name - - + xml:lang="en">Name of SCADA (Supervisory Control & Data Acquisition) systems manufacturer. + xml:lang="en">Name of the trustee. + xml:lang="en">Bill Of Sale, Link + xml:lang="en">Module Is BIPV, Flag + xml:lang="en">Description of obligations related to the roof. + xml:lang="en">Information about Credit Support, which is when a sponsor or parent company agrees to cover a default of a lease payment or some other loss to the bank. + xml:lang="en">Account number of the recipient of the wired funds. + xml:lang="en">Assignment Of Interest [Abstract] + xml:lang="en">Expected Energy At The Revenue Meter For Period + xml:lang="en">Preparer Of Component Status Report, Name + xml:lang="en">Counterparties To The Letter Of Credit, Names + xml:lang="en">Name of the company responsible for preparing the Security Agreement Supplement. + xml:lang="en">Collateral Account Balance, Amount + xml:lang="en">Notice Of Approval, Expiration Date + xml:lang="en">Minimum operating temperature of the revenue meter. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Master Services Agreement, Termination Date + xml:lang="en">Environmental Site Assessment II, Link + + xml:lang="en">Advisor Invoices, Effective Date + + xml:lang="en">Effective date of the Exposure Report. - + xml:lang="en">Wiring Instructions [Abstract] + xml:lang="en">Financing Event, Type + xml:lang="en">Zoning Permit Type, Description + xml:lang="en">Indicates if the Security Agreement Supplement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Incumbency Certificate [Abstract] + xml:lang="en">Indicates if the Bill of Sale for the installation is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">One-year in-plane measured irradiation, Hi, as described in IEC 61724-1 Ed. 2, in kWh/m2. + xml:lang="en">Project Stage + - + xml:lang="en">Availability Of Final Investment Memo, Flag + xml:lang="en">Effective date of the Project Administration Agreement. - + xml:lang="en">Availability Of Certificates Of Insurance, Flag - - + xml:lang="en">Availability Of Final Lessee Security Agreement, Flag + xml:lang="en">Electrical Energy Test, Start Date + xml:lang="en">Preparer Of Construction Issues Report, Name + xml:lang="en">The amount of an allowance account used to record impairments to financial assets due to credit losses. + + xml:lang="en">Workers Compensation Insurance [Abstract] + + xml:lang="en">System Installer Company, Name + xml:lang="en">Lease Rent Payments (Net of Collateral Account), Estimate + xml:lang="en">Design And Construction Documents Exceptions, Description + xml:lang="en">Indicates if the Independent Engineering Production Estimate Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Effective date of the Closing Certificate, which documents that the project has been funded and includes supporting information about the lease.. + + xml:lang="en">Passing of Performance Tests (recommended to be at least 5 days for DG, 15 days for utility scale at sufficient solar irradiance), e.g. Energy Yield Tests, Performance Ratio Tests or Capacity Test. + xml:lang="en">Availability Of Exceptions To The Funding Memo, Flag - + xml:lang="en">Indicates if the Notice of Commercial Operations Date is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Identifier for Construction Issues Report. + xml:lang="en">Used to group a listing of information about reportable environmental conditions. + + xml:lang="en">Monthly Operating Report Level + xml:lang="en">Debt Instrument Periodic Payment, Principal Per Watt + + xml:lang="en">Actual percent uptime of the project during normal operating conditions for a specified month, availability defined per IECRE 61724-3 or through another standard method. + xml:lang="en">Items on the Independent Engineering Services Checklist regarding site inspections. - + xml:lang="en">Assignment And Assumption Agreement Exceptions, Description + xml:lang="en">Information about the Operations and Maintenance contractor performance guarantee. + xml:lang="en">Punch List, Effective Date + xml:lang="en">Effective date of the Renewable Energy Credit Buyer Acknowledgement. + + xml:lang="en">Energy Budget [Abstract] + + xml:lang="en">Retail Days Delinquent, Number + xml:lang="en">Partnership Flip Yield, Percent + xml:lang="en">Third Party Engagement Fee, Amount + xml:lang="en">Expiration date of the Local Incentive Contract. + xml:lang="en">Tracker Materials & Workmanship Warranty, Initiation Date + xml:lang="en">Power Purchase Agreement is greater than or equal to the lease term in a sale leaseback. If the term greater, TRUE; if not, FALSE. + xml:lang="en">Preparer Of Security Contract, Name + xml:lang="en">Effective date of the Membership Certificate of Lessee. + xml:lang="en">Insurance Carrier + xml:lang="en">Periodic Budget, System Availability, Percent + xml:lang="en">Net Income After Tax per the pricing model. + + + xml:lang="en">Description of the Power Purchase Agreement. + xml:lang="en">Module Design Factor + xml:lang="en">Indication if external curtailment is considered in the design model. If it is considered in the design model, TRUE; if it is not considered in the design model, FALSE. + + - - + xml:lang="en">Renewable Energy Credit, Actual To Expected Revenue, Inception To Date, Percent + xml:lang="en">Limited Liability Company Agreement, Purchase Option, Description + xml:lang="en">Identifier for Substantial Completion Certificate. + xml:lang="en">Accounts Receivable Aging Balance Past Due 91 To 120 Days [Member] + xml:lang="en">Lien Waiver Exceptions, Description + xml:lang="en">Accounts Receivable Aging Balance Past Due 31 To 60 Days [Member] + xml:lang="en">Budgeted annual amount of the Master Service Agreement paid to asset manager from Project Company. - + xml:lang="en">Pricing File [Abstract] + xml:lang="en">Represents information about an individual who is employed on the system including name, title, and team on which the individual works. - + xml:lang="en">Tax Opinion Exceptions, Description + xml:lang="en">Identifier for Operator Guarantee. + xml:lang="en">Backup Operations and Maintenance Monthly Fee, Amount + + xml:lang="en">Effective date of the Master Lessee Security Agreement. + xml:lang="en">Master Purchase Agreement, Conditions Precedent to Execution, Description + xml:lang="en">ISO country code where the project is located. + xml:lang="en">Bank Account [Abstract] - + xml:lang="en">Custom Test Condition [Abstract] + xml:lang="en">Indication if the MCOP (Maximum Continuous Output Power) measured data provided for at least 180 minutes at minimum intervals of 5 minutes. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Expected amount of renewable energy credit from inception to date. + xml:lang="en">Continuity of Operations Agreement, Backup Asset Management Fee Prior to Activation, Amount + xml:lang="en">Counterparties To The Approval Notice, Names + xml:lang="en">Membership Certificate Of Master Lessee, Expiration Date + xml:lang="en">Partnership Flip, P75 Flip Date + xml:lang="en">Fund Wind Assets, Flag + xml:lang="en">Represents maintenance actions taken on components related to the system. + xml:lang="en">Name of the company responsible for preparing the Estoppel Certificate Power Purchase Agreement. + xml:lang="en">Contract Review Engineering Procurement and Construction [Member] + xml:lang="en">Date when the electrical system is complete including capability to connect to the grid, but it is not yet fully tested and not necessarily connected to grid. + xml:lang="en">Document Identifier, Developer Project Performance Guarantee Agreement + xml:lang="en">Information about operational issues that require resolution. + xml:lang="en">Name of the company responsible for preparing the Pricing File. - + xml:lang="en">Information about permits required for an installation. + xml:lang="en">Continuity of Operations Agreement, Parallel Monitoring, Contract Term - + xml:lang="en">Identifier for Lease Schedule + xml:lang="en">Information about the costs of the photovoltaic system. + xml:lang="en">Inverter is at 20% power level. - - - + xml:lang="en">Indicates whether Power Purchase Agreement rate is based on time of delivery, a time specified during the day. If PPA is based on time of delivery, TRUE; if PPA is not based on time of delivery, FALSE. + xml:lang="en">Membership Certificate Of Master Lessee, Effective Date + xml:lang="en">Description of the asset manager insurance policy management. + xml:lang="en">Indicates if the cut sheet is revised. If it is new, TRUE; if is not new, FALSE. + xml:lang="en">Period Annual [Member] + xml:lang="en">Lease Payments Prepaid, Amount + xml:lang="en">Site Environmental Condition Dust, Flag + xml:lang="en">Description of the natural resource identified. + xml:lang="en">Operator Guarantee, Link + xml:lang="en">Expiration date of the Environmental Impact Report. + xml:lang="en">Description of any exceptions to the Certificate of Final Completion. + xml:lang="en">Document Identifier, Certificate Of Acceptance Report + xml:lang="en">Energy Budget, Date + xml:lang="en">Description of any exceptions to the Tax Indemnity Agreement. + xml:lang="en">Energy Reference Yield, Amount + xml:lang="en">Information about charges relevant to IECRE. + xml:lang="en">Indicates if there are exceptions to the Notice of Commercial Operations Date or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - - + xml:lang="en">Name of the offtaker. + xml:lang="en">An entity code is a 2 to 6 character string comprised of upper-case letters and numbers (no hyphens). Each entity registers an entity code. Code should be chosen such that it is most recognizable. It is recommend that the entity code is either a truncated entity name or a stock ticker symbol. + xml:lang="en">Measured Energy Loss Due To Soiling, Amount + xml:lang="en">Indicates if there are exceptions to the Tax Indemnity Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Availability Of Breakage Fee Agreement, Flag + xml:lang="en">Link to the Construction Contractor Notice Of Certification document. + + xml:lang="en">Document Identifier, Asset Management Document + xml:lang="en">Maintenance cost of signage under warranty. + xml:lang="en">Developer Subcontractor Use, Description + xml:lang="en">City where the entity is based. + xml:lang="en">Expected annualized loss due to real module capacity based on flash test results or assumed difference from nameplate capacity based on major design/energy production model used. + xml:lang="en">Tracker Stow Wind Speed + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Consumables List. Consumables are parts that are used up quickly and must be replenished, such as fuses. + xml:lang="en">A tax based on the assessed value of real estate by the local government. The tax is usually based on the value of property (including the land). Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Size of the entity in megawatts. + xml:lang="en">Other Testing Source Requirement Documents Used, Description + xml:lang="en">Optimizer Maximum Power Point Tracking maximum operating voltage range. + + xml:lang="en">Percent of preventative maintenance that has been completed. + xml:lang="en">Project Description - + xml:lang="en">Indicates the type of asset for the project which can be wind, solar or solar plus storage. + xml:lang="en">Amount of decrease in maximum current as temperature increases, measured in percent per Celsius. May also be known as αIpmax. + xml:lang="en">Invoice Including Wiring Instructions Exceptions, Description + xml:lang="en">Vegetation Management Equipment Rental Expense, Amount + xml:lang="en">Employee Role [Table] + xml:lang="en">Cross-collateralization Structure Among Funds, Description + + xml:lang="en">Partnership Flip [Abstract] + xml:lang="en">Classify type of closing document, for example, Financial Model, Consent, Estoppel, Lien Waiver, Transfer of Title, Officer Certificate, Membership Certificate, Certificate of Insurance, Flow of Funds, Opinion, Third Party Report + xml:lang="en">Zip (postal) Code where the site is based. + xml:lang="en">Information about the module factory audit report. + xml:lang="en">Term Loan, Expiration Date + xml:lang="en">Description of the Renewable Energy Credit Contract rate type. + + xml:lang="en">SCADA Systems Manufacturer, Email Address + xml:lang="en">State tax credits, actual or forecast. Values reported as forecast should use the StatementScenarioAxis. + xml:lang="en">Percentage of kWh lost due to soiling based on typical meteorological month, calculation based on major design model used. + xml:lang="en">Used to group information about Workers Compensation insurance related to the project or the system. + xml:lang="en">Optimizer Certifications [Abstract] + xml:lang="en">Project Address 2 + xml:lang="en">Authorization To Mark Letter From NRTL, Flag + xml:lang="en">Pricing Model, Investment Tax Credit, Grant Claimed, Amount - + xml:lang="en">Permits And Assessments Review Building Permits [Member] + xml:lang="en">Availability Of Final Master Services Agreement, Flag + + xml:lang="en">Information about the solar systems production. + + xml:lang="en">Operations Manager Warranty Experience, Description + xml:lang="en">Availability Of Exceptions To The Shared Facility Agreement, Flag - + xml:lang="en">Average cost of the device. + xml:lang="en">Used to group information about measures that are estimated into the future. + xml:lang="en">Maximum power output, under standard test conditions, of the battery management system. + xml:lang="en">Reportable Environmental Condition Identifier [Table] + + + xml:lang="en">Availability Of Project Administration Agreement, Flag - + xml:lang="en">Property Insurance General Requirement, Description + xml:lang="en">Monthly income from investment tax liability deferred to future period relative to funding date + xml:lang="en">Information about a Shared Facility Agreement which could apply to sharing a building property, substation, a piece of equipment, etc. + xml:lang="en">Term in years of the Renewable Energy Credit contract performance guarantee. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Contract Review Spare Parts List [Member] - + xml:lang="en">Equipment Type Warranty Output, Description + xml:lang="en">Vegetation Management [Abstract] + xml:lang="en">Date the credit check was performed. + xml:lang="en">Number of inverters connected to an array. + xml:lang="en">Inverter Power Level [Domain] + xml:lang="en">Asset Management Contract, Link + xml:lang="en">Financing Event, Description + + xml:lang="en">Interconnection Agreement [Abstract] + + xml:lang="en">Workers Compensation Insurance [Line Items] + + xml:lang="en">Describes type of regulatory facility, which can be QF (Qualified Facility), EWG (Exempt Wholesale Generators), or Not Applicable. + + xml:lang="en">Lease Basic Rent, Amount + xml:lang="en">Sponsor Name + xml:lang="en">Information about closing documents used during the onboarding process. + xml:lang="en">Financial Model Review Of Curtailment Study [Member] + xml:lang="en">Used to group a listing of information about an Operations Manager. + xml:lang="en">Document Identifier, Closing Certificate + xml:lang="en">Information about the exposure report. + xml:lang="en">Inverter, DC Optimized, Flag + xml:lang="en">DC capacity of the system at Standard Test Condition (STC), often referred to as kWp (kilowatt peak). + xml:lang="en">Substantial Completion Certificate Exceptions, Description + xml:lang="en">Test Condition [Axis] + xml:lang="en">Module has Certification IEC62108, concentrator PV modules. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Information about Security Interest, which is when the bank shares ownership, or is a joint counterparty, to something of value, such as the project itself or a key agreement like the asset management. + xml:lang="en">Site Review Of Off Site Contamination [Member] + xml:lang="en">Table containing information about Casualty insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + + xml:lang="en">Module Temperature Coefficient Maximum Current + xml:lang="en">Availability Of Property Insurance Certificate, Flag + xml:lang="en">Use of Funds, Counterparty Identifier + xml:lang="en">Availability Of Exceptions To The Pricing File, Flag - + xml:lang="en">Amount of money invested in project company by the investor + xml:lang="en">Description of other service offerings available from the operations manager. + xml:lang="en">Ambient Temperature For Power Target Cap Measurement + + + + xml:lang="en">Project Company (Special Purpose Vehicle), Name + xml:lang="en">Used to show the dimensions of a module. + + + xml:lang="en">Names of counterparties to the Membership Certificate of Lessee. + xml:lang="en">Earnings Before Income Tax, Depreciation and Amortization of the project divided by rent. + + xml:lang="en">Preparer Of Site Lease Assignment, Name + xml:lang="en">Name of the company responsible for preparing the IECRE Certificate. - + xml:lang="en">Indicates if there are exceptions to the Membership Interest Purchase Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Name of the company responsible for preparing the Easement Report. + xml:lang="en">Interconnection Fees at installation. + xml:lang="en">Expected annualized DC capacity degradation on the module-level after the first year based on major design/energy production model used. + xml:lang="en">Uncertainty of the energy measurement (stated as +/- percent). + xml:lang="en">Continuity of Operations Agreement, Backup Asset Management Mobilization Fee, Amount + xml:lang="en">Portfolio Identifier [Axis] + xml:lang="en">Expiration date of the UCC Tax Lien and Judgment Lien Searches. + xml:lang="en">Preparer Of Equipment Warranties, Name + xml:lang="en">Indicator if the tracker is fixed tilt; if it is TRUE, if it is not, FALSE. - + xml:lang="en">Description of equipment issues during the construction phase. + xml:lang="en">Used to group information about the vegetation management for the site. - + xml:lang="en">Availability Of Site License Agreement, Flag + xml:lang="en">Description of the reason revisions were made to the cut sheet. + xml:lang="en">Information about payment servicing related to various kinds of project finance. + xml:lang="en">Reportable Environmental Condition Identifier [Axis] + xml:lang="en">Equipment Review SCADA Systems Meters [Member] + xml:lang="en">Appraisal Exceptions, Description + xml:lang="en">Name of the company responsible for preparing the Incentive Assignment. + xml:lang="en">Indicates if there are exceptions to the Mechanical Completion Certificate. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Document Identifier, Project Administration Agreement + xml:lang="en">Link to the Module Accelerated Age Test Report document. + + + xml:lang="en">Description of special reps and warranties in the Master Purchase Agreement, which covers the agreement of the developer to sell the assets to the investor. + xml:lang="en">Represents a rooftop installation. + xml:lang="en">Partnership Flip Counterparty Jurisdiction, Description + xml:lang="en">Description of the action taken which can be to repair or replace the component. + + + xml:lang="en">Level of severity of the major operational event, which can be Low, Moderate, or High. + + xml:lang="en">Description of the payment method for the performance based incentive. + xml:lang="en">Indicates if the Shared Facility Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Pro Forma P50 Flip Date + xml:lang="en">Regulatory Approval, Link + xml:lang="en">Link to the Installation Agreement document. + xml:lang="en">Date of the partnership flip when the annual energy output is a P75 yield. + xml:lang="en">Indicates if the Shared Facility Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Names of counterparties to the Substantial Completion Certificate. + xml:lang="en">Information about the Financing Event. + xml:lang="en">Date at which the design is completed and ready to move forward with ordering equipment and starting construction. + xml:lang="en">Serial number of the device. + xml:lang="en">Credit Support for Operations and Maintenance Agreement, Flag + + xml:lang="en">Appraisal Method, Description + xml:lang="en">Represents 13:00 in 24 hour military time, 1:00 pm. on the am/pm 12 hour clock. + + xml:lang="en">Name of developer and name of investor who are party to the Breakage Fee Side Letter, which is used in the event the project is not funded or if the developer decides not to move forward with the project and breaks the agreement. + xml:lang="en">Description of any exceptions to the Master Services Agreement. + xml:lang="en">Continuity of Operations Agreement, Parallel Monitoring, Counterparty + xml:lang="en">Insurance, Minimum Coverage + xml:lang="en">Initial monthly savings projected to be received by the utility for first year as amount per kilowatt hour. + xml:lang="en">Bank account number. + xml:lang="en">Natural Resource [Abstract] + + xml:lang="en">Number of the devices used in a system. + xml:lang="en">Interest payable, which is the amount of interest that must be paid in that period. + xml:lang="en">Name of the company responsible for preparing the LLCA Agreement. + xml:lang="en">Closing Indemnity Agreement Exceptions, Description + + xml:lang="en">Cost Segregation Details [Line Items] + xml:lang="en">Description of any exceptions to the Lessee Collateral Agency Agreement or issues raised. + xml:lang="en">Equipment review of Data Acquisition System/Meters. + xml:lang="en">Description of the preventative and corrective maintenance plan and use of major maintenance budgets and reserve account by the operations manager. - + xml:lang="en">Response Time to Major Reported Event + xml:lang="en">Availability Of Independent Engineering Opinion Report, Flag + xml:lang="en">Preparer Of Certificates Of Insurance, Name + + xml:lang="en">Approvals, Proof, Link + xml:lang="en">Used to identify classes of equipment used in a system, for example, inverter, module. + xml:lang="en">Product Identifier, Monitoring Solution [Abstract] + xml:lang="en">Energy Contract Hourly Rate, Hour 2 [Member] + xml:lang="en">Phase Of Project Needed + xml:lang="en">Information about uncertainty measures related to the system. + xml:lang="en">Information about Energy Production Insurance to protect against reduced energy production in the event of unexpected circumstances. + xml:lang="en">Total contracted cost of the engineering procurement and construction. + xml:lang="en">Used to group information about the installation types. + xml:lang="en">Indicates if the Transmission Report and Curtailment Estimate is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">System Drawing, Link + + xml:lang="en">Renewable Energy Credit Buyer Acknowledgement Exceptions, Description + xml:lang="en">Lessee Claim Documents, Effective Date + xml:lang="en">Energy Budget Periodicity, Description + xml:lang="en">Developer Portfolio Performance Guarantee, Term + + xml:lang="en">Funds Flow, American Bankers Association Routing Number + xml:lang="en">Supervisory Control and Data Acquisition System is designed to support the technology of the solar plant. + xml:lang="en">The total invested capital at the end of the reporting period. + xml:lang="en">Used to represent early buy out options in project financing. + xml:lang="en">Represents 05:00 in 24 hour military time, 5:00 am. on the am/pm 12 hour clock. + + xml:lang="en">Expected flip period for the partnership based on a P95 yield. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Certificates Of Insurance, Expiration Date + xml:lang="en">Actual measured insolation divided by weather adjusted insolation inception to date. + xml:lang="en">Indicates if the Property Tax Exemption Opinion is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Identifier for the SPV that is providing the funds. + xml:lang="en">Amount of energy lost due to curtailment based on major design/energy production model due to reasons other than economics (wholesale market pricing or the like), stability, congestion, emergencies, or construction. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">Average altitude of PV system array. + xml:lang="en">Name of owner participant in the Master Lease. + xml:lang="en">Counterparties To The Lessee Security Agreement, Names + xml:lang="en">Information about the operations and maintenance participant. + xml:lang="en">Washing Frequency + xml:lang="en">Equipment Type Warranty [Line Items] + xml:lang="en">Information about the Host Acknowledgement for the project. + xml:lang="en">Effective date of the Breakage Fee Side Letter, used in the event the project is not funded or if the developer decides not to move forward with the project and breaks the agreement. + + xml:lang="en">SCADA Systems, Model Number + xml:lang="en">Description of the qualifications required through the North American Electric Reliability Corporation (NERC) and Federal Regulatory Commission (FERC) for the asset manager. + xml:lang="en">Future surplus cash to developer, actual or forecast. Values reported as forecast should use the StatementScenarioAxis. - + xml:lang="en">Membership Certificate Of Master Lessee [Abstract] - - + xml:lang="en">Amount paid by the customer upfront in a contract between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company. + xml:lang="en">Name of the company responsible for preparing the Power Purchase Agreement + xml:lang="en">Product Identifier, Meter [Abstract] - - + xml:lang="en">Credit Support [Table] + xml:lang="en">Equipment Review Racking Tracker Or Parking Structure [Member] + xml:lang="en">Cultural Resource Permit, Identifier + xml:lang="en">Account balance for the project. + xml:lang="en">Component Maintenance Cost (No Warranty) SCADA System, Amount + xml:lang="en">Indicates if the Other Equipment Due Diligence Reports is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Monthly Operating Report Overview, Description + xml:lang="en">Pricing Model, Swap Rate, Percent + + xml:lang="en">Description of the communication protocol of the logger. + xml:lang="en">Represents information about portfolios within a fund such as size of the portfolio, and legal entity identifier. - - + xml:lang="en">Independent Engineering Services Checklist Financial Model Review [Member] + xml:lang="en">Power Purchase Agreement, Portion of Site, Percent + xml:lang="en">Inverter Output, Maximum Current AC, Amount + xml:lang="en">Expected PV Production At P99, Energy + + xml:lang="en">Information about the System. + xml:lang="en">Site Details [Abstract] + xml:lang="en">Information about title policy exceptions. + xml:lang="en">Indicates the operational status of the system which can be operational, under maintenance, communication failure, or decommissioned. + + xml:lang="en">Phase of the project which can be pre-construction, early construction, periodic throughout construction, upon initial funding (Mechanical Completion) or upon final funding (Substantial or Final Completion). + xml:lang="en">Limited Liability Company Agreement, Effective Date + xml:lang="en">Represents a ground mounted installation. + xml:lang="en">Operational Events And Issues Reporting [Table] + xml:lang="en">Indicates if the entity or counterparty is a PPA Offtaker; if it is, TRUE; if it is not, FALSE. + xml:lang="en">Term of the Power Purchase Agreement. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Module Temperature Coefficient Maximum Power + xml:lang="en">Fund Nameplate Capacity PV Arrays, Power + xml:lang="en">Counterparties To The Certificate Of Formation For Master Lessee, Lessee And Operator, Names + xml:lang="en">Power Purchase Agreement, Escalator, Percent + xml:lang="en">Used as an identifier for outstanding balance amounts on customer accounts at different stages of aging, for example, current, past due 30 days, past due 60 days. + xml:lang="en">Interconnection Agreement, Special Features, Description + xml:lang="en">Power Purchase Agreement Actual revenue generated. + xml:lang="en">Loss Factor, Calculation Type + xml:lang="en">Component Maintenance Cost (Under Warranty) Inverter, Amount + xml:lang="en">Regulatory Approval, Status + xml:lang="en">Equipment Manufacturer Details Address State + xml:lang="en">Incentives, Description - + xml:lang="en">Legal Entity Membership Certificate, Link - + xml:lang="en">Operations And Maintenance Provider, Response Time + xml:lang="en">Amount of breakage fee for the developer, used in the event the project is not funded, or if either counterparty breaks funding agreement. + - - - + xml:lang="en">Availability Of Limited Liability Company Agreement, Flag + xml:lang="en">Name of the guarantee. + xml:lang="en">Issue Detail, Impact, Description + xml:lang="en">System Availability Achievement Requirement, Description - + xml:lang="en">Number of renewable energy credits guaranteed per the performance agreement. + xml:lang="en">Engineering, Procurement and Construction Warranty, Initiation Date + xml:lang="en">Indicates if there are exceptions to the Site Lease Assignment or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Expected PV Production At P75, Energy + + + xml:lang="en">Information about the Property Tax Exemption Opinion for the project. + + + xml:lang="en">Loss Factor, Name + xml:lang="en">Primary role of the entity which can be one of the following: Asset Owner, Asset Owner Parent Company, General Contractor, Prime Contractor, Surety, Bond Agent, Insurance Broker, Developer Attorney, Corporate Attorney, Contract Attorney, Environmental Attorney, Land-Use Attorney, Tax Attorney, Litigation Attorney, Interconnecting Utility as Authority Having Jurisdiction, Permitting Authority as Authority Having Jurisdiction, Regional Transmission Operator as Authority Having Jurisdiction, Independent System Operator as Authority Having Jurisdiction, Environmental Consultant, Equipment Factory Auditor, Independent Engineer, Insurance Consultant, Equipment Reliability Test Lab, Tax Consultant, Transmission Consultant, Appraiser, Weather Data Provider, Utility, REC Offtaker, General Contractor, Engineering Contractor/Installer, Construction Contractor/Installer, Subcontractor Contractor/Installer, Builders/Construction All-Risk Insurers, Ocean Cargo Insurer, General Liability Insurer, Automobile Liability Insurer, Workers Compensation Insurer, Umbrella/Excess Liability Insurer, Pollution Liability Insurer, Property Insurer, Business Interruption Insurer, Project Performance Insurer, Construction Lender, Back-leverage Lender, Commercial Lender, Personal Lender, LLC Partner Managing Member, LLC Partner Voting Member, LLC Partner Passive Member, Project Developer, Project Host, Long-term Equity Investor, Tax-equity Investor, Lessor, Asset Manager, Back-up Asset Manager, Collateral Agent, Energy Price Forecaster, Hedge Provider, Monitoring Service Provider, Back-up Monitoring Service Provider, Parallel Monitoring Service Provider, Operator, Back-up Operator, Maintenance Provider, Back-up Maintenance Provider, Scheduling Coordinator, Site Security Company, Subcontractor, Telecom Provider, Trustee, Energy Forecasting Service, Equipment Warranty Provider, Construction Warranty Provider, Site Owner/Site Control, Equipment Manufacturer, PPA Offtaker, COP Backup Provider, Bank. + xml:lang="en">Status Report Of Independent Engineering Opinion Letter [Member] + + xml:lang="en">Information about Universal Insurance. + + xml:lang="en">Rooftop [Member] + xml:lang="en">Equity Contribution Agreement, Expiration Date + xml:lang="en">Lien Waiver [Abstract] + xml:lang="en">Description of federal tax incentive. + xml:lang="en">Site Lease Assignment [Line Items] + xml:lang="en">Indicates if the Equity Contribution Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Period Second Quarter [Member] + + xml:lang="en">Indication whether employment has been verified throught the employees W2; if it has been verified, TRUE; if it has not been verified, FALSE. + xml:lang="en">Percent efficiency rating of the inverter at vnom with a specified inverter power level. Vnom is nominal input voltage of the inverter in DC. + xml:lang="en">Effective date of the Master Purchase Agreement, which covers the agreement of the developer to sell the assets to the investor. + + + + xml:lang="en">Environmental Site Assessment I, Report Author, Name + xml:lang="en">ACH Payment Penalty, Amount + xml:lang="en">Lease Counterparty Type, Description + xml:lang="en">Indication as to whether grounding is available for the inverter. If Ungrounded (Transformerless), FALSE. If Grounded, TRUE. + xml:lang="en">Lease Proportional Rent, Amount - - + xml:lang="en">Description of the fire rating as classified by IEC 61730. + xml:lang="en">Indicates if the Operations And Maintenance Contract is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">IECRE Certificate Type: OD-403-1 (PV system Design Qualification Certificate, Part 1 PV Site Qualification), OD-403-2 (PV system Design Qualification Certificate, Part 2 PV Power Block Design Qualification), OD-403 (PV system Design Qualification Certificate),OD401-1 (PV Conditional PV system Certificate: Part 1 PV Construction Completion), OD-401 (Conditional PV Project Certificate), OD-402 (Annual PV system Performance Certificate), OD-404 (PV Asset Transfer Certificate), OD-409 (PV system Decommissioning Certificate); reference www.iecre.org/documents/refdocs/ + xml:lang="en">Number of Data Acquisition Systems in a portfolio. + xml:lang="en">Continuity Of Operations Agreement, Term + xml:lang="en">Amount of revenue recognized from goods sold, services rendered, insurance premiums, or other activities that constitute an earning process. Includes, but is not limited to, investment and interest income before deduction of interest expense when recognized as a component of revenue, and sales and trading gain (loss). Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Total number of battery inverters in the system. + xml:lang="en">Availability Of Final Supply Agreements, Flag + xml:lang="en">Expiration date of the Site Lease Assignment. - + xml:lang="en">Expected lease payments from project company. + xml:lang="en">Use to group a listing of information about a portfolio. + xml:lang="en">Used to group a listing of information about the Appraisal. + xml:lang="en">Asset Manager Preventative and Corrective Maintenance, Description + xml:lang="en">Preparer Of Other Equipment Due Diligence Reports, Name - + xml:lang="en">Counterparties To The Financial Lease Schedule, Names + xml:lang="en">The time interval at which lease payments are to be made to the system owner, for example, monthly, quarterly, annually. + xml:lang="en">Link to the Operations Manual document. + xml:lang="en">Uncertainty in expected energy arising from all factors (including bias and precision) of energy measured, expressed as +/- percent uncertainty. + xml:lang="en">Component Maintenance Cost (No Warranty) Roads, Amount + xml:lang="en">Amount of other payments made to financiers. + xml:lang="en">Time stamp indicating last day of IEC 61724-3 test, administered under OD-402. + xml:lang="en">Indicates that the fund has storage projects in it. If the fund does have storage projects, TRUE. If it does not, FALSE. + xml:lang="en">Document Identifier, Site Lease Assignment + xml:lang="en">Indicates if there are exceptions to the lien waiver. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Module Has Certification Other, Description + + xml:lang="en">Indicates if the test equipment was calibrated when the test was performed. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Names of counterparties to the module factory audit report. + xml:lang="en">Performance Based Incentive Term + xml:lang="en">Inverter Output, Rated Power AC, Amount + xml:lang="en">Description of operational areas that will be outsourced along with qualifications of the companies the asset manager will engage. + xml:lang="en">Availability Of Exceptions To The Certificate Of Final Completion, Flag + xml:lang="en">Power Purchase Agreement Seasoning, Number of Payments Made - + xml:lang="en">Information about the Master Lessee Collateral Agency Agreement for the project. + xml:lang="en">Energy Budget Status, Description + xml:lang="en">Component Maintenance Cost (Under Warranty) Combiner Box, Amount + + + xml:lang="en">Master Lease, Property Insurance Provider Required AM Best Quality Rating + xml:lang="en">Employee Role [Line Items] + + xml:lang="en">Cost Segregation Amortization Tax Basis, Amount + + xml:lang="en">Identifier for Term Loan Agreement. + xml:lang="en">Rebate Revenue + + xml:lang="en">Link to the Construction Loan document. + xml:lang="en">Master Lease Exceptions, Description + xml:lang="en">Warranties Review PV Modules [Member] + xml:lang="en">Information about a Construction Loan Agreement. + xml:lang="en">Counterparties To The Shared Facility Agreement, Names + xml:lang="en">Zoning Permit Termination Rights, Name + + + xml:lang="en">Environmental Site Assessment Details [Line Items] + xml:lang="en">Inverter is at a weighted average power level, calculated as 4% of 10% power level output + 5% at 20% power level output + 12% at 30% power level output + 21% at 50% power level output + 53% at 75% power level output + 5% at 100% power output level. + xml:lang="en">Other Permits [Table] + xml:lang="en">Environmental Site Assessment II [Line Items] + xml:lang="en">UCC Security Agreement, Expiration Date + xml:lang="en">Link to the title report. + xml:lang="en">Indicates the climate zone for the site which can be Very Hot - Humid (1A), Very Hot - Dry (1B), Hot - Humid (2A), Hot - Dry (2B), Warm - Humid (3A), Warm - Dry (3B), Warm - Marine (3C), Mixed - Humid (4A), Mixed - Dry (4B), Mixed - Marine (4C), Cool - Humid (5A), Cool - Dry (5B), Cool - Marine (5C), Cold - Humid (6A), Cold - Dry (6B), Very Cold (7), Subarctic (8), per International Climate Zone Definitions ANSI/ASHRAE/IESNA Standard 90.1-2007 Normative Appendix B – Building Envelope +Climate Criteria. + xml:lang="en">Lease Interest Payable On Section 467, Amount + xml:lang="en">Project Early Buyout Options [Abstract] + + + xml:lang="en">Storage Of Spare Parts Expense, Amount + xml:lang="en">Indicates if the Commitment Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. - + xml:lang="en">Construction Data Report Submitted, Flag + xml:lang="en">Indicates if credit support is for the Asset Management Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Information about the lease. + xml:lang="en">Address of the system operations and maintenance provider. + xml:lang="en">Credit Support Beneficiary, Counterparty Identifier + xml:lang="en">Master Purchase Agreement, Completion Covenant, Description + xml:lang="en">Description of the operations manager plans for renewable energy credit (REC) accounting, for example through WREGIS, renewable energy registry and tracking. + xml:lang="en">Tax Equity Partner, Name - + xml:lang="en">Fund Legal Counsel, Name + xml:lang="en">Description of developer staff and internal organizational structure. + + + + xml:lang="en">Information about the Pricing File for the project. + + xml:lang="en">Inverter Power Level [Axis] - + xml:lang="en">Security Company + xml:lang="en">Percentage of kWh lost due to Ohmic losses (both AC and DC), for a typical meteorological year, calculation based on major design/energy production model used. + xml:lang="en">Availability Of Operations And Maintenance Agreement, Flag + xml:lang="en">Site Climate Classifications Koppen, Description + xml:lang="en">Module has Certification IEC61730/EN61730, safety qualifications. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Master Lease, Effective Date - + xml:lang="en">Surety [Abstract] + xml:lang="en">Module Factory Audits Production Oversight and Remediation Report [Member] + xml:lang="en">Information about the Membership Certificate of Master Lessee for the project. + xml:lang="en">Expiration date of the Engineering Procurement and Construction performance guarantee that the project will perform at a certain level of energy output. + xml:lang="en">Indicates if the Building Inspection is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Component Maintenance, Percent Remaining + + xml:lang="en">Operations and Maintenance Company, Web Site + xml:lang="en">System Onboarding [Abstract] - + xml:lang="en">Used to collect information about an OffTaker. + xml:lang="en">System Availability, Method Used, Description + xml:lang="en">Effective date of the Invoice Including Wiring Instructions. + xml:lang="en">Credit Support for Site Permit, Flag + xml:lang="en">Accounts Receivable Aging [Domain] + xml:lang="en">Inverter is at 10% power level. + xml:lang="en">Certification number for the product. + + xml:lang="en">Description of any exceptions to the Invoice Including Wiring Instructions or issues raised. + xml:lang="en">Date when the inverter UL1741 Supplement A Certification was received. - + xml:lang="en">Approval Memo [Axis] + xml:lang="en">Represents 18:00 in 24 hour military time, 6:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Preparer Of Operations And Maintenance Agreement, Name + xml:lang="en">Inverter Operating Temperature Range Maximum + + + + xml:lang="en">Term of the developer performance guarantee for the project which may be in years or months. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Indicates if there is a cross default pool for the Site Permit Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Information specific to module products that are used in the system. + + xml:lang="en">Minimum Threshold for Guarantee Payment, Percent + xml:lang="en">Used to identify test conditions such as Standard Test Conditions, PTC or Nominal Operating Conditions used when measuring. The default is normal operating conditions. + xml:lang="en">Indicates if the optimizer has iec61010 certification, safety standard. If it does, TRUE; if it does not, FALSE. - + xml:lang="en">Interconnection Approval, Link + xml:lang="en">Parent Guarantee, Effective Date + xml:lang="en">Description of the version of the budget. + xml:lang="en">Developer Project Commissioning and Performance Testing, Description + xml:lang="en">Size of storage facility in kW. + xml:lang="en">Counterparties To The Pricing File, Names + xml:lang="en">Information about the Assignment and Assumption Agreement for the project. + xml:lang="en">Indicates if the Breakage Fee Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Document Identifier, Hedge Document + xml:lang="en">Equipment Manufacturer Details Address City + xml:lang="en">Identifier for Funding Memo. + xml:lang="en">The legal description of the building relative to property type. + + xml:lang="en">Indicates if there are exceptions to the LCC Registration or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Zoning Permit, Upfront Fee Status, Description - + xml:lang="en">Inverter Is Microinverter, Flag - + xml:lang="en">Identifier for Renewable Energy Credit Offtaker Agreement. + xml:lang="en">Mechanical Completion Certificate, Link - + xml:lang="en">Warranties Review Inverters [Member] + xml:lang="en">Costs And Expenses Per Watt + + xml:lang="en">Revenue Meter Rating, Continuous Voltage, Line To Neutral + xml:lang="en">Appraisal, Link - + xml:lang="en">Approval Notice, Effective Date + xml:lang="en">Measured energy availability for the indicated time period due to issues with Balance of Plant (BOP) components calculated as the ratio of the total energy that could have been produced minus the energy lost due to BOP issues divided by the total energy that could have been produced. + xml:lang="en">Tracker Tilt, Degrees + xml:lang="en">Third Party [Abstract] - - + xml:lang="en">Continuity of Operations, Historian Access, Description + xml:lang="en">Asset Manager NERC and FERC Qualifications, Description + + xml:lang="en">Expiration date of the Lessee Claim Documents, providing evidence of Lessee’s claim to state rebates, subsidies or incentives for the project. + xml:lang="en">Link to the Independent Engineering Report document. + xml:lang="en">Link to the Equity Contribution Guarantee document. + xml:lang="en">Name and title of the host (owner) of the site. + xml:lang="en">Certificate Of Formation, Link + xml:lang="en">Names of counterparties to the Notice of Commercial Operations Date. + xml:lang="en">Entity Role Indicator [Abstract] + xml:lang="en">Pro Forma, Link + xml:lang="en">Information about the Mechanical Completion Certificate which is issued by the engineer to indicate that all equipment has been installed. + xml:lang="en">Equipment Type Manufacturer, Web Site + xml:lang="en">Expected Active Electrical Production at the revenue meter for indicated time period in kWh per IEC 61724-3 using measured weather data during times of availability and including adjustments for parasitic losses. See Section 6.6.6 of IEC 61724-3. This element is defined as the sum of electrical production over a period of time, for example the first day of the month to the last day of the month, and has a period type of duration. This should not be used with the Period [Axis]. + xml:lang="en">Identifier for the Monitoring Contract Agreement. + xml:lang="en">Operator Performance Guarantee, Sponsor Performance Guarantee, Term + xml:lang="en">Date of execution of the lease contract. May be the same as the commencement date of the lease. + xml:lang="en">Parasitic Loss Model Factor, Typical Met Year, Percent + xml:lang="en">Reserve Pre Funded Months, Number + xml:lang="en">Board Resolution, Link + + xml:lang="en">Logger equipment. + xml:lang="en">Availability Of Installation Agreement, Flag + xml:lang="en">Financing Event, Identifier + + + xml:lang="en">Description of any exceptions to the lien waiver. + xml:lang="en">Indicates if the Module Accelerated Age Test Report is available. If it is available, TRUE; if it is not available, FALSE. - + xml:lang="en">Model Reference Cell Temperature + xml:lang="en">Document Identifier, Substantial Completion Certificate + xml:lang="en">Portfolio Identifier + xml:lang="en">Cost of maintaining the security equipment. + xml:lang="en">Predicted Energy At The Revenue Meter For Period + xml:lang="en">Power Purchase Agreement Amendment, Expiration Date + + + xml:lang="en">Site Control Rent, Amount + xml:lang="en">Nameplate capacity (nominal power) of the module estimate set by the manufacturer for all modules of that type. Measured in Watts. + xml:lang="en">Contractors review of part of the Independent Engineer Report covering O&M and main subs. - + xml:lang="en">Mechanical Completion Review Commissioning Test Megger Testing [Member] - + xml:lang="en">Name of backup Operations and Maintenance contract counterparty. + xml:lang="en">Preparer Of Developer Project Performance Guarantee Agreement, Name - + xml:lang="en">Limit to deficit restoration obligation. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. - + xml:lang="en">Preparer Of Partnership Flip Contract For Project, Name + xml:lang="en">Combiner, Rating kWdc + xml:lang="en">Information about the Certificate of Formation for Master Lessee, Lessee and Operator for the project. + xml:lang="en">Description of any exceptions to the Environmental Impact Report. + xml:lang="en">Name of the company responsible for preparing the Lien Waiver. + + xml:lang="en">Expected Rents Receivables, Amount + + xml:lang="en">Link to the Notice Of Approval document. + + xml:lang="en">Predicted Energy [Abstract] + xml:lang="en">Effective date of the Insurance Consultant Report. + xml:lang="en">Date on which the approval memo was submitted. - - + xml:lang="en">Document Identifier, Breakage Fee Side Letter Document - + xml:lang="en">Master Purchase Agreement, Indemnities, Description + xml:lang="en">Indicates if the Approval Notice is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. - + xml:lang="en">Information about certifications for specific products. + xml:lang="en">Independent Engineering Services Notes, Date - - + xml:lang="en">Security Agreement Supplement, Link - + xml:lang="en">Number of units used to measure power system capacity for performance based incentive. - - + xml:lang="en">Name of the offtaker for the financial contract, used with C&I customers. + xml:lang="en">Parent Guarantee, Guarantee Limits, Description + xml:lang="en">Availability Of Exceptions To The Appraisal, Flag - - + xml:lang="en">Indicates the level of the employee, for example, lead or support. + xml:lang="en">Information about the address of the project. + xlink:from="solar_EngineeringProcurementAndConstructionAgreementAbstract" + xlink:to="label_solar_EngineeringProcurementAndConstructionAgreementAbstract" + xlink:type="arc"/> + xml:lang="en">Information about the Engineering Procurement and Construction Agreement to build the system. - + xml:lang="en">Link to the UCC Tax Lien And Judgment Searches document. + xml:lang="en">Site Inspections Photographic Inspection At Final Completion [Member] + xml:lang="en">Used as the identifier for a permit that is related to the natural resource. + + + xml:lang="en">Name of the company responsible for preparing the Building Inspection. + xml:lang="en">Counterparties To The Monthly Operating Report, Names + xml:lang="en">Availability Of Exceptions To The Transmission Report and Curtailment Estimate, Flag + xml:lang="en">Amount of the upfront fee for the zoning permit. + xml:lang="en">Permits And Assessments Review ALTA Survey [Member] + xml:lang="en">Indicates if the appraisal considers the income approach. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Availability Of Exceptions To The Hedge Agreement, Flag + xml:lang="en">Preparer Of Washing And Waste Management Agreement, Name + + xml:lang="en">Insurance type which can be: Liability, Property, Commercial General Liability, Business Interruption, Property Casualty, Casualty, Workmans Compensation, Energy Production, Performance, Universal, Warranty, Surety Advance Payment Bond, Surety Engineering Procurement Construction Surety Payment Bond, Surety Engineering Procurement Construction Payment Bond With Solar Module Supplier Sublimits As Dual Obligee, Surety Interconnection Payment Bond, Surety On Bill Finance Energy Efficiency Upgrades, Surety Utility Payment Bond, Surety On Bill Finance Solar Projects Utility Payment Bond, Surety Power Purchase Agreement Surety Payment Bond, Surety Solar Facility Decommissioning Bond, Surety Solar Module Payment Bond, Surety Solar Module Supply Bond, Surety Solar Module Warranty Security Bond, Electronic Surety Bond Provider Module Warranty Security, Electronic Surety Bond Provider Power Purchase Agreement Payment Bond. + xml:lang="en">Estoppel Certificate Power Purchase Agreement, Expiration Date + + + xml:lang="en">Irradiance used for the targeted conditions for the capacity measurement using IEC 61724-2. + xml:lang="en">Substantial Completion Certificate [Abstract] + xml:lang="en">Information about the SubArray Geospatial Layout. + xml:lang="en">Project Asset Type + xml:lang="en">Measure of the power factor of the power system. + xml:lang="en">Reserve Pre Funded Required, Amount + + + xml:lang="en">Permits and assessments review of Utility Scale Interconnection agreement. + xml:lang="en">Indicates if IEC RE Rules Of Procedure have been met. If it has been met, TRUE; if it has not been met, FALSE + xml:lang="en">Module Back Material, Description + xml:lang="en">Cost Segregation [Table] + xml:lang="en">Engineering Procurement and Construction Warranty Expiration Date. + xml:lang="en">Name of the company responsible for preparing the Continuity Of Operations Agreement. + xml:lang="en">Base Lease Payment, Amount + xml:lang="en">Component Maintenance Cost (Under Warranty) Signage, Amount + xml:lang="en">Indicates if there are exceptions to the Appraisal or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Appraisal Source, Description + xml:lang="en">Indicates if the Punch List is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Indicates if the liability insurance certificate is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + + xml:lang="en">URI location where PDF of site surveys are stored. + xml:lang="en">Information about the installation agreement which allows the installation of the project and is between the site owner and the developer. - + xml:lang="en">Link to the UCC Security Agreement document. - + xml:lang="en">Description of special features in the Operations and Maintenance contract. - + xml:lang="en">Entity Address 2 + xml:lang="en">Module Maximum Voltage Per IEC + + xml:lang="en">Maximum power output, in kWdc, of the combiner model. + - + xml:lang="en">Preparer Of Parent Guarantee Agreement, Name - - - + xml:lang="en">Information about the Module Accelerated Age Test Report which covers results from an independent test on the modules. + xml:lang="en">Used as the identifier for the Operations Manager. + xml:lang="en">Operational budget review of Spare Parts List. + xml:lang="en">Indicates if the entity or counterparty is a utility; if it is, TRUE; if it is not, FALSE. - + xml:lang="en">Bank internal rating for sponsor + xml:lang="en">Start date of simple payback period. + xml:lang="en">Information about agreement identifiers for contracts supported by credit. + xml:lang="en">Name of the buyer (investor) in the Master Purchase Agreement which covers the agreement of the developer to sell the assets to the investor. + + + xml:lang="en">Time period over which curtailment is measured. + xml:lang="en">Availability Of Cut Sheets, Flag - + xml:lang="en">Component Maintenance Cost (No Warranty) Substation, Amount + xml:lang="en">Document Identifier, Commercial General Liability Insurance Policy + xml:lang="en">Resolution Time (repair time) is the time to resolve the fault starting from the moment of reaching the PV plant. Resolution Time is may not be guaranteed, because resolution time often does not depend totally on the O&M Contractor. The value should be entered as a durationItemType using the ISO8601 format of PnYnMnDTnHnMnS, where H means hours, M means minutes, and S means seconds. + xml:lang="en">Description of property insurance to cover hurricane/wind requirement. + xml:lang="en">Indicates if the independent engineering opinion report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. - - + xml:lang="en">Percentage of kWh lost due to snow based on typical meteorogical year, calculation based on major design/energy production model used. + xml:lang="en">Indicates if there are exceptions to the Operating Agreements for Master Lessee, Lessee and Operator or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Cultural Resource Permit Action, Name + + + xml:lang="en">Description of developer tax obligations. + xml:lang="en">Information about the Bank Account. + + xml:lang="en">Preparer Of Independent Engineering Opinion Report, Name + xml:lang="en">Power Purchase Agreement expected revenue generated from inception to date. + xml:lang="en">Description of units used to measure power system capacity for Renewable Energy Credit in power units. + xml:lang="en">Identifier for the obligor which is a counterparty. + + + xml:lang="en">Availability Of Final Environmental Impact Report, Flag + xml:lang="en">Site Control Type, Description + xml:lang="en">Counterparties To The Notice Of Commercial Operations Date, Names + xml:lang="en">Description of the closing document. + xml:lang="en">Operational budget review of Operations and Maintenance budget. - + xml:lang="en">Title Policy Insurance Proforma Document, Link + xml:lang="en">Appraisal, Entered Date + xml:lang="en">UCC Precautionary Lease Filing [Abstract] + xml:lang="en">Represents information about the cost segregation method used for an appraisal, which is the process of identifying personal property assets that are grouped with real property assets, and separating out personal assets for tax reporting purposes. Information about the cost segregation method used for a specific appraisal can include descriptions of the amortization class and method, tax basis amount and percent of appraised value. + xml:lang="en">Developer Project Performance Guarantee, Expiration Date + xml:lang="en">Used to identify classes of equipment used in a system, for example, inverter, module. + + + xml:lang="en">Document Identifier, Financial Lease Schedule + xml:lang="en">Project [Line Items] + xml:lang="en">Description of tax filing requirement. + xml:lang="en">Identifier for Partnership Flip Contract For Project. + xml:lang="en">Description of the type of other permit related to the site, for example, Electrical, Building, Wetlands. - + xml:lang="en">Energy Rate [Table] + xml:lang="en">Merchant Power Sales, Percent + + + + xml:lang="en">Product Description + xml:lang="en">Information about the property insurance certificate. + + xml:lang="en">Data Acquisition Systems, License Expiration Date + xml:lang="en">Percentage of energy lost due to curtailment from emergencies or construction work, based on major design/energy production model.To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">System Equipment [Table] + xml:lang="en">Hedge Agreement, Effective Date + xml:lang="en">Stability or Congestion Curtailment Model Factor, Percent + xml:lang="en">Indication as to whether the financing event is related to the total fund or an individual portfolio. + - + xml:lang="en">Description of the title policy exception. - + xml:lang="en">IECRE Letter Of Credit Details [Table] + xml:lang="en">Actual estimated cost of future low performance during period of the capacity test in currency/kWdc. + xml:lang="en">Link to the Project Administration Agreement document. + xml:lang="en">Value of the voltage when module is operating at maximum power and at low irradiance. May also be called Maximum Power Voltage, or VPmax, low. + xml:lang="en">Interconnection Approval [Abstract] + xml:lang="en">Name of the company responsible for preparing the Appraisal. + + xml:lang="en">Operational Issues, Warranty Related, Flag + + xml:lang="en">Effective date of the LCC Registration. + xml:lang="en">Email address for SCADA (Supervisory Control & Data Acquisition) system. + xml:lang="en">Indicates if the LLC Formation Documents is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Indicates if there are exceptions to the Term Sheet or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Statistical Module Batch Tests (each BOM/factory combo). + xml:lang="en">Zoning Permit, Recurring Fee, Description + xml:lang="en">Maintenance cost of substation with no warranty. + xml:lang="en">Indicates if the Lessee Collateral Agency Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Power Purchase Agreement, Counterparty Tax Obligations, Description + xml:lang="en">Funds Flow, Distribution Amount - + xml:lang="en">Insurance, Policy Form Version + xml:lang="en">Indicates if credit support is for the Membership Interest Purchase Agreement. If it is, TRUE; if it is not, FALSE. + - - - + xml:lang="en">Qualifying Facilities Self Certification, Expiration Date + xml:lang="en">Inverter Fan Status, Flag + xml:lang="en">Incumbency Certificate, Expiration Date + xml:lang="en">Availability Of Final Continuity Of Operations Agreement, Flag + + + xml:lang="en">Accounts Receivable Aging Balance Past Due Over 120 Days [Member] - + xml:lang="en">Prepaid expenses are available for the project; if available, TRUE; if not available, FALSE. + + + xml:lang="en">Notice and Payment Instructions, Effective Date + xml:lang="en">Name and title of primary subcontractor contact. + + xml:lang="en">Module Accelerated Age Test Report Exceptions, Description + + xml:lang="en">Energy Production Estimate Contribution From PAN File [Member] + + + xml:lang="en">Execution date of the Renewable Energy Credit Contract Amendment which is the amendment to the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">Zoning Covenants Details [Line Items] - + xml:lang="en">Amount of energy (kWh) guaranteed to be generated by the installation in the Power Purchase Agreement. + xml:lang="en">Latest Commercial Operations Date (COD) of a project in a fund. + + + + xml:lang="en">Name of the company responsible for preparing the Master Purchase Agreement. + xml:lang="en">Maximum value of the range within which the frequency of the inverter allows the AC to fluctuate, in herz. + xml:lang="en">Equipment Manufacturer Details [Abstract] + + + xml:lang="en">Operator Performance Guarantee, Sponsor Guaranteed Output, Energy + xml:lang="en">Document Identifier, Transmission Report And Curtailment Estimate + xml:lang="en">Indicator if the tracker is single axis; if it is TRUE, if it is not, FALSE. + xml:lang="en">Federal income tax rate assumption per the pricing model. + xml:lang="en">Value of the Renewable Energy Credit associated with the guaranteed firm volume in MWh per the Renewable Energy Credit Contract which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">Energy Contract Hourly Rate, Hour 22 [Member] + xml:lang="en">Term of the site control in years. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Description of the status of the fund, for example, it is closed, open, committed. + xml:lang="en">Debt Instrument Periodic Payment, Interest Per Watt + xml:lang="en">Link to the Closing Indemnity Agreement document. + + xml:lang="en">Document Identifier, Notice Of Approval + xml:lang="en">Limited Liability Company Agreement, Link + xml:lang="en">Information about the site property. + xml:lang="en">Measured Insolation + xml:lang="en">Operational Issues, Date And Time Individual Issue Commenced + xml:lang="en">Identifier for the counterparty that is providing the funds. + xml:lang="en">Zip Code where the project is based. + xml:lang="en">Mismatch Model Factor, Typical Met Year, Percent + xml:lang="en">Time stamp indicating the final day of the IEC 61724-2 test, administered under OD-401 or OD-402. + + xml:lang="en">Preparer Of Pricing File, Name + + xml:lang="en">Device [Table] - + xml:lang="en">Indicates if the Appraisal is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Power Purchase Agreement, Insurance Requirements, Description - + xml:lang="en">Module Technology, Type + xml:lang="en">Description of the location of physical keys to the system. + xml:lang="en">Indicates that the fund has wind projects in it. If the fund does have wind projects, TRUE. If it does not, FALSE. + xml:lang="en">Property Tax Exemption Opinion, Effective Date + xml:lang="en">Information related to a specific natural resource which is associated with the site. + xml:lang="en">Indicates if there are exceptions to the Invoice Including Wiring Instructions or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + + + xml:lang="en">Partnership Flip, P99 Flip Date + + xml:lang="en">Asset Manager Outsourcing Plan, Description + xml:lang="en">Performance Guarantee, Link + + xml:lang="en">Information about system availability used in developing an IECRE certificate. + xml:lang="en">Information about the American Land Title Association (ALTA) Survey. - + xml:lang="en">Expected incentive cost per kWh production from inception to date, cumulative per month, cumulative per year. - + xml:lang="en">Preparer Of Liability Insurance Policy, Name + xml:lang="en">Indicates if the Lessee Collateral Agency Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Energy Contract Hourly Rate, Hour 21 [Member] + xml:lang="en">Pledge Agreement, Effective Date + xml:lang="en">Description of the asset manager continuity of operations program. + xml:lang="en">Names of counterparties to the Operator Guarantee. + xml:lang="en">Preparer Of Sales Leaseback Contract For Project, Name + + xml:lang="en">Availability Of Exceptions To The Module Accelerated Age Test Report, Flag + + xml:lang="en">Indicates if the Continuity Of Operations Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Used to represent supply agreements related to a system. + xml:lang="en">Preparer Of Advisor Invoices, Name - + xml:lang="en">Stability or Congestion Curtailment Model Factor, Amount + xml:lang="en">Effective date of the Title Survey. + xml:lang="en">Expiration date of the Transmission Report and Curtailment Estimate. + xml:lang="en">Information specific to NetworkType products that are used in the system. + xml:lang="en">Description of the method used to determine system availability which could be defined as in IECRE 61724-3 or some other standard method. + + xml:lang="en">Engineering, Procurement and Construction Contract [Axis] [No Default] + xml:lang="en">Design Attribute [Abstract] + + xml:lang="en">Name of the company or individual that prepared the monthly operating report. + xml:lang="en">Effective date of the Independent Engineering Production Estimate Report. + xml:lang="en">Indicates if there are exceptions to the Lessee Security Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Warranties Review Other Material Equipment [Member] + xml:lang="en">Description of any exceptions to the Letter Of Credit. - + xml:lang="en">Volume cap on performance based incentive in kWh. - - + xml:lang="en">Partnership Flip Contract For Project [Abstract] - + xml:lang="en">Total investment value of the entity. + xml:lang="en">Date when the next lease payment is to be made. + + xml:lang="en">Percentage of energy lost due to curtailment based on major design/energy production model. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, and the EstimationPeriodForCurtailment. + xml:lang="en">Description of the project development strategy, for example, greenfield, brownfield, acquisition. - + xml:lang="en">Master Purchase Agreement, Effective Date + xml:lang="en">Property Insurance Certificate, Effective Date + xml:lang="en">Document Identifier, Letter Of Credit Agreement + + xml:lang="en">Estimated retail value of home. + xml:lang="en">Post Funding Activity Annual PV Plant Certificate [Member] + xml:lang="en">Inverter Certification Listing, Desciption + xml:lang="en">Power Purchase Agreement, Payment Method, Description + xml:lang="en">Developer Preferred Independent Engineers, Description + + xml:lang="en">Certificate Of Completion, Effective Date + xml:lang="en">Annual escalator percent increase compounded per year, calculated at project in-service date or date first monthly payment is due. + xml:lang="en">Module Performance, Warranty Type + xml:lang="en">Items on the Independent Engineering Services Checklist regarding transmission and curtailment. + xml:lang="en">Certificate Of Acceptance Report [Abstract] + xml:lang="en">Power Purchase Agreement, Commercial Operations Date Guaranteed + + xml:lang="en">Document Identifier, Design And Construction Documents + xml:lang="en">Lease Escalator, Start Date + + xml:lang="en">Model Factors Snow, Flag + xml:lang="en">Information about the Title Survey. + xml:lang="en">Link to a copy of the articles of organization for the legal entity. + xml:lang="en">Name of the company responsible for preparing the Property Insurance Policy. - + xml:lang="en">Counterparties To The Operations And Maintenance Manual, Names + + + xml:lang="en">Number of SCADA (Supervisory Control & Data Acquisition) systems in a portfolio. + xml:lang="en">Revenues, estimate made at start of project. + xml:lang="en">Module Rated Voltage At NOCT + - + xml:lang="en">Information about the site related to the IECRE certificate. + xml:lang="en">Preparer Of Pledge Agreement, Name + + xml:lang="en">Maintenance cost of Medium Voltage equipment under warranty. + xml:lang="en">Account number for the loan. + xml:lang="en">Indicates if the appraisal considers market comparables. If it does, TRUE; if it does not, FALSE. + xml:lang="en">AM Best Quality Rating required by the property insurance provider in the Master Lease. + xml:lang="en">Name of the obligor in the Parent guarantee, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. - - + xml:lang="en">First line of the address where project is based. + xml:lang="en">Maintenance cost of combiner box under warranty. + + xml:lang="en">Developer Tax Equity Communication Plan, Description + xml:lang="en">Amount payable, which is the sum of basic rent and interest payable on section 467 balance from lessee to lessor. + xml:lang="en">Status report on Supplemental Independent Engineer Reports (bring-downs). + + xml:lang="en">Names of counterparties to the Construction Monitoring Report. + xml:lang="en">Description of battery types that can be used to support the inverter. + xml:lang="en">Value of the current when module is operating at maximum power and at NOCT (nominal operating cell temperature). May also be called Maximum Power Current or IPmax, NOCT. + xml:lang="en">Identifier for Power Purchase Agreement. + xml:lang="en">Qualifying Facilities Self Certification, Link + xml:lang="en">Equity Contribution Guarantee Exceptions, Description + xml:lang="en">Regulatory FERC205 Application, Submission Date + xml:lang="en">Information contained in the Independent Engineering Report. + + - + xml:lang="en">Identifies the phase of the budget, for example, closing, initial funding, final funding. + xml:lang="en">Names of counterparties to the Site Lease Assignment. + xml:lang="en">Operations And Maintenance Contract, Contractor Performance Guarantee, Expiration Date + xml:lang="en">Information about estimated future degradation rates for the system and the array. + xml:lang="en">Water Expense, Amount + + xml:lang="en">Indicates if the EPC contract review has been considered. If it has been considered, TRUE; if it has not been considered, FALSE. + xml:lang="en">Provider of the Letter of Credit. + xml:lang="en">Actual To Expected Revenue Based Incentives, Percent - - - - + xml:lang="en">Link to the LLC Formation document. + xml:lang="en">Ratio of projects owned by the asset manager versus projected owned by third parties. + xml:lang="en">Operations Manual Exceptions, Description - + xml:lang="en">Cost of calibrating equipment which usually only applies to the pyranometer. + + + xml:lang="en">Performance Model Modified, Flag + xml:lang="en">Use to group a listing of information about the closing documents for a financing event. + xml:lang="en">Used as the identifier for the employees. + + xml:lang="en">Project Working Capital Account, Required Number Of Months + xml:lang="en">Link to the Incumbency Certificate document. + xml:lang="en">Table containing information about types of insurance, for example, casualty or property, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + xml:lang="en">Expiration date of the Construction Loan Agreement. + xml:lang="en">Identifier for Pledge Agreement. + xml:lang="en">URI location where PDF of site maps are stored. + xml:lang="en">Used to group information about the target balance in a bank account. + xml:lang="en">Link to the Parent Guarantee document. + xml:lang="en">Appraisal Input, Development Fee, Amount + xml:lang="en">Payments For Rent Per Watt + + xml:lang="en">Link to the cultural resource permit. + xml:lang="en">Expiration date of the parallel monitoring contract. - - + xml:lang="en">Indicates if there is security interest in the Term Loan Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Debt service coverage ratio per the pricing model. + xml:lang="en">Amount of the tax equity per the pricing model. + + xml:lang="en">Federal Tax Incentive Type, Description + xml:lang="en">IECRE Certificate Details [Abstract] - - + xml:lang="en">Availability Of Final Notice Of Approval, Flag - + xml:lang="en">Error code data provided about the inverter. - + xml:lang="en">Description of scope of work in the Master Services Agreement. - + xml:lang="en">Power Purchase Agreement Amendment, Effective Date + xml:lang="en">Roof Slope Type + xml:lang="en">IECRE Expected Performance Data [Abstract] + xml:lang="en">Used to group information about Surety insurance related to the project or the system. + xml:lang="en">Energy generated over reporting period adjusted for the difference between measured weather conditions, e.g., irradiance and temperature, and expected weather conditions for the same period during the Typical Meteorological Year or the equivalent used to predict P50 energy generation and the expected degradation rate. + xml:lang="en">The number of additional terms allowed in the Power Purchase Agreement, beyond the initial term. For example, the PPA may allow two additional terms of five years each. The value two should be entered as an integer. + xml:lang="en">Names of counterparties to the property insurance certificate. + xml:lang="en">Names of counterparties to the Limited Liability Company Agreement. + - - + xml:lang="en">Term of Backup Operations and Maintenance contract. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Initiation date of the developer performance guarantee for the portfolio. + + xml:lang="en">Description of any exceptions to the Continuity Of Operations Agreement. + xml:lang="en">Engineering Procurement and Construction Warranty Initiation Date. + xml:lang="en">Letter of Credit, Security Term + xml:lang="en">Status report on Independent Engineer Mechanical Completion Certificate. - + xml:lang="en">Operations And Maintenance Contract, Contractor Performance Guarantee, Description - + xml:lang="en">Component Maintenance Status, Description + xml:lang="en">Permission To Operate Interconnection Approval, Effective Date + xml:lang="en">Indicates if there are exceptions to the Construction Contractor Notice of Certification. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Expiration date of the Closing Indemnity Agreement. + xml:lang="en">Name of the fund sector, for example, commercial, retail, or municipal. + xml:lang="en">Identifier for Site Lease Agreement. - + xml:lang="en">Availability Of Final Operations And Maintenance Manual, Flag + xml:lang="en">Insurance, Per Occurrence Requirement, Description - + xml:lang="en">Availability Of Exceptions To The Operations And Maintenance Contract, Flag - + xml:lang="en">Name of the company responsible for preparing the Environmental Assessment I. + xml:lang="en">Items on the Independent Engineering Services Checklist regarding equipment warranties. + xml:lang="en">Information about the Operations Manager. + xml:lang="en">Cultural Resource [Abstract] + xml:lang="en">Identifier for Appraisal. + xml:lang="en">Liability Insurance Certificate, Effective Date + + xml:lang="en">Maintenance cost of inverter under warranty. + + + xml:lang="en">Module Factory Audit Report Exceptions, Description + xml:lang="en">Inverter Input Battery Number Of Batteries Per Inverter + + + xml:lang="en">Operations Manager Reporting, Description + xml:lang="en">Link to the Funding Memo document. + + xml:lang="en">Reason For Maintenance Ticket, Description + + xml:lang="en">Engineering, Procurement And Construction Agreement, Special Features, Description + + + xml:lang="en">Developer Engineering Procurement and Construction Warranty Strategy, Description + xml:lang="en">Entity Is Operations And Maintenance Contractor, Flag + xml:lang="en">Term of the Monitoring Contract between the project company and engineering company to monitor system performance. The value should be entered using the ISO8601 format of PnY or PnM. For example, a 5 year term would be represented as P5Y, a 3 month term as P3M. + xml:lang="en">Number of times per year vegetation is tended. - + xml:lang="en">Independent Engineering Services Checklist Review By Contractor [Member] + xml:lang="en">Expiration date of the Investment Memo. + xml:lang="en">Description of warranty management in the Monthly Operating Report + + xml:lang="en">Used to group information about permit actions related to a cultural resource on a site. + xml:lang="en">Used to identify individual reports used to monitor the ongoing performance of the installation. - + xml:lang="en">Amount of the pro forma initial insurance cost. - + xml:lang="en">Period for which the cash distribution is made, for example the month of January, or the 2nd quarter. + xml:lang="en">Identifier for the Sponsor in the fund. + + - + xml:lang="en">Indicates if there is a cross default pool for the Limited Liability Company Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Component Maintenance Cost (No Equipment Warranty) Signage, Amount + + xml:lang="en">Expiration date of the Invoice Including Wiring Instructions. + - + xml:lang="en">Amount of sponsor capital contribution from developer. + xml:lang="en">Optimizer Weighted Efficiency, Percent + xml:lang="en">Indicates if the Invoice Including Wiring Instructions is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of the methodology used to calculate the performance ratio which could be IECRE or another method. + xml:lang="en">Indicates if there is portfolio level debt. If there is debt, TRUE; if there is no debt, FALSE. + xml:lang="en">Module Level Power Electronics Has Optimization, Flag + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Operations and Maintenance - Time & Materials or Other Work. + xml:lang="en">Indicates if the Tax Indemnity Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. - + xml:lang="en">Expected monthly deferred Income Tax Credit. + xml:lang="en">Base stipulated loss value, which is the gross amount that the investor needs to be paid to be made whole, if there is an early termination of the lease, e.g., the equipment is destroyed. - - + xml:lang="en">Site Property Geotechnical Location, URI + xml:lang="en">Independent Engineering Opinion Report, Link + xml:lang="en">Number of tracker controllers which are electronic devices that directs the tracker. + xml:lang="en">Date when the power System has been interconnected and is ready to generate power. This is often used for funding purposes. + - + xml:lang="en">Entity Authorized To View Security Data, Email And Phone - + xml:lang="en">Identifier for Qualifying Facilities Self Certification. + xml:lang="en">Monthly Operating Report Income Statement [Abstract] - + xml:lang="en">Preparer Of Site Lease Memo, Name + xml:lang="en">Actual amount of renewable energy credit. + xml:lang="en">Availability Of Exceptions To The Commitment Agreement, Flag + - + xml:lang="en">Details about the solar energy calculation model. + xml:lang="en">Fund Bank Role, Description + xml:lang="en">Used to group information about Environmental Impact Reports related to the site. + xml:lang="en">Value of the voltage when module is operating at maximum power. May also be called Maximum Power Voltage. - + xml:lang="en">Identifier for Module Factory Audit Report. + xml:lang="en">Availability Of Equity Contribution Guarantee, Flag - - + xml:lang="en">Counterparties To The Master Lessee Security Agreement, Names + xml:lang="en">Link to the Interconnection Approval document. + xml:lang="en">The period during which the guaranteed production of the system in kWhs is calculated. For example, the amount is guaranteed over a period of a month or year. + xml:lang="en">Bank Sending Wire, Name + + xml:lang="en">Availability Of Final Permission To Operate Interconnection Approval, Flag + xml:lang="en">Availability Of Final Tax Indemnity Agreement, Flag + xml:lang="en">System Modules, Total Number + + xml:lang="en">Availability Of Final Security Agreement Supplement, Flag + xml:lang="en">Notice Of Approval Exceptions, Description + xml:lang="en">Information about the forecast and actual performance of the project. + xml:lang="en">Names of counterparties to the Master Purchase Agreement. - + xml:lang="en">Site Control [Line Items] + xml:lang="en">Pricing Model [Abstract] + xml:lang="en">Regulatory FERC203, Flag + xml:lang="en">Availability Of Final Independent Engineering Opinion Report, Flag + xml:lang="en">Environmental Site Assessment II [Abstract] + xml:lang="en">Partnership Flip, Date + xml:lang="en">Investment Memo Exceptions, Description + xml:lang="en">Credit Support, Term - + xml:lang="en">Module Has Certification IEC60364-4-41, Flag + xml:lang="en">Indicates if California Rule 21 was the source requirement document (SRD) for the tests. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Description of the Recognized Environmental Condition in the Environmental Site Assessment II report. + + xml:lang="en">Pricing Model, Total Upfront Capitalized Fees, Amount + xml:lang="en">Used as the identifier for Security Interest. + xml:lang="en">Counterparties To The Easement Report, Names + xml:lang="en">Expiration date of the Continuity Of Operations Agreement. + xml:lang="en">Description of the asset manager reporting plan, for example monthly operating reports, establishing a reporting portal. + xml:lang="en">Date on which the Partnership Flip or group of Partnership Flips is set to expire, in CCYY-MM-DD format. - - + xml:lang="en">Availability Of Operating Agreements For Master Lessee, Lessee And Operator, Flag + xml:lang="en">Parent Company, Child Company, Type - + xml:lang="en">Indicates if the entity or counterparty is a PPA Offtaker; if it is, TRUE; if it is not, FALSE. - + xml:lang="en">Engineering, Procurement And Construction Agreement, Customer + xml:lang="en">Debt-to-Income (DTI) Ratio, Percent + xml:lang="en">Description of the energy forecasting and settlement capabiities and tools of the operations manager. + xml:lang="en">Moodys credit rating of the entity. + xml:lang="en">Expiration date of the Lessee Collateral Agency Agreement. + xml:lang="en">Gen Tie Line, Length + xml:lang="en">Used to group information about Casualty insurance related to the project or the system. + xml:lang="en">Measured Energy Weather Adjustment Method, Description + + xml:lang="en">Solar Array Inverters Connected To Array, Number + xml:lang="en">Expiration date of the Notice of Commercial Operation. + xml:lang="en">Indicates if there are exceptions to the independent engineering opinion report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Indicates if there are exceptions to the Equipment Warranties or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Indicates if the Substantial Completion Certificate is available. If it is available, TRUE; if it is not available, FALSE. + - + xml:lang="en">Availability Of Final Project Administration Agreement, Flag - + xml:lang="en">Tax Indemnity Agreement, Link + + xml:lang="en">Effective date of the liability insurance certificate. + xml:lang="en">Module Materials & Workmanship Warranty, Initiation Date - + xml:lang="en">Indicates if credit support is for the Interconnection Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">IECRE Letter Of Credit Details [Abstract] + xml:lang="en">Effective date of the Operations and Maintenance agreement. - + xml:lang="en">Tax Equity Provider Contribution, Amount + xml:lang="en">Energy Contract Hourly Rate, Hour 3 [Member] + xml:lang="en">Description of the cultural resource item identified. - - + xml:lang="en">Preparer Of Breakage Fee Side Letter Agreement, Name + xml:lang="en">Computed average insolation, for the period defined on the PeriodAxis over all years of operation since activation date in kWh/square meter. To record the average insolation for Q1 for example this element would be used with the PeriodFirstQuarterMember on the Period Axis. If the period axis is not used this represents the insolation over the entire life of the project from activation date up to the contextual date. + xml:lang="en">Document Identifier, Individual Contractor Document + xlink:from="solar_SiteLicenseAgreementEffectiveDate" + xlink:to="label_solar_SiteLicenseAgreementEffectiveDate" + xlink:type="arc"/> + xml:lang="en">Site License Agreement, Effective Date + + xml:lang="en">Component To Be Repaired, Name + + xml:lang="en">Represents information related to an Environmental Site Assessment. There may be multiple assessments related to a site with information collected on name of preparer, description, phase, and link to the report. + xml:lang="en">Description of any exceptions to the Closing Certificate or issues raised. + xml:lang="en">Document Identifier, Shared Facility Agreement + xml:lang="en">Rate of the performance based incentive in amount per kWh. + + xml:lang="en">Master Purchase Agreement, Commitment Period, Start Date + xml:lang="en">Site Control Host Email and Phone + xml:lang="en">Rebate Payment Timing, Description + xml:lang="en">Major Reported Event + xml:lang="en">Information about the Site Lease Assignment for the project. + xml:lang="en">Cost of the Data Acquisition System license. + xml:lang="en">Description of the climate classification of the site per IECRE 60721. For example: Tropical, Arid, Temperate, Cold, Polar. + xml:lang="en">Project Distributed Generation Portolio Or Utility Scale - - + xml:lang="en">Financial Lease Schedule, Link + xml:lang="en">Indicates if there are exceptions to the Hedge Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Operations Manager Insurance Policy Management, Description - + xml:lang="en">Identifier for Certificate Of Final Completion. + xml:lang="en">Monitoring Contract, Link + xml:lang="en">County Of Installation + xml:lang="en">Utility Rate Name, Applicable Dates + - - + xml:lang="en">Information about regulatory aspects of the system. + xml:lang="en">Incentive Type - + xml:lang="en">Operational Events And Issues Reporting [Line Items] + xml:lang="en">Identifier for Component Status Report. + + xml:lang="en">Tax Preparation Fee Per Watt + xml:lang="en">Availability Of Mechanical Completion Certificate, Flag + xml:lang="en">Indicates if bird population conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Description of the developers past experience with project development and construction. + xml:lang="en">Identifier for Assignment Of Interest. + xml:lang="en">Indicates if the Operator Guarantee is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Closing Certificate, Link + xml:lang="en">Availability Of Monthly Operating Report, Flag + xml:lang="en">Indicates if the project is entitled to a state tax credit. If it is entitled, TRUE; if it is not, FALSE. + xml:lang="en">Preparer Of Exposure Report, Name + xml:lang="en">Mechanical Completion, Date + xml:lang="en">Module Junction Box Rating, Description + xml:lang="en">Represents the time period of the month of May. Used for this month of any year. + xml:lang="en">Pledge Agreement, Link + xml:lang="en">Entity Is Other, Flag + xml:lang="en">Battery Inverter, Number + xml:lang="en">Site Lease Access Agreement, Term + + + xml:lang="en">Nominal Operating Condition [Member] + + - + xml:lang="en">Confirmation of the availability of the Workmanship Warranty per the Engineering Procurement and Construction Agreement. If available, TRUE; if not available, FALSE. + xml:lang="en">Special Purpose Vehicle, Bank Internal Code + + + xml:lang="en">Inverter Input Battery Peak Power DC, Amount + xml:lang="en">Data Acquisition System or (DAQ) is the collection of tools used to collect operational data associated with the solar installation. A DAQ consists of both software and hardware. + xml:lang="en">Document Identifier, Incumbency Certificate + xml:lang="en">Installation Agreement, Link - - - + xml:lang="en">Other Equipment Due Diligence Reports, Expiration Date + xml:lang="en">Site Control Access Agreement Counterparty + xml:lang="en">Device Identifier [Axis] + xml:lang="en">Effective date of the Closing Indemnity Agreement. + xml:lang="en">Indicates if there are exceptions to the Financial Lease Schedule or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Name of the company responsible for preparing the Casualty Insurance Policy. + xml:lang="en">Workers Compensation Insurance [Table] + xml:lang="en">Independent Engineering Report Exceptions, Description + xml:lang="en">Appraised Value [Table] + xml:lang="en">Fund Details [Line Items] + - + xml:lang="en">Confirmation of receipt of Public Utilities Commission (PUC) approval. If approved, TRUE; if not approved, FALSE. + xml:lang="en">Insurance Consultant Report, Expiration Date + xml:lang="en">Power Purchase Agreement, Total Upfront Payment, Amount + xml:lang="en">Maintenance cost of Medium Voltage with no warranty. + + + xml:lang="en">Name for loss factor, for example soiling loss, snow loss, shading loss. - + xml:lang="en">Master Lease, Fund Company or Master Lessee + xml:lang="en">Other Tax Expense Benefit Per Watt + xml:lang="en">Battery Inverter, AC Power Rating + xml:lang="en">Completion Of VPN Connection To SCADA [Member] - + xml:lang="en">Indicates if the zoning permit requires system removal at the end of the term. If system removal is required, TRUE; if not required, FALSE. + xml:lang="en">Effective pre tax equivalent terminal internal rate of return per the pricing model. + xml:lang="en">Site, Name + + xml:lang="en">Supplemental Report Review Of Insurance Review [Abstract] - - + xml:lang="en">Information about the pro forma modeling. + xml:lang="en">Used to group information about Universal insurance related to the project or the system. + xml:lang="en">Inverter Has Certification UL1741 Supplement A, Flag + + xml:lang="en">Title Survey [Abstract] + + + xml:lang="en">Identifier for an appraisal performed on a site. + xml:lang="en">Product Identifier, Battery Inverter [Abstract] + xml:lang="en">One Year In Plane Assumed Irradiation + - + xml:lang="en">Effective date of the Mechanical Completion Certificate. + xml:lang="en">Entity Standard & Poors Credit Rating + xml:lang="en">Surety Legal Jurisdiction, Description + xml:lang="en">Primary Operations And Maintenance Subcontractor, Email + + xml:lang="en">Name and title of contact for Data Acquisition System. + xml:lang="en">Information about Accounts Receivable Aging included in the monthly operating report. + xml:lang="en">Operations And Maintenance Contract, Commencement Date + xml:lang="en">Renewable Energy Credit Contract Performance Guarantee, Initiation Date + xml:lang="en">Secondary Operations and Maintenance Subcontractor Address + xml:lang="en">Federal tax identification number for the Operations Manager. + xml:lang="en">Qualifying Facilities Self Certification [Abstract] + xml:lang="en">Indicates whether ACH payment capability has been set up; if it has, TRUE; if it has not, FALSE. + xml:lang="en">Partnership Flip Counterparty Type, Description + xml:lang="en">Number of rows of cells on a module. + xml:lang="en">Equipment Onboarding [Abstract] + xml:lang="en">SWIFT Code - + xml:lang="en">Indicates if there are exceptions to the UCC Security Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - - + xml:lang="en">Power Purchase Agreement, Additional Term, Duration + xml:lang="en">Used as the identifier for the Cost Segregation. + xml:lang="en">Identifier for Incumbency Certificate. - + xml:lang="en">Preparer Of Investment Memo, Name - - + xml:lang="en">Renewable Energy Credit Contract Volume Cap, Power - + xml:lang="en">Nominal Pre Tax Equivalent Terminal Internal Rate of Return (IRR) per the pricing model. + xml:lang="en">Expiration date of the Environmental Site Assessment I. + + xml:lang="en">Description of the operations manager performance guarantees. + xml:lang="en">Availability Of Exceptions To The Lessee Security Agreement, Flag + + + xml:lang="en">Document Identifier, Qualifying Facilities Self Certification + + xml:lang="en">Type of reserve collateral which could be cash or letter of credit. - + xml:lang="en">Status of the approval condition or follow up request, for example open or closed. - + xml:lang="en">Information about the dimensions of the revenue meter. + xml:lang="en">Used as the identifier for the Environmental Site Assessment. + xml:lang="en">System Performance Power Measures [Abstract] + xml:lang="en">Asset Manager Identifier + + xml:lang="en">System Quality Level, Description - - + xml:lang="en">Inverter Output, AC Voltage Range Minimum, Amount + xml:lang="en">Actual degradation rate of the system, in percent of kWh lost. + xml:lang="en">Indicates if the Term Loan is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Zoning Permit, Site Restoration Required, Flag + xml:lang="en">Amount of the initial monthly lease payment. + xml:lang="en">Preparer Of Hedge Agreement, Name + + xml:lang="en">Asset Manager Continuity of Asset Program, Description + xml:lang="en">Value of the surety bond. + xml:lang="en">Lessee Security Agreement Exceptions, Description + + xml:lang="en">Information specific to Meter products that are used in the system. + xml:lang="en">Master Lease, Liability Insurance Provider Required AM Best Size Rating - - + xml:lang="en">Assignment Of Interest, Effective Date + xml:lang="en">Name of the company responsible for preparing the Workers Compensation Insurance Policy. + xml:lang="en">Energy Contract, Hourly Rate [Domain] + + + xml:lang="en">Availability Of Exceptions To The Independent Engineering Report, Flag - + xml:lang="en">OffTaker Email + xml:lang="en">Indicates if the Environmental Site Assessment II is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + - - + xml:lang="en">Indicates if there are exceptions to the Operations Manual or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + xml:lang="en">Operational Issues, Date And Time Production Stopped + xml:lang="en">Other Equipment Due Diligence Reports Exceptions, Description + xml:lang="en">Expiration date of the Renewable Energy Credit Buyer Acknowledgement. + xml:lang="en">Percentage of kWh lost due to atmospheric aerosol particles, including water vapor or fog, smoke from wildfires or agricultural burning, and air pollution due to urban proximity of system, for a typical meteorological year, calculation based on major design/energy production model used. - - + xml:lang="en">Description of reserve structure. + xml:lang="en">Name of the company responsible for preparing the Construction Loan Agreement. + xml:lang="en">Availability Of Final Membership Interest Purchase Agreement, Flag + xml:lang="en">Description of the contribution made, for example, Bank contributed 45% of funds for initial funding of XYZ project. + xml:lang="en">Description of any exceptions to the Master Lessee Security Agreement or issues raised. + xml:lang="en">Description of fund investment focus (for example, renewable only, contracted cash flows only), competitive advantage, and project drop-down expectations which describes the plans for the long term equity of the project. - + xml:lang="en">Power Purchase Agreement, Location To Send Invoices, Address + xml:lang="en">Asset Manager [Abstract] - + xml:lang="en">Description of other material ongoing obligations. + xml:lang="en">Identifier for the System (plant). + xml:lang="en">Entity Information [Abstract] + xml:lang="en">Actual measured insolation generated in kWh per square meter for a specific duration of time. This is used to measure the insolation from one date to another date. This differs from the element SystemPerformanceMeasuredInsolationAverage which is used to measure system performance from activation date to the current date and can be reported by dividing by periods such as months and quarters or years. - + xml:lang="en">Energy Production Estimate Contribution From Solar Resource Assessment [Member] + xml:lang="en">Represents the total outstanding balance for customer accounts that are past due between 31 and 60 days. + xml:lang="en">Ambient temperature used for the target conditions for the capacity measurement using IEC 61724-2. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. - - + xml:lang="en">Status Report Of Independent Engineering Substantial Completion Certificate [Member] + xml:lang="en">Target Balance [Line Items] - - + xml:lang="en">Indicates if the Term Sheet is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Interest rate charged on overdue lease payments. + + xml:lang="en">Effective date of the Security Agreement Supplement. + xml:lang="en">Availability of Funding Proposal Request, Flag + xml:lang="en">Power Purchase Agreement, Purchaser Option To Purchase, Description + xml:lang="en">Amount of current federal tax expense (benefit) pertaining to income (loss) from continuing operations. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + + xml:lang="en">Description of any exceptions to the Term Sheet or issues raised. + + xml:lang="en">Information about the equipment manufacturer. + xml:lang="en">Communications expense which is typically the monthly telephone bill. + xml:lang="en">DC Disconnect Switch [Member] + + xml:lang="en">Represents 02:00 in 24 hour military time, 2:00 am. on the am/pm 12 hour clock. + + xml:lang="en">Date of the Power Purchase Agreement invoice. + xml:lang="en">Utility Electricity Expense, Amount + xml:lang="en">Financial Transaction For System [Abstract] + + - + xml:lang="en">Component Maintenance Cost (Under Warranty) Operations And Maintenance Cost Building, Amount - + xml:lang="en">Items on the Independent Engineering Services Checklist regarding site review. + xml:lang="en">Counterparties To The Security Agreement Supplement, Names + xml:lang="en">Indicates if the Advisor Invoices is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability Of Closing Indemnity Agreement, Flag - + xml:lang="en">Actual operating expenses divided by expected operating expenses from inception to date. + xml:lang="en">Independent Engineering Services Checklist Operational Budget Review [Member] - + xml:lang="en">Document Identifier, Washing And Waste Management Agreement - + xml:lang="en">Description of any exceptions to the Membership Certificate of Lessee or issues raised. - - + xml:lang="en">Component Maintenance Cost (Under Warranty) Substation, Amount + xml:lang="en">Information about the Income Statement included in the monthly operating report. - + xml:lang="en">Used as the identifier for the Appraisal. + xml:lang="en">Liability Insurance Certificate, Link + xml:lang="en">Table used to represent cash distributions made to various types of investors. + + + xml:lang="en">Site Latitude At System Entrance + xml:lang="en">Indicates if the Approval Notice is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Information about IECRE certificates. + xml:lang="en">Review Of Module Lab Testing [Member] + xml:lang="en">Energy Production Estimate Of Independent Engineer [Member] + xml:lang="en">Link to the Equipment Warranties document. + xml:lang="en">Full legal name of a third party. + xml:lang="en">Availability Of Exceptions To The Letter Of Credit, Flag + xml:lang="en">Partner shares as percent of class equity, for example,class A and class B shares. The ratio can be can be expressed for all partners or for individual partners. + xml:lang="en">Expiration date of the Certificate of Formation for Master Lessee, Lessee and Operator. + + xml:lang="en">Indicates if pollen conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Loss Factor Identifier [Axis] + xml:lang="en">Description of the location of water hookups at the system. + xml:lang="en">Site Control, Description + xml:lang="en">Liability Insurance Certificate Exceptions, Description + xml:lang="en">Availability Of Renewable Energy Credit Offtake Agreement, Flag + - + xml:lang="en">Warranties Review Communication Infrastructure [Member] + xml:lang="en">Insurance, Expiration Date + + + xml:lang="en">Document Identifier, Pricing File + xml:lang="en">Power Purchase Agreement, Invoices, Billing Contact + xml:lang="en">Accounts Receivable Aging [Table] - - + xml:lang="en">Lessee Collateral Agency Agreement, Link + xml:lang="en">Tracker Capacity, Power + xml:lang="en">Indication of component failure. If component has failed, TRUE. If component has not failed, FALSE. - + xml:lang="en">Renumeration Type, Description - + xml:lang="en">Operations And Maintenance Contract, Counterparty + xml:lang="en">Identifier for the Developer. + + + xml:lang="en">Preparer Of Performance Guarantee Agreement, Name + xml:lang="en">Description of the type of financing event, for example, an origination request, signing a non-binding commitment, signing a binding committment, signing and closing, closing, or funding. - - + xml:lang="en">Description of host purchase option terms. + xml:lang="en">Indication as to whether phase data has been collected. If data has been collected, TRUE; if data has not been collected, FALSE. + xml:lang="en">Information about the Closing Certificate for the project which documents that the project has been funded and includes supporting information about the lease. + xml:lang="en">Information about Property Insurance. + xml:lang="en">System Entity [Line Items] - + xml:lang="en">Credit Support Obligor, SPV Identifier - + xml:lang="en">Document Identifier, Construction Monitoring Report + xml:lang="en">Host Acknowledgement, Effective Date + xml:lang="en">Initial Funding Date + xml:lang="en">Indicates if there are exceptions to the Commitment Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Indicates that the fund has construction financing. If the fund does have construction financing, TRUE. If it does not, FALSE. + + + xml:lang="en">Description of a major event that happened during the period related to the operations of the project. + xml:lang="en">Represents information about the approvals for a financing event which may include identifier for the financing event to which the approval applies, type of approval (for example for solar project finance, credit or special purpose entity), status of the approval request and date that final approval was received. + xml:lang="en">Expiration date of the Project Administration Agreement. + xml:lang="en">Indicates if the module is Building Integrated PV, which means that photovoltaic materials are used to replace conventional building materials in parts of the building envelope such as the roof, skylights, or facades. + xml:lang="en">Device Warranty [Abstract] + xml:lang="en">Indicates if the notice of approval is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Name of the company responsible for preparing the UCC Precautionary Lease Filing. + xml:lang="en">Represents the time period of the month of January. Used for this month of any year. + xml:lang="en">Represents information about a fund including name, identifier, status (committed, open, closed), sponsor identification, size in megawatts and monetary value, as well characteristics of the fund such as whether the fund has wind, solar or storage projects, construction financing or back leverage. - + xml:lang="en">Independent Engineering Services Checklist Permits And Assessment Review [Member] + xml:lang="en">Description of the meter display type, for example, LCD, digital, cyclometer. + xml:lang="en">Availability Of Exceptions To The Security Agreement Supplement, Flag - + xml:lang="en">Availability Of Final Host Acknowledgement, Flag - - - + xml:lang="en">Cultural Resource Identifier [Line Items] + xml:lang="en">Information about agreement identifiers for contracts supported by security. + xml:lang="en">Description of special features of the site. + xml:lang="en">Indicates if the Incumbency Certificate is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Used to group a listing of information about the Cost Segregation. + xml:lang="en">Expiration date of the guarantee. + xml:lang="en">Test Condition Air Mass + xml:lang="en">Description of the surety bond form used which can include the name of the form and version number. For example, a form provided by the Association of General Contractors or ACORD. - + xml:lang="en">Engineering, Procurement And Construction Agreement, Workmanship Warranty, Term - - + xml:lang="en">Partnership Flip, P95 Flip Date + xml:lang="en">Cultural Resource Study, Link + xml:lang="en">Indicates if there is a cross default pool for the Membership Interest Purchase Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">System Entity Flag + xml:lang="en">Operations Manager Outsourcing Plan, Description + xml:lang="en">Pro Forma, Initial Insurance Cost, Amount + xml:lang="en">Fund Type, Description + + + xml:lang="en">Used to identify information about the Power Purchase Agreement. + xml:lang="en">Emergency or Construction Curtailment Model Factor, Amount + xml:lang="en">Used as the identifier for a permit action related to a cultural resource. - - - + xml:lang="en">Information about seasonal model factors that are reported by month, by quarter or by year. + xml:lang="en">Names of counterparties to the Wiring Instructions. - - + xml:lang="en">Site Control Required Access Notice, Description + xml:lang="en">Operations Manager Identifier [Axis] + + xml:lang="en">Information about a Hedge Agreement. - + xml:lang="en">PV System Performance Sampling Internal + xml:lang="en">ISO country code where system is located. - + xml:lang="en">Axis for reporting multiple entities that are associated with the installation. Each typed member represents the UUID of a specific entity. + xml:lang="en">Power Purchase Agreement, True-up Timing + + + + + xml:lang="en">Average nominal operating cell temperature. + xml:lang="en">Status of the title policy, which may be Not applicable, Not issued, Pro Forma, or Final. + xml:lang="en">Washing Water Cost, Amount Per Gallon + + xml:lang="en">Revenue Meter Phase, Description + + + xml:lang="en">Portfolio Used in Fund, Flag + xml:lang="en">Link to the Supplemental Report Review Of Insurance Review document. + xml:lang="en">Expiration date of the sponsor performance guarantee per the Operator Performance Guarantee. + xml:lang="en">Inverter equipment. + + + xml:lang="en">Revenue Meter Dimensions, Length + xml:lang="en">Line Items used to link a system entity with a given system or to identify the entities associated with a given system. + xml:lang="en">Used as the identifier for the Site. + xml:lang="en">Document Identifier, Appraisal + xml:lang="en">Operational budget review of consumables List. + xml:lang="en">Document Identifier, UCC Precautionary Lease Filing + xml:lang="en">Description of the material used on the back cover of the module. + xml:lang="en">Name of the company responsible for preparing the Financial Lease Schedule. + xml:lang="en">Meter [Member] + + + xml:lang="en">Portion of site used to measure performance based incentive as percent of total number of units in site. + xml:lang="en">Approval Identifier + + + xml:lang="en">Used to group a listing of information about Credit Support Amount. + xml:lang="en">Indicates if there are exceptions to the Construction Monitoring Report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Represents the time period of 1 month. This can be any month of any year. Used to indicate that an amount is a monthly amount. i.e. the rent is $1000 a month. + xml:lang="en">Indicates if the Lessee Security Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Independent Engineering Report, Expiration Date + xml:lang="en">Link to the Easement document. + xml:lang="en">Purchase price of project. + xml:lang="en">Device Listing, Serial Number + xml:lang="en">Primary Operations and Maintenance Contract, Subcontractor + xml:lang="en">Document Identifier, Environmental Assessment II + xml:lang="en">Description of federal tax incentive indemnity type per the Tax Indemnity Agreement. + xml:lang="en">The estimated or actual value of the asset at the end of its useful life or when it is no longer serviceable (cannot be used for its original purpose). Value should be reported as amount per watt, and should be used with the IECREPredictedVersusActualAxis. + + xml:lang="en">Entity Web Site URL + xml:lang="en">Effective date of the Power Purchase Agreement. + xml:lang="en">Names of counterparties to the Permission To Operate Interconnection Approval. + xml:lang="en">Expected completion date of the Punch List. + xml:lang="en">Preparer Of Building Inspection, Name + xml:lang="en">Preparer Of Electrical Inspection, Name - - + xml:lang="en">Availability Of Lessee Claim Documents, Flag + xml:lang="en">Security Interest in Individual Contractor Agreement, Flag + + xml:lang="en">Represents information about a specific employee which can include whether they are associated with a fund or project, plus the identifier for that fund or project, their role and level. + xml:lang="en">Indicates if there are exceptions to the Certificate of Formation for Master Lessee, Lessee and Operator or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Zoning Permit Documents [Axis] + + xml:lang="en">Indicates if there are exceptions to the Master Services Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Off-taker Credit Performance [Abstract] + + + xml:lang="en">Security Email and Phone + xml:lang="en">Optimizer MPPT Operating Range Maximum, Amount + + xml:lang="en">Used to identify maintenance events that may occur related to a components in a system. - + xml:lang="en">Periodic Budget, Number for the Period + xml:lang="en">Document Identifier, Commitment Agreement - - + xml:lang="en">Identifier for Letter Of Credit Agreement. + + + xml:lang="en">Counterparties To The Membership Interest Purchase Agreement, Names + xml:lang="en">Indicates if there are exceptions to the Easement Report or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Credit Support for Limited Liability Company Agreement, Flag + xml:lang="en">Operations Projects Manager Owned to Third Party Owned, Percent + xml:lang="en">Guaranteed volume of energy in kWh to be delivered by the project company under the terms of the Performace Based Incentive Contract. + + xml:lang="en">Information about parent company relationships. + xml:lang="en">Inverter has certification UL1741, for Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Resources. + xml:lang="en">Fee for auditing financial information. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Transmission Report And Curtailment Estimate Report Exceptions, Description + xml:lang="en">Percentage stake of the parent company in the child company. + + - + xml:lang="en">Availability Of Final Board Resolution For Master Lessee, Lessee and Operator, Flag + xml:lang="en">Appraisal, Expiration Date - + xml:lang="en">Certificate Of Completion Exceptions, Description + xml:lang="en">Description of material non-routine maintenance in the Monthly Operating Report + xml:lang="en">Supply Agreements [Abstract] + xml:lang="en">Third Party Engagement, Hiring Entity + xml:lang="en">Parent Company Identifier [Axis] + xml:lang="en">Period in which the degradation amount or percent is estimated, in 'PnYnMnDTnHnMnS' format, for example, 'P1Y5M13D' represents reported fact of one year, five months, and thirteen days, or 'P1Y' represents a reported fact for one year, or 'P1M' represents a reported fact for one month. Should be used with the EstimationPeriodStartDateAxis which represents the starting date for the period. + + xml:lang="en">Revenue from rebates from federal and state governments. + + + xml:lang="en">Name and title of contact for SCADA (Supervisory Control & Data Acquisition) system. - + xml:lang="en">Expected Energy Available Excluding Times Of External Or Other Outages, Energy + xml:lang="en">Availability Of Bill Of Sale, Flag + xml:lang="en">Lease Execution, Date + + xml:lang="en">Other Material Ongoing Obligations, Description + xml:lang="en">Availability Of Construction Loan Agreement, Flag + + xml:lang="en">Membership Certificate Of Lessee, Expiration Date + + xml:lang="en">Names of counterparties to the Assignment and Assumption Agreement. + xml:lang="en">Availability Of Final Site Lease Assignment, Flag + xml:lang="en">Equipment Review Medium Voltage Transformers [Member] + xml:lang="en">Indicates if there is security interest in the Lease Schedule. If it is, TRUE; if it is not, FALSE. - - - - - - - - - + xml:lang="en">Availability Of Final Assignment Of Interest, Flag + xml:lang="en">Expiration date of the Operator Guarantee. + xml:lang="en">Information about other permits. + xml:lang="en">Description of the structure of the Renewable Energy Credit contract. - + xml:lang="en">Estimated System Degradation Rate, Percent + xml:lang="en">Security Interest Receiver, Name + xml:lang="en">Electrical Power Test, End Date Time Stamp + xml:lang="en">Permission To Operate Interconnection Approval, Link - - + xml:lang="en">Deficit Restoration Obligation Limit, Amount + xml:lang="en">Performance Based Incentive Payment Method, Description + xml:lang="en">Entity Address 1 - - + xml:lang="en">Document Identifier, UCC Tax, Lien and Judgment Lien Searches - - + xml:lang="en">Name of the governing authority that issued the permit for the cultural resource. + xml:lang="en">Information about the Transmission Report and Curtailment Estimate for the project. + xml:lang="en">Name of the company responsible for preparing the Membership Interest Purchase Agreement. - + xml:lang="en">City where equipment manufacturer is located. - + xml:lang="en">Preparer Of Closing Certificate, Name - + xml:lang="en">Model First Year Module Degradation Loss, Amount + xml:lang="en">IECRE Financing Event [Abstract] - + xml:lang="en">Supplemental Report Review Of Local Tax Review [Member] + xml:lang="en">Employee Role Identifier [Axis] + xml:lang="en">Names of counterparties to the independent engineering opinion report. + xml:lang="en">Predicted Energy Available, Energy + xml:lang="en">Comment About Major Reported Event + xml:lang="en">Module Level Power Electronics Has Monitoring, Flag + xml:lang="en">Primary Operations And Maintenance Subcontractor Contact, Name and Title + xml:lang="en">Comments On Maintenance Ticket + xml:lang="en">Document Identifier, IECRE Certificate + xml:lang="en">Closing Certificate, Expiration Date - - - - + xml:lang="en">Description of developer insurance requirements. + xml:lang="en">Amount of the required periodic payments applied to principal. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Amount of Renewable Energy Credits sold to off-taker when electricity sold to off taker includes the Renewable Energy Credits so the off taker can take advantage of the credit. + xml:lang="en">Availability Of Exceptions To The Site Lease Access Agreement, Flag - + xml:lang="en">Nubmer of systems in the portfolio. + xml:lang="en">Identifier for the closing documents for an individual financing event. - + xml:lang="en">Operations Manual, Expiration Date + xml:lang="en">In the event of an early buyout, earliest date at which the buyout can occur; can have multiple projects so this would be associated with a project + + + xml:lang="en">Information about the system during the onboarding process. + - + xml:lang="en">Security Interests, Asset Secured Type + xml:lang="en">Effective date of the Assignment of Interest. + xml:lang="en">Description of variance from expectations contained in the agreement related to the action. + + xml:lang="en">Inverter Downtime, Number Of Hours, Inception To Date + + xml:lang="en">Indicates if there is a cross default pool for the Master Lease Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Measured Energy Availability, Percent + + xml:lang="en">Monthly Operating Report Cash Distribution [Table] + + + xml:lang="en">Items on the Independent Engineering Services Checklist regarding review of substantial or final completion. + xml:lang="en">Indicates if the Renewable Energy Credit Buyer Acknowledgement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Effective date of the Building Inspection. - - + xml:lang="en">Effective date of the Supplemental Report Review Of Local Tax Review. + xml:lang="en">First line address where entity is based. + xml:lang="en">Name of tax equity partner. - - + xml:lang="en">Accounts Receivable Aging Balance Past Due 1 To 30 Days [Member] + xml:lang="en">Combiner [Member] + + xml:lang="en">Counterparties To The Operating Agreements For Master Lessee, Lessee And Operator, Names + xml:lang="en">Component Maintenance Cost (No Warranty) Data Acquisition System, Amount + xml:lang="en">Information about the portfolio. + xml:lang="en">Counterparties To The Funding Proposal Request, Names + xml:lang="en">Document Identifier, Independent Engineering Opinion Report + xml:lang="en">Optimizer Rated Input Power + xml:lang="en">Amount of DC input measured in power which is voltage times current. + + + xml:lang="en">Power Purchase Agreement, Contract Expiration, Date + + xml:lang="en">Notice Of Approval [Abstract] + xml:lang="en">Zoning Permit, Credit Required, Flag + xml:lang="en">Represents a Rate Class in the logical model that allows multiple instances of rates. + xml:lang="en">Number of meteorogical stations. + xml:lang="en">Pricing Model, Investment Tax Credit, Grant Basis, Amount + xml:lang="en">Payment method for the Asset Management Contract. + xml:lang="en">Secondary Operations and Maintenance Subcontractor, Name + xml:lang="en">Name of the company responsible for preparing the Guarantee Agreement. + + xml:lang="en">Renewable energy credit percentage of site based on units defined as REC portion units (the portion of the units on a site which are eligible for the REC). + xml:lang="en">Telecommunications expense. + + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Decommissioning. + xml:lang="en">Identifier for the natural resource permit. - - + xml:lang="en">Expected auditing expense. + + + xml:lang="en">Qualifying Facilities Self Certification Exceptions, Description + xml:lang="en">Identifier for the source of funds for an individual financing event. + xml:lang="en">Represents 22:00 in 24 hour military time, 10:00 pm. on the am/pm 12 hour clock. - - + xml:lang="en">Transmission Report And Curtailment Estimate, Link + xml:lang="en">Initiation date of the performance based incentive term. + xml:lang="en">Performance Guarantee, Exclusions Description of the Renewable Energy Credit contract performance guarantee. - - + xml:lang="en">Renewable Energy Credit Contract, Portion of Units, Description + xml:lang="en">Description of the escrow account ability to access SCADA documentation per the Continuity of Operations Agreement. + xml:lang="en">Partnership Flip, P95 Flip Period + + xml:lang="en">Cost of Funds, Amount - + xml:lang="en">Description of the operations manager continuity of operations program. + xml:lang="en">Document Identifier, Vegetation Management Agreement - + xml:lang="en">Monitoring Solution Software, Version + xml:lang="en">Number of units used to measure power system capacity for Power Purchase Agreement. + xml:lang="en">Mounting Type + + xml:lang="en">Financial Transaction For Fund, Counterparty Name + xml:lang="en">Cost of module testing. + xml:lang="en">Power Purchase Agreement, Contract Initiation, Date + xml:lang="en">Duration of the time period associated with the component maintenance cost. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Indicates the nature of interconnection which can be behind the meter, virtual net meter or in front of the meter. + + xml:lang="en">Name of the seller (developer) in the Master Purchase Agreement which covers the agreement of the developer to sell the assets to the investor. + xml:lang="en">Equipment Manufacturer Details Address Country + xml:lang="en">System Performance [Abstract] + xml:lang="en">Co Tenancy Agreement, Effective Date + xml:lang="en">Minimum Output Guaranteed, Percent + xml:lang="en">Indicates if the Host Acknowledgement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Financial Contract For System [Abstract] + + xml:lang="en">Document Identifier, Estoppel Certificate Power Purchase Agreement + + xml:lang="en">Measurement class per IEC 71724 where Class A is highest and Class C is lowest. + xml:lang="en">Indicates if the Invoice Including Wiring Instructions is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Surety Principal + xml:lang="en">Link to the Insurance Consultant Report document. + + + xml:lang="en">Secondary Operations and Maintenance Subcontractor, Email - + xml:lang="en">Operations And Maintenance Continuity Agreement Key Terms, Description + xml:lang="en">Identifier for Local Incentive Contract. + xml:lang="en">Document Identifier, Sales Leaseback Contract For Project + + + xml:lang="en">PPA Contract Review Considered, Flag + xml:lang="en">Date of contract initiation of long-term contract to purchase electricity from a production system. (Asset mgmt and transaction/trade), e.g., could be the same as PPA Effective Date. + xml:lang="en">Peak apparent power that can be drawn into the battery for the inverter. + xml:lang="en">Indicates if the Title Survey is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Funding, Date + xml:lang="en">Name of the company responsible for preparing the Environmental Assessment II. + xml:lang="en">Description of the reference associated with the wired funds. + xml:lang="en">Availability Of Final Construction Monitoring Report, Flag + - + xml:lang="en">Energy Loss Due to Issue, Amount + + xml:lang="en">Name of contractor on the Operations and Maintenance contract. + xml:lang="en">Aerosol Model Factor, Typical Met Month, Percent - + xml:lang="en">Contractors review of part of the Independent Engineer Report covering other topic areas. + xml:lang="en">Used as the identifier for the appraised value. + xml:lang="en">Security Interest in Site Lease Agreement, Flag + + + xml:lang="en">Counterparties To The UCC Security Agreement, Names + xml:lang="en">IECRE Report Review [Abstract] + + xml:lang="en">Independent Engineering Services Checklist Design Review [Member] + xml:lang="en">Title Policy Insurance, Status + xml:lang="en">Product Details [Line Items] + xml:lang="en">Washing Equipment Rental Expense, Amount - - - + xml:lang="en">Cross Default Pool for Site Lease Agreement, Flag - - + xml:lang="en">Project Working Capital Account Prefunded, Amount + xml:lang="en">Availability Of Exceptions To The UCC Tax Lien and Judgment Lien Searches, Flag + xml:lang="en">Project Performance [Table] + xml:lang="en">Counterparties To The Local Incentive Contract, Names + xml:lang="en">Invested Capital Per Watt + xml:lang="en">Name of the company responsible for preparing the Assignment And Assumption Agreement. + + + xml:lang="en">Project Schedule Number + xml:lang="en">Expiration date of the Operating Agreements for Master Lessee, Lessee and Operator. + + - + xml:lang="en">Document Identifier, Liability Insurance Policy + xml:lang="en">Custom test condition created with specified attributes for air mass, ambient temperature, cell temperature, irradiance and wind speed. + + xml:lang="en">Energy Ratio And Yield [Abstract] + xml:lang="en">Final Completion, Date + xml:lang="en">Amount of the contribution made. + xml:lang="en">Component Maintenance Cost, Associated Time Period - + xml:lang="en">Used to group information about a study conducted about a cultural resource on a site. + xml:lang="en">Lease Bank Identifier For Lessee + xml:lang="en">Invoicing date of the Asset Management Contract. + xml:lang="en">Contract Review Asset Management [Member] - + xml:lang="en">Availability Of Final Interconnection Approval, Flag + xml:lang="en">Average Power Purchase Agreement Term + xml:lang="en">Array, Number Of SubArrays + xml:lang="en">Availability Of Interconnection Agreement, Flag + xml:lang="en">Document Identifier, Operating Agreements For Master Lessee, Lessee And Operator + xml:lang="en">Developer Project Performance Guarantee [Abstract] + xml:lang="en">PV Installation Labor Cost, Amounts + xml:lang="en">Identifier for an individual piece of equipment used in a system, for example, ABC Brand inverter with serial number xxxx. + + + + + + xml:lang="en">Availability Of Final Easement Report, Flag + + + xml:lang="en">Expiration date of the Renewable Energy Credit Offtake Agreement. + + xml:lang="en">Information about the project. + + xml:lang="en">Maximum amount of current that an inverter will output, AC. + xml:lang="en">Site Longitude At System Entrance + xml:lang="en">Minimum power factor when injecting reactive power. + xml:lang="en">County where the entity is based. + + xml:lang="en">PV AC Rating, Power + xml:lang="en">Host Acknowledgement, Expiration Date + + xml:lang="en">Expected P50 Insolation, Inception To Date - - + xml:lang="en">Used as identifier for other permits. + + + xml:lang="en">Weight of the module. + xml:lang="en">Security Interest in Hedge Agreement, Flag + + xml:lang="en">Component Maintenance Cost (Under Warranty) Wiring Conduit, Amount + + + xml:lang="en">First name of the employee. + xml:lang="en">Pricing Model, Nominal Pre Tax Equivalent Internal Rate Of Return, Percent + + xml:lang="en">Appraisal Input, Weighted Average Cost of Capital, Percent + xml:lang="en">Availability Of Exceptions To The Notice Of Approval, Flag + xml:lang="en">Equity Contribution Guarantee, Link + xml:lang="en">Amount of security per the Letter of Credit. + xml:lang="en">Security Agreement Supplement, Expiration Date + xml:lang="en">Description of routine preventative maintenance in the Monthly Operating Report + + xml:lang="en">SCADA System, IP Address + xml:lang="en">Pricing Model, Holdback Final Completion Payment, Amount + xml:lang="en">Actual To Expected Revenue Based Incentives, Inception To Date, Percent + xml:lang="en">Represents information about the roles of third party organizations involved in a fund. - + xml:lang="en">Component Maintenance Cost (No Warranty) Met Station, Amount + xml:lang="en">Address for security guard company. + + + xml:lang="en">Insurance, Beneficiary Name - - + xml:lang="en">Information about zoning permits and zoning covenants for a site. + xml:lang="en">Indicates if the site needs to be restored at the end of the term. If the site needs to be restored, TRUE; if not required, FALSE. + xml:lang="en">Amount of the required periodic payments applied to interest. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Jurisdiction of the counterparty in the partnership flip, for example, name of the state. + xml:lang="en">Name of the company responsible for preparing the Developer Portfolio Performance Guarantee Agreement. + + xml:lang="en">Effective date of the Tax Opinion. + xml:lang="en">Period of time during which the target balance applies. + xml:lang="en">Date after which there can be no escalation in the lease payment. + xml:lang="en">Identifier for Lessee Security Agreement. + - - + xml:lang="en">Used to group information about project performance. - + xml:lang="en">Indicates if there are exceptions to the Monitoring Contract. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + xml:lang="en">Portfolio, Number Of Systems + + xml:lang="en">Information about post-close activities. + + + + xml:lang="en">Date of the appraisal of the home. + xml:lang="en">Insurance Consultant Report, Effective Date + xml:lang="en">Used as the identifier for the Project. + + xml:lang="en">Continuity of Operations Agreement, Backup Asset Management Contract Counterparty - + xml:lang="en">Names of counterparties to the Term Loan. + xml:lang="en">Number of solar panels or modules in an array. + xml:lang="en">Identifier for Construction Loan Agreement. + xml:lang="en">Name of lessor of the site where the system is located. + xml:lang="en">Product Identifier, Optimizer [Abstract] + + xml:lang="en">Operations Manager Spare Parts Strategy, Description - + xml:lang="en">Date when the advisor opinion was written. - + xml:lang="en">Measured Energy To Measured Energy Plus Lost Energy, Ratio + xml:lang="en">Indicates if there is security interest in the Membership Interest Purchase Agreement. If it is, TRUE; if it is not, FALSE. + + xml:lang="en">Description of any exceptions to the module factory audit report. - - + xml:lang="en">Description of action required by the cultural resources permit, for example, a fee or covenant. + xml:lang="en">Table containing data about letters of credit for the system that may be needed for an IECRE certificate. + xml:lang="en">Financial Transaction For Fund [Abstract] + xml:lang="en">Universally unique identifier for the site. + xml:lang="en">Surety Obligee, Name + xml:lang="en">Availability Of Final Term Sheet, Flag + xml:lang="en">Building Inspection Exceptions, Description - + xml:lang="en">Description of post-close punch list items. + xml:lang="en">Description of the amount of watts needed to start the revenue meter, for example less 5 Watts, per manufacturer specification. + xml:lang="en">Description of the other service offerings available from the asset manager. + xml:lang="en">Security Interest in Term Loan Agreement, Flag + xml:lang="en">Permitting Fees at installation. + xml:lang="en">Preparer Of Operator Guarantee, Name + xml:lang="en">Counterparties To The Renewable Energy Credit Offtake Agreement, Names + xml:lang="en">Used to identify classes of reserves used to finance a solar installation which can be for the fund or the project. + xml:lang="en">Limited Liability Company Agreement, List Of Member Entities + xml:lang="en">Inverter Has DC Disconnect Device, Flag + xml:lang="en">Document Identifier, Easement Report + + xml:lang="en">Exposure Report, Expiration Date + xml:lang="en">Availability Of Exceptions To The Insurance Consultant Report, Flag - - + xml:lang="en">Name of the company responsible for preparing the LLCA Agreement. - - + xml:lang="en">Power Purchase Agreement, Additional Term, Number + xml:lang="en">Surety Insurance [Line Items] + + xml:lang="en">Actual cost of penalties for low performance during period of the capacity test in currency/kWdc. + xml:lang="en">Information about regulatory aspects of the project used. + xml:lang="en">Indicates if the Incentive Assignment is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of jurisdiction and governing law that pertains to the lease. + xml:lang="en">Names of counterparties to the Environmental Site Assessment II. + xml:lang="en">Incentives [Abstract] + xml:lang="en">Financial Model Review Of Expenses [Member] + xml:lang="en">Construction Loan Agreement [Abstract] + xml:lang="en">Indicates if the Asset Management Contract is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Names of counterparties to the Co Tenancy Agreement. + xml:lang="en">Availability Of Final Certificate Of Acceptance Report, Flag + + xml:lang="en">Name of failed component. + + + + xml:lang="en">Availability Of Final Pledge Agreement, Flag + xml:lang="en">Financial Transaction For Fund, Invoice Line Item, Description + + xml:lang="en">Funding Memo, Link - - + xml:lang="en">Test condition measurement is performed using Nominal Operating Conditions which include the following constraints: cell temperature = 45; wind speed = 1; air mass = 1.5; irradiance = 800; ambient temperature = 25. + + xml:lang="en">Indicates if the Operations and Maintenance Manual is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Identifier for Installation Agreement. + xml:lang="en">Pricing File Exceptions, Description - - + xml:lang="en">Independent Engineering Services Checklist [Line Items] + xml:lang="en">Represents information about the performance of a project. + + xml:lang="en">Use of Reserve + xml:lang="en">Availability Of Final Site Lease Memo, Flag + xml:lang="en">Preparer Of Renewable Energy Credit Buyer Acknowledgement, Name + xml:lang="en">Letter Of Credit [Table] + + + xml:lang="en">End date for the period of the credit support amount. + xml:lang="en">Indicates if the Monthly Operating Report is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Appraisal Cost Approach, Flag + xml:lang="en">UCC Precautionary Lease Filing, Expiration Date + xml:lang="en">Developer Portfolio Performance Guarantee, Expiration Date + + + xml:lang="en">Financing Event, First Financing Entity, Email + xml:lang="en">Indicates if the lien waiver is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Property Insurance Hurricane And Wind Requirement, Description + + + xml:lang="en">Term of the performance guarantee. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Date at which the installation obtains Placed in Service (PIS) status.This is used for tax purposes and means the system has met the following: (1) It is synched with the grid, (2) it has no major outstanding permits, (3) it has or is capable of commencing delivery of energy to the grid, (4) care, custody and control has been transferred to the operator, (5) critical tests are complete, for example, those required by the EPC and interconnection agreements. + + + xml:lang="en">Effective date of the Shared Facility Agreement. + xml:lang="en">Information about the Continuity of Operations. + xml:lang="en">Represents information related to a Financing Event such as an origination request, funding, or closing. Events can be related to a fund or a project and can include type of event, the date and description. + xml:lang="en">Review By Contractor Of Other Topics [Member] + xml:lang="en">Description of any exceptions to the Easement or issues raised. + + xml:lang="en">Availability Of Wiring Instructions, Flag + xml:lang="en">Lease Amount Payable, Amount + xml:lang="en">Indicates if there is security interest in the Individual Contractor Agreement. If it is, TRUE; if it is not, FALSE. + + xml:lang="en">Data Acquisition System Documentation URI, Link + xml:lang="en">Availability Of Final Funding Proposal Request, Flag - + xml:lang="en">Indicates if there is security interest in the Site Permit Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Partnership Flip Counterparty, Address + + + xml:lang="en">Indication as to whether the system allows for grid charging. + xml:lang="en">Document Identifier, Security Contract + xml:lang="en">Cash payments to lessor's for use of assets under operating leases. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Module Reliability Testing Degradation Rate Characterization Test Report [Member] + + xml:lang="en">Identifier for a specific financing-related event, for example, an origination request, signing a non-binding commitment, signing a binding commitment, signing and closing, closing, or funding. + xml:lang="en">Expiration date of the Advisor Invoices. + xml:lang="en">Site Property Other Expenses [Abstract] + xml:lang="en">Expected Energy At Revenue Meter, Inception To Date, Amount + xml:lang="en">Description of the operations manager workflow process and ticketing system. + xml:lang="en">Represents the time period of the month of June. Used for this month of any year. + xml:lang="en">Operational Issues, Acknowledgement Time + xml:lang="en">Items on the Independent Engineering Services Checklist regarding Module Reliability Testing. - + xml:lang="en">Measured Energy, Amount + xml:lang="en">Indicates if the inverter is Grid Support Utility Interactive. If it is, TRUE; if it is not, FALSE. + + + xml:lang="en">Zoning Permit, System Removal Required, Flag + xml:lang="en">Board Resolution For Master Lessee, Lessee and Operator [Abstract] + xml:lang="en">Guarantees [Abstract] + xml:lang="en">Description of Site Control. - - + xml:lang="en">Fitch credit rating of the entity. - - + xml:lang="en">Limited Liability Company Agreement Exceptions, Description - - + xml:lang="en">Parasitic Loss Measured In Test - + xml:lang="en">Shading Model Factor, Typical Met Year, Percent + xml:lang="en">UCC Precautionary Lease Filing, Effective Date + xml:lang="en">Effective date of the UCC Security Agreement. + xml:lang="en">Issues During Construction, Other Technical Issues, Description + xml:lang="en">Preparer Of Incumbency Certificate, Name + xml:lang="en">Term Loan Exceptions, Description + xml:lang="en">Counterparties To The Project Administration Agreement, Names + xml:lang="en">Parent Guarantee, Obligor + xml:lang="en">Size of the banks investment in the entity. + xml:lang="en">Preparer Of Independent Engineering Report, Name - - + xml:lang="en">Financial model (pro forma) review of revenue. + + xml:lang="en">Security Interest in Site Permit, Flag - - + xml:lang="en">Information about a component + xml:lang="en">Site [Abstract] - + xml:lang="en">Engineering, Procurement And Construction Agreement, Scope Of Work, Description + + xml:lang="en">Entity [Axis] [No Default] + xml:lang="en">Inverter Cut Sheet, Notes + xml:lang="en">Letter Of Credit Exceptions, Description + + + xml:lang="en">System Performance Energy Measures [Abstract] + xml:lang="en">A sub array is a PV surface unit made up of the same types of module mounted together and set at the same angle and orientation. + xml:lang="en">Width of the revenue meter. + xml:lang="en">Letter of Credit, Security, Provider Email Address - - - + xml:lang="en">Name of the person or entity authorized to access security data about the system. - + xml:lang="en">Link to the Interconnection Agreement document. + xml:lang="en">Description of sponsor reporting requirements. + xml:lang="en">Preparer Of Credit Report Documents, Name + xml:lang="en">Amount of payments generated by the project company. + xml:lang="en">Expected annualized loss due to low irradiance based on major design/energy production model used. + - + xml:lang="en">Document Identifier, Equity Contribution Agreement + xml:lang="en">Link to the Term Sheet document. + xml:lang="en">Counterparties To The Independent Engineering Report, Names + xml:lang="en">Indicates if the cut sheet is revised. If it is revised, TRUE; if is not revised, FALSE. - + xml:lang="en">Amount of current going through the cell, module or string when the voltage is zero. + xml:lang="en">Installation Type [Table] + xml:lang="en">Developer Reporting Requirements, Description + xml:lang="en">Asset Manager Supply Strategy, Description + xml:lang="en">Description of the style of the inverter which can be Central, String, MicroInverter, Distributed, Transformerless, or Grounded. + xml:lang="en">Expected energy in DC kWh produced at the array. This element should be used with the PeriodAxis to indicate the period of measurement. + xml:lang="en">Cost of data monitoring and hosting + + xml:lang="en">Real Estate Tax Expense Per Watt + xml:lang="en">Amount of current state and local tax expense (benefit) pertaining to income (loss) from continuing operations. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Identifier for LLC Registration. - + xml:lang="en">Information about financial performance ratios. - + xml:lang="en">Effective date of the Incumbency Certificate, which names individuals at the bank who are allowed to execute docs on behalf of the project company. + xml:lang="en">Jurisdiction of the counterparty in the sale leaseback, for example, name of the state. + + + + xml:lang="en">Bank account number for the reserve. + + xml:lang="en">Name of the company responsible for preparing the UCC Security Agreement. + xml:lang="en">Air mass during the test condition. + + xml:lang="en">Lien Waiver, Effective Date + xml:lang="en">Natural Resource Identifier + + + xml:lang="en">Effective date of the Certificate of Final Completion. + xml:lang="en">Identifier for Certificate Of Acceptance Report. + xml:lang="en">Amount of continuous DC power that can be drawn into the battery for the inverter, in apparent power. + xml:lang="en">Cultural Resource Study, Preparer + xml:lang="en">Independent Engineering Services Checklist Equipment Review [Member] + xml:lang="en">Financial Contract For System, UpFront Purchase, Amount + + + xml:lang="en">Value of project at end of its economic useful life per the pricing model. + xml:lang="en">Indicates if the Site Lease Access Agreement is available. If it is available, TRUE; if it is not available, FALSE. + + + xml:lang="en">Document Identifier, Limited Liability Company Document + xml:lang="en">Date of the FICO score for an OffTaker. + + xml:lang="en">Operations Manual, Effective Date + xml:lang="en">Energy Budget Phase, Description + + xml:lang="en">Credit Support Beneficiary, SPV Identifier + + + xml:lang="en">Master Lease, Owner Participant - + xml:lang="en">Identifier for Surety Bond Policy Insurance Policy. + xml:lang="en">Power Purchase Agreement, Availability Of Site Lease Agreement + xml:lang="en">Information about the Notice of Commercial Operations Date for the project. + xml:lang="en">Counterparties To The Title Survey, Names + xml:lang="en">Name of the company responsible for preparing the Site License Agreement. - - - - + xml:lang="en">Insurance, Policy Owner + xml:lang="en">Surety Electronic Bond, Verification Number + xml:lang="en">Major Reported Event, Date - + xml:lang="en">Information about the appraisal. + xml:lang="en">Document Identifier, Punch List + xml:lang="en">Easement Report, Effective Date - + xml:lang="en">Description of any exceptions to the Bill of Sale for the installation or issues raised. + xml:lang="en">Measured efficiency under test conditions equal to California Energy Commission (CEC) test conditions. - + xml:lang="en">Number of states where Asset manager operates. - - + xml:lang="en">Approval Memo [Table] + xml:lang="en">Sale Leaseback Counterparty Type, Description + xml:lang="en">Information about the letter of credit documents. + xml:lang="en">Length of Gen Tie Line (interconnecting power line). + xml:lang="en">Availability Of Exceptions To The Local Incentive Contract, Flag + xml:lang="en">The vendor code in the bank's internal systems. + xml:lang="en">Names of counterparties to the Hedge Agreement. + xml:lang="en">The latitude of the system at the system entrance. The value should be entered in decimal degrees. + xml:lang="en">Description of requirements to access the site. + + xml:lang="en">Amount of water needed for washing in gallons. + xml:lang="en">FICO Method, Description + xml:lang="en">Amount of revenue and income classified as other. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Energy Charge, Amount - + xml:lang="en">Lien Waiver, Expiration Date + xml:lang="en">Confirmation of the availability of the Interconnection Agreement in the Engineering, Procurement and Construction Agreement Agreement. If available, TRUE; if not available, FALSE. + + + + xml:lang="en">Plant availability in percent. + + + - + xml:lang="en">Indicates if the Site Lease Memo is available. If it is available, TRUE; if it is not available, FALSE. - + xml:lang="en">Breakage Fee Agreement Exceptions, Description + xml:lang="en">Design And Construction Documents [Abstract] + xml:lang="en">Identifier for Site Permit - - + xml:lang="en">Name of the company responsible for preparing the Engineering Services Checklist. + xml:lang="en">Availability Of Exceptions To The Financial Lease Schedule, Flag + xml:lang="en">Amount of tare power lost at night at 40 degrees celsius. Tare losses are a measure of the energy the inverter consumes to power its internal electronics and magnetics. + xml:lang="en">Indicates if there are exceptions to the Design and Construction Documents or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">GeoLocation at Entrance to System + xml:lang="en">Energy Budget Details [Line Items] + xml:lang="en">Indicates if there is security interest in the Site Lease Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Description of any exceptions to the Assignment and Assumption Agreement or issues raised. + xml:lang="en">Name of the guarantor in the Parent Guarantee, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. + + + xml:lang="en">Letter of Credit, Security Type, Description + + + xml:lang="en">Information related to the Power Purchase Agreement. - + xml:lang="en">Underwriting Structure [Abstract] + + + xml:lang="en">Engineering, Procurement and Construction Contractor, Name - + xml:lang="en">Contract Review Preventative Maintenance [Member] + xml:lang="en">Number of hours of inverter downtime. + xml:lang="en">Minimum operating temperature of the solar module. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + + + xml:lang="en">Availability Of Exceptions To The Title Survey, Flag + xml:lang="en">Identifier for the beneficiary which is an SPV. + xml:lang="en">Document Identifier, Site Lease Document + xml:lang="en">Module Power Tolerance Range Maximum, Percent + xml:lang="en">Cultural Resource Study [Axis] + xml:lang="en">Indicates if the Environmental Impact Report is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Effective date of the Equipment Warranties. + xml:lang="en">Security Interests, Type + xml:lang="en">Indicates if the Master Lessee Security Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Represents names of components that are undergoing maintenance. + xml:lang="en">Address for Power Purchase Agreement off taker. + - + xml:lang="en">Indication as to whether the inverter has a ground fault monitoring; if it does, TRUE; if it does not, FALSE. + + + xml:lang="en">Indicates if the Site Lease Assignment is available. If it is available, TRUE; if it is not available, FALSE. - + xml:lang="en">Funds Flow [Abstract] + xml:lang="en">Information about the Security Agreement Supplement. + xml:lang="en">Availability Of Construction Monitoring Report, Flag + xml:lang="en">Breakage Fee Agreement, Date - - - + xml:lang="en">Lien Waiver, Link + xml:lang="en">Recipient of the Independent Engineering Production Estimate, Name + xml:lang="en">Link to the Equity Contribution document. + xml:lang="en">Link to the Independent Engineering Opinion Report document. + xml:lang="en">Pledge Agreement, Link + xml:lang="en">Availability Of Exceptions To The Operations And Maintenance Agreement, Flag + - + xml:lang="en">Description of the zoning covenant / obligation. - - + xml:lang="en">Expected Auditing Expense, Amount + xml:lang="en">Indicates if the Environmental Site Assessment II is available. If it is available, TRUE; if it is not available, FALSE. + - - + xml:lang="en">Developer Identifier + xml:lang="en">Name of the company responsible for preparing the Supplemental Report Review Of Local Tax Review. + xml:lang="en">Minimum amount of cash on hand allowable by the investor in the Parent guarantee, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. - + xml:lang="en">Name of the company responsible for preparing the Component Status Report. + xml:lang="en">Information about the Membership Certificate of Lessee for the project. + + + xml:lang="en">Power Purchase Agreement Contract Details [Line Items] + xml:lang="en">Financial Performance [Abstract] + xml:lang="en">Preparer Of Wiring Instructions, Name - + xml:lang="en">Regulatory FERC205, Flag + + - + xml:lang="en">Certificates Of Insurance [Abstract] + xml:lang="en">Site Property Location Of Keys, Description + xml:lang="en">The total invested capital at the end of the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Asset Management Contract, Rate Per Power Unit - + xml:lang="en">Indicates if there are exceptions to the Permission To Operate Interconnection Approval or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Electricity Cost, Amount Per Power + xml:lang="en">Represents 19:00 in 24 hour military time, 7:00 pm. on the am/pm 12 hour clock. - + xml:lang="en">Description of type of entity who engaged the third party, for example, Sponsor, Fund, Bank. - - + xml:lang="en">Asset Management Contract Subcontractor Scope of Work, Description + + xml:lang="en">Module Testing Expense, Amount - + xml:lang="en">Type of design model when the model is changed which could be Pvsyst, SAM, PV Watts, or Other. + xml:lang="en">Percent increase escalation per year of the renewable energy credit price. + xml:lang="en">Term of the Backup Asset Management Contract. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">URI location where PDF of site photos are stored. + xml:lang="en">Cultural Resource Identifier [Axis] + xml:lang="en">Zoning Covenants [Table] + + + xml:lang="en">Approval Notice, Expiration Date + xml:lang="en">Email address for the provider of the letter of credit. + xml:lang="en">Regulatory FERC205 Application Approval Notice, Link + xml:lang="en">Supply Agreements [Table] - - + xml:lang="en">Maximum amount of renewable energy that can be sold over a specified time period in MWh per the Renewable Energy Credit Contract, which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">Indicates if the Closing Indemnity Agreement is available. If it is available, TRUE; if it is not available, FALSE. + + + + xml:lang="en">Indicates if the Incumbency Certificate is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Operations Manager Preventative and Corrective Maintenance, Description - Expiration date of the Supply Agreements. + + + + + + xml:lang="en">DC Capacity in STC + xml:lang="en">Indicates if the Membership Interest Purchase Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Name of the interconnection provider (utility) per the Interconnection Agreement, allowing the project company to distribute energy onto the electrical grid. + xml:lang="en">Amount of the base lease payment, initial payment prior to escalation. + xml:lang="en">Jurisdiction for the bond which is usually identified in the contract, to be used to determine where a case would be brought in the event of a dispute. + + + xml:lang="en">Appraised Value System, Cost Method, Amount + xml:lang="en">Engineering, Procurement and Construction Warranty, Expiration Date + xml:lang="en">Maximum payment that can be made during a reconciliation period. + xml:lang="en">Appraised Value System, Income Method, Amount - - - + xml:lang="en">Continuity of Operations Agreement, Backup Operations and Maintenance Upfront Mobilization Fee, Amount + xml:lang="en">Names of counterparties to the Incumbency Certificate. - + xml:lang="en">Measured Insolation To P50 Insolation, Inception To Date, Percent + xml:lang="en">Indicates if the Environmental Site Assessment I is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Status Report Of Independent Engineering Mechanical Completion Certificate [Member] - + xml:lang="en">Tax Equity Provider Contribution, Amount + xml:lang="en">Number of fault codes generated by inverters. + - + xml:lang="en">Maintenance cost of balance of system (BOS) under warranty. + xml:lang="en">Financial Lease Schedule, Expiration Date + xml:lang="en">Inverter Indication of Reverse Polarity, Flag - + xml:lang="en">Modules Per String, Number + xml:lang="en">Description of any exceptions to the Operator Guarantee or issues raised. + xml:lang="en">Letter of Credit, Purpose - + xml:lang="en">Description of any exceptions to the Local Incentive Contract or issues raised. - - + xml:lang="en">Energy Production Estimate Contribution From Losses [Member] + + + xml:lang="en">Identifier for Operational Issues Report. + xml:lang="en">Document Identifier, Property Insurance Certificate Agreement + xml:lang="en">The amount of time to reach the plant by a service technician or a subcontractor when the visit by the O&M contractor is contractually necessary, from the moment of acknowledgement. Intervention Time assesses the capacity of the O&M Contractor to mobilize and be on site. The value should be entered as a durationItemType using the ISO8601 format of PnYnMnDTnHnMnS, where H means hours, M means minutes, and S means seconds. + + xml:lang="en">Site inspections on-site or remote, Photographic (desktop)/Remote Inspection at Final Completion. + xml:lang="en">Permits and assessments review of Conditional Use permit including decommissioning requirement if any. + + xml:lang="en">Interconnection Agreement Exceptions, Description + xml:lang="en">Preparer Of Incentive Assignment, Name + xml:lang="en">Exception is made to the passing of the Functional (Availability) Test. - - + xml:lang="en">Developer Funding Technology Experience, Description + xml:lang="en">The Investment Tax Credit-eligible basis for the plant. - + xml:lang="en">Indicates if the Title Survey is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability Of Notice Of Commercial Operations Date, Flag + xml:lang="en">Used to identify the type of insurance, which may be surety, casualty, property, or other types. - - - + xml:lang="en">0 + xml:lang="en">Link to the Master Purchase Agreement document. + + xml:lang="en">Rate in currency per kWh of the Monitoring Contract between the project company and engineering company to monitor system performance. - + xml:lang="en">Effective date of the Interconnection Approval. + xml:lang="en">Operational Event Reporting [Axis] [No Default] - + xml:lang="en">Measurement Class, Description + xml:lang="en">Component Maintenance Cost (No Warranty) Wiring Conduit, Amount + xml:lang="en">Indicates if the Certificate of Final Completion is available. If it is available, TRUE; if it is not available, FALSE. + + + xml:lang="en">Environmental Impact Report Exceptions, Description - + xml:lang="en">Last Payment, Date + xml:lang="en">Cost of outstanding items on the Punch List. + xml:lang="en">Preparer Of Property Insurance Certificate Agreement, Name + xml:lang="en">Indicates if there are exceptions to the Electrical Inspection or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Guarantee Term + xml:lang="en">Availability Of LCC Registration, Flag + + + xml:lang="en">Information about the Invoice Including Wiring Instructions for the project. + xml:lang="en">Interconnection Agreement, Link + + xml:lang="en">Indicates if the zoning permit can be renewed at the end of the term. If it can be renewed, TRUE; if it cannot be renewed, FALSE. + xml:lang="en">Total number of payments made to date in the Power Purchase Agreement or lease. + + xml:lang="en">Availability Of Invoice Including Wiring Instructions, Flag + xml:lang="en">Information about the SCADA System. + xml:lang="en">System Expected Commercial Operations, Date - + xml:lang="en">Appraisal Input, Investment Tax Credit for System, Amount - - + xml:lang="en">Module Temperature Coefficient Short Circuit Current + xml:lang="en">Appraised Value, Valuation Point + xml:lang="en">Annual percent degradation of system performance. - + xml:lang="en">Reason for the maintenance ticket written regarding a component related to the system. + xml:lang="en">Annual PV plant performance certificate - link to certificate, plus other report characteristics. + xml:lang="en">Indicates if there are exceptions to the Site License Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - - + xml:lang="en">Amount of power that can be delivered continuously by the inverter. - - + xml:lang="en">Noteable event that happened within the last year. - + xml:lang="en">Used to represent information about letters of credit for a system that may be needed for an IECRE certificate. + + + xml:lang="en">Used to group information about the Loss Factor. + xml:lang="en">Asset Management Expense, Expected, Amount + xml:lang="en">Web site of the product or equipment manufacturer. + xml:lang="en">Availability Of Final Mechanical Completion Certificate, Flag - + xml:lang="en">Site Address Country + xml:lang="en">Identifier for the SPV which is a grantee. + xml:lang="en">Information about the liability insurance certificate. + xml:lang="en">Lessee Claim Documents, Expiration Date + xml:lang="en">Entity Size Value, Amount - + xml:lang="en">Email and phone number of the host (owner) of the site. + xml:lang="en">Address of the counterparty + xml:lang="en">Description of reporting required by managing member per the Limited Liability Company Agreement. + + + + xml:lang="en">Letter Of Credit, Form Version + + + xml:lang="en">Indication if snow is considered in the design model. If it is considered in the design model, TRUE; if it is not considered in the design model, FALSE. + + + xml:lang="en">Warranties Review Meteorological Station [Member] + + + xml:lang="en">Power Purchase Agreement expected revenue generated. + xml:lang="en">Site Property Appraisal, URI + + xml:lang="en">Indicates if there are exceptions to the Limited Liability Company Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Standards Applicable, Description + xml:lang="en">Availability Of Electrical Inspection, Flag + + xml:lang="en">Operational Budget Review Of Other Operations [Member] + xml:lang="en">Effective date of the Certificate Of Completion. + xml:lang="en">System Details [Line Items] + xml:lang="en">Entity Address [Abstract] + xml:lang="en">Description of any exceptions to the Permission To Operate Interconnection Approval or issues raised. + xml:lang="en">Utilities Cost Per Watt + xml:lang="en">Description of the approval condition and possible follow up. + + xml:lang="en">Division of State Architect Approval, Status + + + + xml:lang="en">Appraisal Input, Investment Tax Credit Basis for System, Percent + xml:lang="en">Availability Of Exceptions To The Easement Report, Flag + + + + + xml:lang="en">Indicates if the UCC Tax Lien and Judgment Lien Searches are available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">State where the entity is based. + xml:lang="en">Energy production estimate contribution from PAN file creation or confirmation contribution from validation (module) in kWh. - + xml:lang="en">Local Incentive Contract, Description + xml:lang="en">Deficit Restoration, Obligation Per Watt + xml:lang="en">Commitment Agreement, Effective Date - - + xml:lang="en">System Nameplate [Abstract] + xml:lang="en">Power Purchase Agreement, Payment Deadline, Date + xml:lang="en">Fund Comment, Description + + xml:lang="en">Initiation date of the developer performance guarantee for the project. + xml:lang="en">Product Certification Number + xml:lang="en">Name of the company responsible for preparing the Certificate Of Final Completion. + xml:lang="en">Names of counterparties to the Easement Report. + xml:lang="en">Preparer Of Environmental Assessment I, Name + + + xml:lang="en">Represents information about actions taken related to a permit for a natural resource which is associated with a specific site. Data reported may include a link to the permit, identifier, authority issuing the permit. + + + xml:lang="en">Link to the Master Lease document. + xml:lang="en">Description of Flood Requirement in Property Insurance + xml:lang="en">Substantial Completion Of Construction [Member] + xml:lang="en">Period Of Applicable Distribution - - + xml:lang="en">URI location where PDF of site appraisal is stored. + + xml:lang="en">Identifier for UCC Tax, Lien and Judgment Lien Searches. + + + xml:lang="en">Counterparties To The Bill Of Sale, Names + xml:lang="en">Name of the company responsible for preparing the Fund Proposal Request. + xml:lang="en">Credit Support Details [Line Items] - - - + xml:lang="en">Indicates that the operational issue is warranty related. If it is warranty related, TRUE; if it is not, FALSE + xml:lang="en">Investment Fund [Abstract] + xml:lang="en">Name of the company responsible for preparing the Title Survey. + xml:lang="en">Amount of the total fee for the engagement. + xml:lang="en">Tracker Altitude + xml:lang="en">Operations And Maintenance Contract, Fee + + xml:lang="en">Limited Liability Company Agreement, Name Of Entity Created - - + xml:lang="en">California Energy Commission (CEC) weighted energy efficiency rating of the inverter. In contrast to peak efficiency, it is a measure of average efficiency. + xml:lang="en">Site License Agreement [Abstract] + xml:lang="en">Natural Resource Identifier [Abstract] + xml:lang="en">Indication as to whether state tax credits are current. If they are current, TRUE; if they are not current, FALSE. - - + xml:lang="en">SubArray Identifier + xml:lang="en">Model Availability Loss, Amount - - + xml:lang="en">Renewable Energy Credit Performance Guarantee [Abstract] + xml:lang="en">Tax Indemnity Agreement Exceptions, Description - - - + xml:lang="en">Cost less salvage value per the pricing model. + xml:lang="en">Sponsor Group [Abstract] - + xml:lang="en">Availability Of Exceptions To The Advisor Invoices, Flag + xml:lang="en">Expiration date of the Data Acquisition System license. + + xml:lang="en">Used to group a listing of information about inverters at various power levels. + xml:lang="en">Power Purchase Agreement, Expected Revenue, Amount + xml:lang="en">Information about the Supplemental Report Review Of Local Tax Review. + xml:lang="en">Periodic Budget Details [Line Items] + xml:lang="en">Effective date of the installation agreement. + xml:lang="en">Indicates if the Investment Memo is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Height of the revenue meter. + xml:lang="en">The UTC offset for the site which is the difference in minutes from Coordinated Universal Time (UTC) . + xml:lang="en">Names of counterparties to the Module Accelerated Age Test Report. + xml:lang="en">Names of counterparties to the Shared Facility Agreement. + xml:lang="en">Availability Of Final Bill Of Sale, Flag + xml:lang="en">Document Identifier, Credit Report Documents + xml:lang="en">Energy Budget, Year 1 Capacity Factor, Percent - + xml:lang="en">Availability Of Final Closing Certificate, Flag + xml:lang="en">Module Cell Area, Area + xml:lang="en">Used as the identifier for the Reportable Environmental Condition. + xml:lang="en">Names of counterparties to the Pledge Agreement. + xml:lang="en">Indicates if credit support is for the Master Lease Agreement. If it is, TRUE; if it is not, FALSE. - - + xml:lang="en">Counterparties To The Electrical Inspection, Names - - - + xml:lang="en">Inverter Input, Maximum Voltage DC + + + xml:lang="en">Document Preparer Of Asset Management Agreement, Name + xml:lang="en">Names of counterparties to the Tax Opinion. - - + xml:lang="en">IECRE Model Factor Flag [Abstract] + xml:lang="en">Employee [Abstract] + xml:lang="en">Name of the Site Control Host Company. + xml:lang="en">Expiration date of the notice of approval. + xml:lang="en">Module, Weight + xml:lang="en">Revenue Meter Typical Watt Loss, Amount + xml:lang="en">Description of any exceptions to the Operating Agreements for Master Lessee, Lessee and Operator or issues raised. + xml:lang="en">Source of Funds Bank Funded, Flag + xml:lang="en">Identifier, name, or title of action required by the cultural resources permit. + + xml:lang="en">Availability Of Exceptions To The Building Inspection, Flag + + + xml:lang="en">Identifier for Supply Agreements. + xml:lang="en">Indicates if the Interconnection Approval is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + + xml:lang="en">Expiration date of the Master Purchase Agreement. + xml:lang="en">Identifier for Operator Performance Sponsor Guarantee Contract. + + xml:lang="en">Entity Identifier + xml:lang="en">Credit Support, Comment + + - - + xml:lang="en">Easement Report, Expiration Date + xml:lang="en">Credit Support for Site Lease Agreement, Flag + + xml:lang="en">Availability Of Final Master Purchase Agreement, Flag + xml:lang="en">Description of the Performance guarantee, which is provided by the operator or developer to guarantee a certain level of operating performance. + xml:lang="en">Pricing Model, Net Income After Tax, Amount + xml:lang="en">Identifier for Project Administration Agreement. - - + xml:lang="en">Name of the product or equipment manufacturer. + xml:lang="en">Indicates if there are exceptions to the Wiring Instructions or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Initiation date of the Asset Management Contract. + xml:lang="en">Number of cells on a module. + + xml:lang="en">Review By Contractor Of EPC High Voltage [Member] + xml:lang="en">Met Station equipment. + + + xml:lang="en">Developer Independent System Operator Experience, Description + xml:lang="en">Performance Ratio, Non Weather Corrected + + + xml:lang="en">Independent Engineering Services Checklist Site Inspections [Member] - + xml:lang="en">Used to group information about financial transactions related to a fund but not to a specific system within the fund. - + xml:lang="en">Device Listing, Firmware Version, Description - + xml:lang="en">Estimation Period For Curtailment + xml:lang="en">Operational Event Reporting [Abstract] + xml:lang="en">Maximum voltage at which the inverter can deliver its rated power - - + xml:lang="en">Availability Of Final Certificate Of Completion, Flag + + xml:lang="en">Renewable Energy Credit Offtake Agreement Exceptions, Description + xml:lang="en">Battery chemistry style which can be LiOn, Pb, or NiCad. + xml:lang="en">Counterparties To The Limited Liability Company Agreement, Names + xml:lang="en">Effective date of the Hedge Agreement. + + xml:lang="en">Data Acquisition Systems, Model Number + - + xml:lang="en">Costs of utility inspection at installation. + xml:lang="en">Actual energy performance index including times when the system is not functioning as in IEC 61724-3 Section 6.8, calculated by measured energy divided by expected energy. + xml:lang="en">Description of purpose of Letter of Credit - - + xml:lang="en">Information about the Substantial Completion Certificate which is issued by an independent engineer stating that the project has been built to plan, is free of any material issues that will threaten ongoing safety or performance, and has been tested to confirm expected performance. + xml:lang="en">Accounts Receivable Aging Balance Past Due 61 To 90 Days [Member] + xml:lang="en">Names of counterparties to the installation agreement which are the developer and the site owner. + xml:lang="en">Economic Curtailment Model Factor, Amount + - - + xml:lang="en">Information about the performance guarantee by the developer over the project. - - + xml:lang="en">Site inspections which can be on-site or remote at Mechanical Completion. + xml:lang="en">Description of the type of counterparty in the sale leaseback. For example, trust. + + xml:lang="en">Availability Of Exposure Report, Flag + xml:lang="en">Information about important dates in the system life cycle. + xml:lang="en">Environmental Impact Report, Link - + xml:lang="en">Nameplate information about the inverter. + xml:lang="en">Information about the subcontractor for the project site. + xml:lang="en">Security Interest Document Identifier [Abstract] + xml:lang="en">Names of counterparties to the Monthly Operating Report, which documents monthly statistics on insolation, energy, availability and performance. - + xml:lang="en">Surety Annual Surety Premium, Amount - + xml:lang="en">Link to the Notice Of Commercial Operation document. + xml:lang="en">Indicates if the Renewable Energy Credit Offtake Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Performance Based Incentive Term, Expiration Date + xml:lang="en">Used as an identifier for outstanding balance amounts on customer accounts at different stages of aging, for example, current, past due 30 days, past due 60 days. + xml:lang="en">Component Maintenance Cost (No Warranty) Balance of System (BOS), Amount + xml:lang="en">Indicates if the Certificate Of Completion is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Site Lease Access Agreement, Expiration Date + + xml:lang="en">Site Lease Assignment, Link - - - + xml:lang="en">Estoppel Certificate Power Purchase Agreement, Effective Date + xml:lang="en">Inverter Output, Maximum Apparent Power AC, Amount + xml:lang="en">Operations Manager Consumables Strategy, Description - - + xml:lang="en">Incentive Assignment [Abstract] + xml:lang="en">Name of first entity providing project financing. + xml:lang="en">Module Nominal Operating Cell Temperature + + xml:lang="en">Site Property Maps Location, URI + xml:lang="en">Table containing information about Surety insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + xml:lang="en">Certificates Of Insurance Exceptions, Description + xml:lang="en">Renewable Energy Credit Offtake Agreement, Effective Date + + + xml:lang="en">Pro Forma Accrual Account Deposit As Percent Of Gross Purchase Price + xml:lang="en">Identifier for Supplemental Report Review Of Insurance Review. + xml:lang="en">Lessee Security Agreement, Effective Date + + xml:lang="en">Used as the identifier for a Cross Default Pool. + xml:lang="en">Name of the project company per the Interconnection Agreement. The agreement allows the project company to distribute energy onto the electrical grid. + + xml:lang="en">Interconnection Agreement, Description - + xml:lang="en">Expiration date of the liability insurance certificate. - - - + xml:lang="en">Used to group information about title policy exclusions on a site. + xml:lang="en">Indicates if the Transmission Report and Curtailment Estimate is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + + xml:lang="en">Array Configuration [Abstract] + xml:lang="en">Continuity of Operations Agreement, Backup Asset Management Contract Term + + + xml:lang="en">Availability Of Final Wiring Instructions, Flag + xml:lang="en">Predicted active electrical production at the revenue meter for each year, based on historical weather data that is representative for the site, per IEC 61724-3. Calculated as Total Predicted Energy reflecting times of unavailability and parasitic loss. This element can be used with the PeriodAxis to indicate the period such as year and has a period type of instant to measure a point in time. If no Period [Axis] is used, the time period for the value is from the date of the value in the instance document to the end of the life of the system. + xml:lang="en">Volume cap in kWh of state tax credit. + xml:lang="en">Equipment Type Warranty, Start Date Milestone, Description + xml:lang="en">Used to group a listing of information about a Utility. + xml:lang="en">Module Front Material, Desciption + xml:lang="en">Represents information about documents related to zoning permit such as type of document and link to document. + xml:lang="en">Effective date of the Environmental Site Assessment II. - - + xml:lang="en">American Land Title Association Surveyor, Name + xml:lang="en">Natural Resource Permit, Governing Authority, Name + xml:lang="en">Document Identifier, Interconnection Agreement + + xml:lang="en">Asset Manager Projects, Number - - + xml:lang="en">Represents the current balance for customer accounts. + xml:lang="en">Energy Contract Hourly Rate, Hour 14 [Member] + xml:lang="en">Minimum value of the range within which the frequency of the inverter allows the AC to fluctuate, in herz. - + xml:lang="en">Rebate Type, Description + xml:lang="en">Information about the interconnection agreement between the project company and the utility. + xml:lang="en">Curtailment, Amount + + xml:lang="en">Link to the Invoice Including Wiring Instructions document. + + xml:lang="en">Tax Equity Provider, Name + + xml:lang="en">Represents information about inverter power levels. + + + xml:lang="en">Availability Of Final Certificate Of Formation For Master Lessee, Lessee And Operator, Flag + xml:lang="en">Period within which the guarantee must be met, for example, year or month. + - Link to a copy of operating agreement for the Legal Entity. + + + + xml:lang="en">Indicates if the Other Equipment Due Diligence Reports is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Represents the total outstanding balance for customer accounts that are past due between 1 and 30 days. + xml:lang="en">Total (all-in) yield. + xml:lang="en">Supplemental Report Review Of Local Tax Review, Effective Date + - - + xml:lang="en">Document Identifier, Business Interruption Insurance Policy Insurance Policy + xml:lang="en">Permits and assessments review of ALTA Survey. + xml:lang="en">Indicates if the report providing details of soil consistency, chemistry, site soil measurements (probing trench, probing drill, etc) has been submitted. If it has been submitted, TRUE; if it has not been submitted, FALSE + xml:lang="en">Name of the company responsible for preparing the Tax Opinion. + + xml:lang="en">Site Property Sub Type, Description + xml:lang="en">Tracker Style, Description - - + xml:lang="en">Name of the company responsible for preparing the Punch List. + xml:lang="en">Availability Of Exceptions To The Master Purchase Agreement, Flag - - - + xml:lang="en">Security Interests Grantor, SPV Identifier + xml:lang="en">Wiring Instructions, Link - - - - + xml:lang="en">Expected annualized loss due to module temperature based on major design/energy production model used. + xml:lang="en">Description of the location of the natural resource. - + xml:lang="en">Pro rata rent, which is the difference between rent payable and rent accrued during the previous rental period that is not included otherwise in section 467 balance or in base stipulated loss value. + xml:lang="en">Indicates if the Master Lease is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Execution date of the Renewable Energy Credit contract which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. - + xml:lang="en">Availability Of Final Design And Construction Documents, Flag + xml:lang="en">Used to group information about the site lease assignment document related to the site. - + xml:lang="en">Waste Expense, Amount - + xml:lang="en">Inverter Backup Power Output [Abstract] + xml:lang="en">Number of solar modules that are washed. - + xml:lang="en">Regulatory FERC203 Application, Submission Date + xml:lang="en">Pro Forma Gross Income Balance, Amount - - + xml:lang="en">Indication as to whether Division of State Architect approval is required. + xml:lang="en">Operations Manager Performance By Geography [Table] + xml:lang="en">Amount of fees in the Master Services Agreement. + + xml:lang="en">Indicates if the geotechnical report has been reviewed. If it has been reviewed, TRUE; if it has not been reviewed, FALSE. - + xml:lang="en">Names of counterparties to the Bill of Sale for the installation. + xml:lang="en">Independent Engineering Services Checklist Energy Production Estimate [Member] + xml:lang="en">Information about maintenance costs for equipment not under warranty. + xml:lang="en">pro forma assumed annual insurance escalator percent. + + + xml:lang="en">NonUnity Power Model Factor, Typical Met Year, Percent + xml:lang="en">Renewable Energy Credit Offtake Agreement, Expiration Date + xml:lang="en">Maintenance cost of substation under warranty. + xml:lang="en">Amount of energy lost due to stability or congestion curtailment on the transmission system, based on major design/energy production model. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">Financial Transaction For Fund, Amount + - - + xml:lang="en">Indicates if industrial emission conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Identifier for Notice And Payment Instructions. - - + xml:lang="en">Maintenance cost of Module under warranty. + + + xml:lang="en">Document Identifier, Supplemental Report Review Of Local Tax Review + xml:lang="en">Indicates if there is security interest in the Asset Management Agreement. If it is, TRUE; if it is not, FALSE. + + xml:lang="en">Mounting equipment. + xml:lang="en">National Association of Insurance Commissioners (NAIC) number assigned to the insurance company and/or group providing the insurance. + xml:lang="en">Names of counterparties to the Approval Notice. + + - - + xml:lang="en">Tracker Is Fixed Tilt, Flag + xml:lang="en">Availability Of Exceptions To The Monthly Operating Report, Flag + + xml:lang="en">Address of the counterparty to the sale leaseback. + + xml:lang="en">Indicates if the Pledge Agreement is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Financial Transaction For System, Invoice Line Item, Description + + + xml:lang="en">Availability Of Final Substantial Completion Certificate, Flag + xml:lang="en">Socket type of the revenue meter, per manufacturer specification. + xml:lang="en">Identifier for Punch List. + xml:lang="en">Name of the company responsible for preparing the Property Tax Exemption Opinion. + + xml:lang="en">Availability Of Exceptions To The Approval Notice, Flag + + xml:lang="en">Availability Of Exceptions To The Assignment And Assumption Agreement, Flag - + xml:lang="en">Board Resolution For Master Lessee, Lessee and Operator, Effective Date + xml:lang="en">Indicates if the Qualifying Facilities Self Certification is available. If it is available, TRUE; if it is not available, FALSE. - + xml:lang="en">Availability Of Renewable Energy Credit Buyer Acknowledgement, Flag + xml:lang="en">Represents information about historical instances of financial transactions related to the system. + xml:lang="en">Area of the cells on the module. - - - - - + xml:lang="en">Issues During Construction [Abstract] + xml:lang="en">First year capacity factor percent, pre-availability and curtailment + xml:lang="en">Swift code for the bank. The Swift code is a standard format of Bank Identifier Codes (BIC) in accordance with ISO 9362. + xml:lang="en">Name of the company responsible for preparing the Operating Agreements For Master Lessee, Lessee And Operator. + + - - + xml:lang="en">Information indicating the contract supported by the security interest. + xml:lang="en">Revenue from generation of electricity, a process of producing electric energy by transforming other forms of energy such as nuclear, fossil fuel, solar, geothermal, hydro, and wind. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Used to group information about a reserve. + xml:lang="en">Performance Guarantee, Expiration Date + xml:lang="en">Information about the Operations and Maintenance Contract. - + xml:lang="en">Lease Six Months Average Rent, Amount + xml:lang="en">Appraised Value Details [Line Items] + + xml:lang="en">Entity Standard & Poors Credit Rating + + xml:lang="en">Contract Review Monitoring Service Provider [Member] + + + + + xml:lang="en">Expiration date of the Title Survey. + + + xml:lang="en">Notice Of Commercial Operations Date Exceptions, Description + + xml:lang="en">Expiration date of the Property Tax Exemption Opinion. + xml:lang="en">Information about the guarantee by the developer to the parent company for project revenue. + xml:lang="en">Interest payable on section 467, which is the interest that has accrued on the section 467 loan balance; for each period how much interest accrued on the balance during that period which will be an amount owed by lessor to lessee. + xml:lang="en">Maintenance cost of inverter with no warranty. + xml:lang="en">Independent Engineering Opinion Report, Effective Date + xml:lang="en">Tax identification number of the entity. Where tax id is not available, other government identification number is acceptable. + xml:lang="en">Master Services Agreement, Limitation of Liability, Description + + xml:lang="en">Active Energy Performance Index, Percent + + + - + xml:lang="en">Financial Transaction For System, Type, Description + xml:lang="en">Name of the depositary bank that is associated with the collateral agent (agent hired to monitor cash flows of the project, e.g., accountant who makes sure project is pulling in revenue, paying expenses) + xml:lang="en">Comments noted about the product model. + xml:lang="en">Availability Of Exceptions To The Bill Of Sale, Flag + xml:lang="en">Product Identifier, Module [Abstract] + xml:lang="en">Name of the company responsible for preparing the Notice Of Commercial Operations Date. - - + xml:lang="en">Preparer Of LLC Registration, Name - + xml:lang="en">Energy Contract Hourly Rate, Hour 16 [Member] + xml:lang="en">Module has Certification IEC61646, Thin-Film PV modules. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Data Acquisition Systems [Abstract] + xml:lang="en">Indicates if there is security interest in the Engineering Procurement and Construction Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Maintenance cost of roads with no warranty. + xml:lang="en">State Tax Credit Firm Volume, Power + xml:lang="en">Power Purchase Agreement, Payment Frequency, Description + xml:lang="en">Document Identifier, Notice And Payment Instructions + + xml:lang="en">SCADA System Documentation URI, Link + + + xml:lang="en">Review Of Module Factory Audit [Member] + xml:lang="en">Name of the company responsible for preparing the Environmental Impact Report. - + xml:lang="en">Fund Identifier + xml:lang="en">Construction Loan Agreement, Effective Date + xml:lang="en">Number of inverter hours downtime from inception to date. - - + xml:lang="en">Used to group a listing of information about an Evironmental Site Assessment. + xml:lang="en">Identifier for Closing Certificate. - - + xml:lang="en">Availability Of Final Construction Contractor Notice Of Certification, Flag + xml:lang="en">Punch List, Expected Completion Date + xml:lang="en">Developer Portfolio Performance Guarantee, Description + xml:lang="en">Site Average Elevation - + xml:lang="en">Counterparties To The Certificates Of Insurance, Names + xml:lang="en">Maintenance cost of Operations and Maintenance building with no warranty. - - + xml:lang="en">Operational Budget Review Of Monitoring Service Provider [Member] + xml:lang="en">Duration of additional terms allowed in the Power Purchase Agreement, beyond the initial term. For example, the PPA may allow two additional terms of five years each. The value, five years, should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. - - + xml:lang="en">Name of the company providing security. + xml:lang="en">Preparer Of Installation Agreement, Name + xml:lang="en">Indicates if the Exposure Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Information specific to Tracker products that are used in the system. - + xml:lang="en">Indicates if there is an upfront fee. If there is an upfront fee, TRUE; if there is not an upfront fee, FALSE. + xml:lang="en">Telephone number of individual who receives Power Purchase Agreement notices. - + xml:lang="en">Indicates if the Hedge Agreement is available. If it is available, TRUE; if it is not available, FALSE. - + xml:lang="en">Loan form and version number used for the loan used in project financing. - + xml:lang="en">Contact name for the equipment manufacturer. + xml:lang="en">Energy Budget Identifier [Axis] + xml:lang="en">Description of the use and qualification of equipment, for example module accelerated lifetime testing, Independent Engineering reports, and preferred equipment. + + + xml:lang="en">Expiration date of the SCADA (Supervisory Control & Data Acquisition) system license. + - + xml:lang="en">Indication as to whether the financial contract between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company, is eligible for the PACE program. - - + xml:lang="en">Meter equipment. + xml:lang="en">Represents information about security interests related to various contracts that support the system which can include the name of the contract supported, identifier for the contract and assets secured. + + xml:lang="en">0 + xml:lang="en">Indicates if the Substantial Completion Certificate is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Title Policy Exception [Table] + xml:lang="en">Amount of time taken to respond to a major event that happened during the period related to the operations of the project. + xml:lang="en">Energy Contract, Yearly Rate [Axis] [No Default] + xml:lang="en">Estimated Measures [Line Items] + + xml:lang="en">Identifier for Interconnection Approval. + + xml:lang="en">Distance To Nearest Owned PV System, Length + xml:lang="en">Description of any exceptions to the Notice of Commercial Operation. + xml:lang="en">Mechanical Completion Review Equipment Confirmation [Member] + xml:lang="en">Effective date of the Tax Indemnity Agreement. + + xml:lang="en">Used to group a listing of information about a Sponsor Group. + + xml:lang="en">Document Identifier, Construction Contractor Notice Of Certification + xml:lang="en">Used to show the dimensions of an inverter. + + + xml:lang="en">Component Maintenance Cost (No Warranty) Other, Amount + xml:lang="en">Counterparties To The Insurance Consultant Report, Names + xml:lang="en">A product code is a standardized, unique human-readable identifier that is compact,and can be easily parsed. It consists of an entity code concatenated to a product specific identification string, separated by a hyphen. A product string is up to 16 characters, comprised of upper case letters, number, and hyphens (‘-‘). +The format of a product code is: +[EntityCode]-[ProductString], e.g., UEE-E2000-3-XFM for company Universal Energy Enterprises with Entity Code UEE and Product String of E2000-3-XFM. + + + xml:lang="en">Inverter Output, Rated Voltage AC, Amount + xml:lang="en">Date on which appraisal was entered / corrected. + + xml:lang="en">Next Rate Adjustment, Date - - + xml:lang="en">Actual Renewable Energy Credit Revenue To Expected REC Revenue, Percent + + xml:lang="en">Employee [Table] + xml:lang="en">Provider of indemnification, for example, the developer/sponsor, per the Tax Indemnity Agreement. + xml:lang="en">Title of contact person at the Engineering Procurement and Construction contractor. + xml:lang="en">Name of Data Acquisition System manufacturer. - + xml:lang="en">Maximum amount of apparent power input that the inverter can safely draw. - - + xml:lang="en">Description of the Pyranometer to measure solar radiation flux density. - + xml:lang="en">Credit Support for Power Purchase Agreement, Flag + xml:lang="en">Document Identifier, UCC Security Agreement + xml:lang="en">Period Month December [Member] + xml:lang="en">Represents line items used to describe the Operations and Maintenance Contract. + - - + xml:lang="en">Confirmation of the availability of the construction documents per the Engineering Procurement and Construction Agreement. If available, TRUE; if not available, FALSE. - + xml:lang="en">Description of the system structure which can be Rooftop, Carport or Ground Mount. - + xml:lang="en">The total Hypothetical Liquidation at Book Value balance at the end of the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Inverter Maximum Power Point Tracking minimum operating voltage range. - - + xml:lang="en">Availability Of Notice Of Approval, Flag + xml:lang="en">Power Purchase Agreement, Power Offtake Agreement Type, Description + xml:lang="en">Entity Is Equipment Supplier, Flag + xml:lang="en">Indicates if the Cut Sheets are available. If they are available, TRUE; if they are not available, FALSE. + xml:lang="en">Email address for the first entity providing project financing. - + xml:lang="en">Date when all of the equipment is in place, so the installation could connect to the grid, (ready to request PTO - permission to operate), but do not yet have permission. + xml:lang="en">Identifier for Wiring Instructions. + xml:lang="en">Moody's rating of the provider of the Letter of Credit. + xml:lang="en">Performance Based Incentive Payment Deadline, Date + + + + + xml:lang="en">Project Rebate, Flag + + xml:lang="en">Counterparties To The Installation Agreement, Names + + + xml:lang="en">Operational Budget Review Of Decommissioning [Member] + xml:lang="en">Description of termination rights for the operator and the project company. - + xml:lang="en">Preparer Of Project Administration Agreement, Name + xml:lang="en">Names of counterparties to the Electrical Inspection. + + xml:lang="en">Surety Insurance [Table] - - + xml:lang="en">Amount of ACH payment discount as a percentage. + xml:lang="en">System Commercial Operations, Date + xml:lang="en">Performance Guarantee, Liquidated Damages, Amount - + xml:lang="en">Name of the company responsible for preparing the Site Control Contract. + xml:lang="en">Engineering, Procurement and Construction Contract, Date + xml:lang="en">Commercial operations date guaranteed which is the date by which the project has to be operational per the Power Purchase Agreement. + - - + xml:lang="en">Availability Of Exceptions To The Environmental Impact Report, Flag + xml:lang="en">Asset Manager Insurance Policy Management, Description + xml:lang="en">Represents information about the use of funds for a financing event such as counterparties involved, amount and the user of the funds. + xml:lang="en">Continuity of Operations Agreement, Parallel Monitoring Upfront Mobilization Fee, Amount + xml:lang="en">Minimum percent tolerance between nameplate (nominal) power and flash test capacity of the module, on average. - - + xml:lang="en">Counterparties To The Certificate Of Final Completion, Names - + xml:lang="en">Counterparty to the Monitoring Contract between the project company and engineering company to monitor system performance. + xml:lang="en">Issue date of the product certification. - + xml:lang="en">Percent of preventative maintenance remaining to be completed. + xml:lang="en">Preparer Of Continuity Of Operations Agreement, Name + xml:lang="en">Developer Megawatt Construction Projects, Number + xml:lang="en">Link to the Punch List document. + xml:lang="en">Names of counterparties to the Pricing File. + xml:lang="en">Closing Indemnity Agreement, Link + + + xml:lang="en">Combiner Box Temperature, Maximum + xml:lang="en">Amount of energy lost due to economic curtailment based on major design/energy production model. Economic curtailment is a result of wholesale market pricing, etc. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">Actual renewable energy credit revenue divided by expected renewable energy credit from inception to date. + + + xml:lang="en">Description of Limitation of Liability clause in the Power Purchase Agreement. + xml:lang="en">Energy Contract Hourly Rate, Hour 5 [Member] + xml:lang="en">Availability Of Final Equipment Warranties, Flag + + + xml:lang="en">Information about the Commitment Agreement which is the commitment to fund the project between the investor and developer. + xml:lang="en">Operations And Maintenance Contract Invoicing, Date + + + xml:lang="en">Funds Flow, Account Number + xml:lang="en">Indicates if the entity or counterparty is an EPC Contractor; if it is, TRUE; if it is not, FALSE. + xml:lang="en">Special Purpose Vehicle Details [Line Items] + xml:lang="en">Indicates if the UCC Tax Lien and Judgment Lien Searches are available. If it is available, TRUE; if it is not available, FALSE. + + + xml:lang="en">Employee Role, Description + xml:lang="en">Appraised Value System, Market Comp Method, Amount + xml:lang="en">Preparer Of Certificate Of Formation For Master Lessee, Lessee And Operator, Name + xml:lang="en">Indicates if the Operations and Maintenance Manual is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability of Exceptions to the Independent Engineering Production Estimate Report, Flag + xml:lang="en">Used to group a listing of information about an Asset Manager. + + xml:lang="en">Used to group information about the Energy Budget. + xml:lang="en">Source Of Funds [Abstract] + + xml:lang="en">Link to regulatory application document. + xml:lang="en">Information about expected system production. + xml:lang="en">Power Purchase Agreement, Production Cap, Amount + xml:lang="en">Lessee Collateral Agency Agreement, Expiration Date + + + xml:lang="en">Completion of Investor Parallel Monitoring Feed + [Member] + xml:lang="en">Indicates if the Supplemental Report Review Of Insurance Review is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Equipment Onboarding [Table] + xml:lang="en">Permits And Assessments Review Conditional Use Permit [Member] + xml:lang="en">Name of the company responsible for preparing the Independent Engineering Report. + xml:lang="en">Notice Of Commercial Operation, Link - + xml:lang="en">Asset Manager Failure and Remediation Procedures, Description + xml:lang="en">Effective date of the Certificate of Formation for Master Lessee, Lessee and Operator. + xml:lang="en">Indicates if the Master Services Agreement is available. If it is available, TRUE; if it is not available, FALSE. + + + xml:lang="en">Total upfront capitalized Fees per the pricing model. + + + xml:lang="en">Availability Of Exceptions To The Site Lease Memo, Flag + xml:lang="en">Represents information about measures that are estimated into the future related to the system. Estimates should be used with EstimationPeriodStartDateAxis, and an EstimationPeriod for the concept being reported. + xml:lang="en">Target Balance, Period + - + xml:lang="en">Appraised value as % of appraised value at commercial operations date. + xml:lang="en">Master Services Agreement Exceptions, Description + xml:lang="en">Partnership Flip, P75 Flip Period + xml:lang="en">Description of side letters. + + xml:lang="en">Availability Of Other Equipment Due Diligence Reports, Flag + + + xml:lang="en">Information about the Monthly Operating Report for the project which documents monthly statistics on insolation, energy, availability and performance. + xml:lang="en">Project Administration Agreement, Effective Date + xml:lang="en">Priority of Corrective Action, Number + xml:lang="en">Link to the Certificates Of Insurance document. + + + + xml:lang="en">Link to the Design And Construction document. + xml:lang="en">Description of source document requirements used for other testing. + + xml:lang="en">Construction Monitoring Report Exceptions, Description - + xml:lang="en">Indicates if there are exceptions to the Environmental Site Assessment I or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Information about the address of the site. + xml:lang="en">Multiplier indicating the amount that the inverter can operate at above the inverter DC nameplate capacity. For example, at a design factor of 1.1, can safely operate 10% above the stated nameplate capacity rating. + + xml:lang="en">Natural Resource Identifier [Line Items] - + xml:lang="en">Name of the beneficiary of the wired funds. - + xml:lang="en">Revenue Meter Operational Temperature Range, Minimum - - + xml:lang="en">Information about the operating company financial data. + xml:lang="en">Percentage of kWh lost due to soiling based on typical meteorogical year, calculation based on major design model used. + xml:lang="en">Parallel Monitoring [Abstract] + xml:lang="en">Orientation [Abstract] + xml:lang="en">Indication if, in the event of a default, the non breaching party can monetize the collateral on the other agreement. - - - - + xml:lang="en">Insurance [Table] + xml:lang="en">IECRE Certificate, Date - - - + xml:lang="en">Power Purchase Agreement, System True-up Production, Amount + xml:lang="en">SCADA System [Member] + xml:lang="en">Date on which the fund closed. - + xml:lang="en">Site Lease Access Agreement, Type - + xml:lang="en">Represents information about site-specific cultural resources which are defined as places of archeological, historical or cultural significance, for example, an historic preservation site, burial ground, place of current or former worship, etc. Related information can include name, location and description of the resource. + xml:lang="en">Component Maintenance Cost (No Warranty) Operations And Maintenance Cost Building, Amount + xml:lang="en">Transmission and curtailment report, historical and forward looking analysis. + xml:lang="en">Name of sponsor who brings the project to the bank. It is usually the project developer. + xml:lang="en">Names of counterparties to the Equipment Warranties. + + xml:lang="en">Availability Of Master Services Agreement, Flag + - + xml:lang="en">Document Identifier, LLCA Agreement + + + xml:lang="en">Counterparties To The Operations Manual, Names + + + xml:lang="en">Mechanical Completion Certificate Exceptions, Description + xml:lang="en">Date of commissioning which includes conditional acceptance by owner. + xml:lang="en">Number of units used to measure power system capacity for state tax credit. + xml:lang="en">Expected completion date of the Engineering, Procurement and Construction Agreement. + xml:lang="en">Effective date of the Certificate of Acceptance Report. + xml:lang="en">Information about the fund. + + + xml:lang="en">Description of end of term provisions of the Power Purchase Agreement. + xml:lang="en">Module Has Certification IEC62108, Flag - + xml:lang="en">Identifier for Equity Contribution Agreement. - + xml:lang="en">Useful life of storage system in years, as input to the appraisal. - + xml:lang="en">Breakage Fee Agreement [Abstract] + + + xml:lang="en">Names of counterparties to the Closing Certificate, which documents that the project has been funded and includes supporting information about the lease.. - - + xml:lang="en">Description of certifications available for the optimizer. + xml:lang="en">Indicates if there is a cross default pool for the Equity Capital Contribution Agreement. If it is, TRUE; if it is not, FALSE. + + xml:lang="en">Investment Memo, Expiration Date + xml:lang="en">Operations And Maintenance Contract, Scope of Work, Description + xml:lang="en">Information about employees. + xml:lang="en">Identifier for Membership Certificate Of Master Lessee. + xml:lang="en">Production oversight and remediation report, as-needed. - + xml:lang="en">Description of any exceptions to the property insurance certificate. + xml:lang="en">Used to define the hour of the day. - + xml:lang="en">SubArray Geospatial Layout File, Link + xml:lang="en">One-year in-plane assumed irradiation, Hi, as described in IEC 61724-1 Ed. 2, in kWh/m2. - + xml:lang="en">Description of the individual financing event, for example, closing or initial funding. + xml:lang="en">Link to the Construction Monitoring Report document. + + + xml:lang="en">Incentives Expected per Production Inception To Date + xml:lang="en">Inverter has certification UL1741 Supplement A, for Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Resources. + + xml:lang="en">Operations And Maintenance Manual, Effective Date + xml:lang="en">Fund Cross Collateralized, Flag + xml:lang="en">Execution date of the performance based incentive amendment. + xml:lang="en">Irradiation Weather Adjustment Factor + xml:lang="en">Site License Agreement, Link + xml:lang="en">Name of the company responsible for preparing the Equity Contribution Document. + + xml:lang="en">This table allows reporting about the details of entities involved in a project describing who they are, their role and individual attributes. This table must include the Entity Axis which uniquely identifies the entity. - + xml:lang="en">Link to Division of State Architect approval notice. + xml:lang="en">Information about the Pledge Agreement for the project. - - + xml:lang="en">Component Maintenance Cost (No Warranty) Medium Voltage equipment, Amount + xml:lang="en">Name of the company responsible for preparing the Local Incentive Contract. - - + xml:lang="en">Percent efficiency rating of the inverter at vmin with a specified inverter power level. Vmin is the lowest possible operating voltage needed for energy efficiency and reliability optimization. + xml:lang="en">Represents information about sponsors such as name and credit rating. + xml:lang="en">Met Station Location, Description - - + xml:lang="en">Names of counterparties to the Operations and Maintenance Manual. - - + xml:lang="en">Estimated Value of House, Amount + xml:lang="en">Independent Engineering Services Checklist [Abstract] + xml:lang="en">Lease Counterparty Jurisdiction, Description - - - + xml:lang="en">Line items represent information about early buy out options in project financing. + xml:lang="en">Zoning Permit, Upfront Fee Required, Flag + xml:lang="en">Indicates if there are exceptions to the Substantial Completion Certificate. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Warranty review of PV modules. + xml:lang="en">Names of counterparties to the Construction Contractor Notice of Certification. + xml:lang="en">Information related to an issue covering plan of action to be taken on the issue. + xml:lang="en">Environmental Site Assessment, Preparer + xml:lang="en">Identifier for Security Contract. + xml:lang="en">Used to group information about the warranties available for types of equipment used in a system. - - + xml:lang="en">Incentive Performance [Abstract] + xml:lang="en">Names of counterparties to the Master Services Agreement. + xml:lang="en">Used to group information about studies developed about a natural resource located on a site. + xml:lang="en">Indicates if the Estoppel Certificate Power Purchase Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Used to group information about the role of a third party.. - - + xml:lang="en">Target Balance [Table] + + xml:lang="en">Model Ongoing Module Degradation Loss, Amount + + + xml:lang="en">Product Identifier, Network Type [Abstract] + xml:lang="en">Represents 06:00 in 24 hour military time, 6:00 am. on the am/pm 12 hour clock. - - + xml:lang="en">Description of telecommunications accounts per the Continuity of Operations Agreement. + xml:lang="en">Indicates if the project has a rebate. If it has a rebate, TRUE; if not, FALSE. + + xml:lang="en">Inverter is at 30% power level. + + xml:lang="en">Names of counterparties to the Appraisal. + xml:lang="en">Operations Manager Megawatts Under Management, Power + xml:lang="en">Other Payments to Financiers, Amount + xml:lang="en">IECRE System Dates [Abstract] + xml:lang="en">Limited Liability Company Agreement, Capital Contributions, Amount + xml:lang="en">Ground [Member] + xml:lang="en">Inverter Output, Maximum Power AC, Amount + xml:lang="en">Expiration date of the Interconnection Agreement. + + + + xml:lang="en">Maximum rated voltage of the optimizer.Maximum rated voltage of the optimizer. Absolute maximum input voltage Voc at the lowest temperature according to NEC. + xml:lang="en">Cross Default Pool for Operations and Maintenance Agreement, Flag + + - + xml:lang="en">Indicates if the entity or counterparty is a Site Host; if it is, TRUE; if it is not, FALSE. + xml:lang="en">Descripton of the Independent Engineering Report. + xml:lang="en">Title Policy Insurance Company, Name + xml:lang="en">Energy Budget Identifier + - - + xml:lang="en">Date on which the financing event occurred. + xml:lang="en">Sub Array [Abstract] + xml:lang="en">End date of the performance guarantee period in the Operations and Maintenance Contract. + xml:lang="en">Proportional rent, which is rent accrued for tax purposes. It is a calculated value to show how much rent accrues during the period. + + xml:lang="en">Indication as to whether Insurance is available. If available, TRUE; if not available, FALSE. + xml:lang="en">Description of the asset manager billing method. - - - + xml:lang="en">Used as identifier for title policy exceptions. + xml:lang="en">Power Purchase Agreement, Invoices, Company To Bill - + xml:lang="en">Name of the advisor reviewing the independent engineering services report. - - - - + xml:lang="en">Expiration date of the Pricing File. + xml:lang="en">PV System Identifier [Axis] + xml:lang="en">Reserve Type [Table] + xml:lang="en">Items on the Independent Engineering Services Checklist on post-funding activities. + xml:lang="en">An amount contributed by a partner with a negative capital account balance that brings the account balance to zero when the partnership interest is liquidated, usually within 90 days or by the end of the tax year in which the partner's interest are sold. - + xml:lang="en">Guarantee Cap, Amount + xml:lang="en">Design review of the Civil IFC (Industrial Foundation Classes) Drawings including earthwork and drainage. + xml:lang="en">Credit Support Amount Identifier [Axis] + + xml:lang="en">Represents 21:00 in 24 hour military time, 9:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Project Address 1 + xml:lang="en">Model Reference Cell Irradiance + + xml:lang="en">Identifier for Certificate Of Completion. + xml:lang="en">Preparer Of LLC Formation Documents, Name + + + xml:lang="en">Rated input power of the optimizer. + xml:lang="en">Cost of ownership for system over the time period of the test in currency/W. + xml:lang="en">Link to the Tax Indemnity Agreement document. - + xml:lang="en">Tracker Is Dual Axis, Flag - + xml:lang="en">Names of counterparties to the Transmission Report and Curtailment Estimate. + xml:lang="en">Indicates if the Master Services Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Name of the company responsible for preparing the Substantial Completion Certificate. + xml:lang="en">Performance Based Incentive Program, Description - + xml:lang="en">Indicates if the signed Authorization to Mark Letter is from NRTL. If it was, TRUE; if it was not, FALSE. + + + xml:lang="en">Portfolio Legal Entity, Name + xml:lang="en">Indicates if the Operating Agreements for Master Lessee, Lessee and Operator is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Partnership Flip, Contract Term + + + xml:lang="en">Description of any exceptions to the Building Inspection or issues raised. + xml:lang="en">Model Module Orientation Loss, Amount + xml:lang="en">Expiration date of the Breakage Fee Agreement. - + xml:lang="en">Environmental Site Assessment [Abstract] + xml:lang="en">Cross Default Pool for Site Permit, Flag - - + xml:lang="en">Component Maintenance Cost (No Warranty) Module, Amount + + xml:lang="en">Identifier for the portfolio. + xml:lang="en">Information about the LCC Registration for the project. - + xml:lang="en">Identifier for the approvals for an individual financing event. + xml:lang="en">Easement Report Exceptions, Description + xml:lang="en">Surety Bond Is Electronic, Flag + xml:lang="en">Availability Of Final Independent Engineering Report, Flag + - + xml:lang="en">Module Open Circuit Voltage - + xml:lang="en">Natural Resource Permit Action, Name + xml:lang="en">Description of financing structure, for example, sales leaseback, partnership flip. + xml:lang="en">Master Purchase Agreement, Assets, Description + xml:lang="en">Site Control Access Requirements, Description - - + xml:lang="en">Product Identifier, Battery [Abstract] + xml:lang="en">Fully Contracted Power Sales Greater Than Or Equal To Sales Leaseback Term, Flag + + xml:lang="en">Power Purchase Agreement Contract [Table] - - + xml:lang="en">Effective date of the Punch List. + xml:lang="en">Availability Of Certificate Of Final Completion, Flag + + xml:lang="en">Warranty review of Other material equipment if any. + + xml:lang="en">Used to group information about a Employee. + xml:lang="en">Updated PV Design Model - + xml:lang="en">Loss Factor [Table] - + xml:lang="en">Engineering, Procurement and Construction Contractor Details [Abstract] - - + xml:lang="en">Reportable Environmental Condition Details [Line Items] + xml:lang="en">Name of pricing advisor which is the individual who runs the pricing model and could be the banker. + xml:lang="en">Effective date of the independent engineering opinion report. + xml:lang="en">Description of the contractor performance guarantee in the Operations and Maintenance Contract. + xml:lang="en">Rate stated in the financial contract between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company, related to the system, in amount of kWh. + + + xml:lang="en">Pricing File, Expiration Date + xml:lang="en">Availability Of Membership Certificate Of Lessee, Flag + xml:lang="en">Breakage Fee Side Letter, Contracting Parties + xml:lang="en">Azimuth of the sun, measured in degrees. The horizontal angle measured clockwise from true north, e.g. True North = 0 degrees, East = 90 degrees, South = 180 degrees, etc. - + xml:lang="en">Name of the asset manager. - + xml:lang="en">Inverter Maximum Power Point Tracking maximum operating voltage range. + xml:lang="en">Availability Of Final Limited Liability Company Agreement, Flag + xml:lang="en">Mechanical completion review - check for commissioning tests on grounding continuity. - + xml:lang="en">Operational Event Reporting [Table] + xml:lang="en">Cultural Resource Identifier [Table] - + xml:lang="en">Percent availability required to meet the achievement goal, for example 98% plant availability. + xml:lang="en">Availability Of Hedge Agreement, Flag + xml:lang="en">Shared Facility Agreement, Link - + xml:lang="en">Availability Of Exceptions To The Incentive Assignment, Flag + xlink:label="label_solar_FundDescriptionAvailabilityOfExpenseSinkingFund" + xlink:role="http://www.xbrl.org/2003/role/documentation" + xlink:type="resource" + xml:lang="en">Availability of Expense Sinking Fund which is a reserve account to pay for expenses. If available, TRUE; if not available, FALSE. + + + xml:lang="en">Sponsor performance guarantee as percent of P50 energy production per the Operator Performance Guarantee. + + xml:lang="en">Solar Array Annual Degradation, Percent + xml:lang="en">AC voltage of the line to line revenue meter. + xml:lang="en">Performance Ratio Methodology, Description + + xml:lang="en">Reserve for a fund. + xml:lang="en">Indicates if the Co Tenancy Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of the type of investment the bank has made in the fund, for example did they invest on the initial round or were they assigned a portion by another investor. + xml:lang="en">Earliest Commercial Operations Date + + xml:lang="en">Module Has Certification UL1703, Flag + + xml:lang="en">Model number and name of the product. + xml:lang="en">IECRE Inspection Body (IB) responsible for the inspection. + + xml:lang="en">Continuity of Operations Agreement, Backup Asset Management Monthly Fee + xml:lang="en">Used as the identifier for a study conducted about a cultural resource. + xml:lang="en">Counterparties To The Membership Certificate Of Lessee, Names + xml:lang="en">Information about the Wiring Instructions for the project. + xml:lang="en">Use to identify information by a particular type of product. This Product axis is different than the Device axis. The Device axis is used categorize data by the specific instance of the device, whereas the product axis captures information about the device as a class of product. For example a product does not have a purchase date or a serial number but the device class does. - + xml:lang="en">Asset Management Contract Subcontractor - + xml:lang="en">Assets Solar Facilities + xml:lang="en">Initiation date of the sponsor performance guarantee per the Operator Performance Guarantee. + xml:lang="en">Power Purchase Agreement, Assignment Provisions, Description + xml:lang="en">Inverter Battery Input [Abstract] - + xml:lang="en">Environmental Site Assessment, Phase - - - + xml:lang="en">Term Sheet, Expiration Date - - - + xml:lang="en">Identifier for Module Accelerated Age Test Report. + xml:lang="en">Information about the array in an installation which can be a single array or a set of sub arrays. A sub array is a PV surface unit connected to an inverter. + xml:lang="en">Contact title for the utility company where the grid connection will reside. + xml:lang="en">Module Maximum Voltage Per UL + xml:lang="en">Legal Entity Articles of Organization, Link + xml:lang="en">Availability Of Exceptions To The Estoppel Certificate Power Purchase Agreement, Flag + xml:lang="en">Side Letters, Description - - + xml:lang="en">Site Environmental Condition [Abstract] + xml:lang="en">Site Control Lessor, Name + xml:lang="en">Availability Of Exceptions To The Design And Construction Documents, Flag + + xml:lang="en">Used to group information about the state by state performance of the asset manager. + + xml:lang="en">Module Level Power Electronics [Abstract] - + xml:lang="en">Audit Fees + xml:lang="en">Amount of the production cap in the Power Purchase Agreement in kWh. + xml:lang="en">Wind speed during the test condition. + xml:lang="en">Developer Megawatt Construction, Number + xml:lang="en">Exposure Report Exceptions, Description + xml:lang="en">Funds Flow, Reference Note, Description + + + xml:lang="en">Used to group a listing of information about zoning permit documents. - + xml:lang="en">Identifier for Electrical Inspection. + + - + xml:lang="en">Model Relative Humidity, Percent + + + xml:lang="en">Power Purchase Agreement, Actual Revenue Generated, Inception To Date, Amount + xml:lang="en">Annual cost of rent for the site per the Site Lease Agreement. + xml:lang="en">Legal Entity Operating Agreement Availability, Flag + xml:lang="en">Indicates if the Pledge Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + + xml:lang="en">Network Type, Description + xml:lang="en">IECRE Certificate For System [Abstract] + + xml:lang="en">Bank-specific number associated with the project schedule. + + xml:lang="en">Information about cultural resources related to a site such as description of the resource or permits. + + xml:lang="en">Monthly Operating Report Balance Sheet [Abstract] - - + xml:lang="en">Identifier for Property Tax Exemption Opinion. + xml:lang="en">Model Temperature Loss, Amount + xml:lang="en">Used to group a listing of information about a Special Purpose Vehicle. + xml:lang="en">Link to FERC 203 application document. + xml:lang="en">State Tax Credits + xml:lang="en">Federal tax identification number for the developer. - - + xml:lang="en">Cross Default Pool for Engineering Procurement and Construction Agreement, Flag + xml:lang="en">Fund Financing Type, Description + + + xml:lang="en">Used to group equipment-related information that may be relevant to the onboarding process of a system. + xml:lang="en">Maximum percent efficiency rating of the optimizer. - + xml:lang="en">Availability Of Exceptions To The Investment Memo, Flag + xml:lang="en">Indication that proof of approval is available. If proof of approval is available, TRUE; if not, FALSE. + xml:lang="en">Power Purchase Agreement, Counterparty + xml:lang="en">Description of biological resources that should be considered concerning the installation, for example, presence of endangered species, vegetation. + xml:lang="en">All In Performance Index, Percent + xml:lang="en">Date at which the partnership flip is expected to occur based on getting the average amount of expected output. + + xml:lang="en">Description of contract history and structure of the Power Purchase Agreement. + xml:lang="en">Depth of the Inverter. + + xml:lang="en">Period Month September [Member] + + xml:lang="en">Monitoring Contract, Rate Type, Description - - + xml:lang="en">Security Interests, Interest Recorded, Flag + xml:lang="en">Entity Phone Number + xml:lang="en">Indicates if a review of the PPA contract has been considered. If it has been considered, TRUE; if it has not been considered, FALSE. - - + xml:lang="en">Availability Of Final Pricing File, Flag + + xml:lang="en">IECRE Insurance And Surety [Abstract] + xml:lang="en">Product Certificate Holder, Name + xml:lang="en">Tax Filing Requirement, Description + + + xml:lang="en">UCC Tax Lien and Judgment Lien Searches, Expiration Date + xml:lang="en">Effective date of the lien waiver. + xml:lang="en">Revenue Meter Voltage Rating, Accuracy Range + + xml:lang="en">Inverter Output, AC Frequency Range Minimum, Amount + xml:lang="en">Indicates if the optimizer has EN61000 certification, emissions and immunity standard. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Product Certification, Issue Date + + + xml:lang="en">Site Lease Access Agreement Exceptions, Description + xml:lang="en">Percent of state tax credit escalator. + + + xml:lang="en">Link to the Membership Certificate Of Lessee document. + xml:lang="en">Information about financial contracts between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company, related to the system. + xml:lang="en">Utility Contact, Name + xml:lang="en">Component Maintenance, Severity Of Event + xml:lang="en">Indicates if the Master Purchase Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Indicates if the Appraisal is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + + + xml:lang="en">Preparer Of Host Acknowledgement, Name + + xml:lang="en">Name of organization serving as administrator to the Master Services Agreement. + + xml:lang="en">Description of operational areas that will be outsourced along with qualifications of the companies the operations manager will engage. + xml:lang="en">Expected DC Energy At Array, Amount - - + xml:lang="en">Maintenance cost of wiringconduit under warranty. + xml:lang="en">Indicates if the notice of approval is available. If it is available, TRUE; if it is not available, FALSE. - - + xml:lang="en">Power factor of the inverter operating at nominal power. Power factor is the ratio of real power to apparent power. - - + xml:lang="en">Preparer Of Easement Report, Name + xml:lang="en">Site Control Special Features, Description + xml:lang="en">LCC Registration, Expiration Date + xml:lang="en">Bill Of Sale Exceptions, Description + xml:lang="en">Construction Monitoring Report, Effective Date - - - + xml:lang="en">Table represents state by state performance defined as actual to energy production of projects of the asset manager. - - + xml:lang="en">Expiration date of the Membership Certificate of Lessee. + + xml:lang="en">Employee Identifier [Axis] + xml:lang="en">Description of any exceptions to the Site Lease Access Agreement. + xml:lang="en">Represents information about a Utility. + xml:lang="en">Name of the counterparty to the sale leaseback. + xml:lang="en">Names of counterparties to the Insurance Consultant Report. + - + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Operations and Maintenance - Corrective Maintenance. - + xml:lang="en">Rated frequency of the inverter in Hertz. + xml:lang="en">Preparer Of Operational Event Report, Name + xml:lang="en">Approvals, Date of Approval + xml:lang="en">Pre-shipment inspection report, for example may include visual, EL, flash test of random sample. + xml:lang="en">Use to group information needed for a manufacturer cut sheet. + xml:lang="en">Fund Debt Financing, Flag + + xml:lang="en">Entity Is Sponsor Parent, Flag + xml:lang="en">Payment terms for the Asset Management Contract agreement. + xml:lang="en">Information about the Renewable Energy Credits - - + xml:lang="en">Emergency or Construction Curtailment Model Factor, Percent + xml:lang="en">Renewable Energy Credit Contract, Expiration Date + + xml:lang="en">Availability Of Final Lessee Collateral Agency Agreement, Flag - - + xml:lang="en">Operations Manager Performance By Geography [Line Items] + xml:lang="en">Original Term of Power Purchase Agreement or Lease + xml:lang="en">Pricing Model, Depreciable Basis, Amount + + xml:lang="en">Performance ratio, weather corrected, percent, calculated per IEC 61724-3. + xml:lang="en">Operations Manager NERC and FERC Qualifications, Description - + xml:lang="en">Operations Manager Operational Center, Description + xml:lang="en">Description of the process and individuals authorized to make decisions in the developer governance process. + xml:lang="en">Inverter Is Grid Support Utility Interactive, Flag + + xml:lang="en">Link to the funding proposal Request document. + + + xml:lang="en">Represents information about products typically reported on a manufacturer cut sheet. + xml:lang="en">Financial Transaction For Fund [Line Items] + xml:lang="en">Availability Of Exceptions To The Co Tenancy Agreement, Flag + xml:lang="en">Meteorological Station, Description - + xml:lang="en">Used as the identifier for Developers. - - + xml:lang="en">Cost Segregation Amortization Percent of Appraised Value, Percent + xml:lang="en">Indicates if there are exceptions to the Independent Engineering Production Estimate Report or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Identifier for Monthly Operating Report. + xml:lang="en">UCC Precautionary Lease Filing Exceptions, Description + + xml:lang="en">Indication that reserve fund has accumulated per schedule. If it is on schedule, TRUE; if it is not on schedule, FALSE. - - + xml:lang="en">Revenue from renewable energy rebate program. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Agreement Variance Related To Action, Description + xml:lang="en">System Distributed Energy Resource Type + xml:lang="en">Reserve Account Required Date + + + xml:lang="en">Bill Of Sale, Effective Date + xml:lang="en">Name of the project company. + + + xml:lang="en">Building Inspection, Link + xml:lang="en">Address where notices regarding activities related to the Power Purchase Agreement are sent. + xml:lang="en">Asset Manager Warranty Experience, Description + xml:lang="en">LLC Formation Documents, Expiration Date - + xml:lang="en">Inverter Power At 100 Percent Power Level [Member] + xml:lang="en">Indicates if the Module Accelerated Age Test Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Expiration date of the developer performance guarantee for the portfolio. + xml:lang="en">Document Identifier, Liability Insurance Certificate Agreement + xml:lang="en">Maximum series fuse rating: rated capacity in amps of the largest fuse that can be used to support module strings. + + + xml:lang="en">Description of the financial assurances provided by the Engineering Procurement and Construction contractor. + xml:lang="en">Assignment And Assumption Agreement, Expiration Date + + + xml:lang="en">Availability Of Independent Engineering Report, Flag + xml:lang="en">Identifier for Approval Notice. + xml:lang="en">Link to the Tax Opinion document. + xml:lang="en">Used to identify individual reports used to monitor the ongoing performance of the installation. + + + + + + + xml:lang="en">Measured Energy To Expected Energy At The Revenue Meter, Percent + - + xml:lang="en">Availability Of Final Operations And Maintenance Agreement, Flag + xml:lang="en">Maximum rated DC voltage input of the inverter. + xml:lang="en">Link to the Host Acknowledgement document. + + xml:lang="en">Routing number for the bank account. - + xml:lang="en">Risk Priority Number - - + xml:lang="en">Equipment Type Warranty, Start Date - + xml:lang="en">Logger [Member] + xml:lang="en">Effective date of the Investment Memo. + xml:lang="en">Expected monthly deferred tax liability. + xml:lang="en">Approval Memo, Description + xml:lang="en">Design And Construction Documents, Link + + + xml:lang="en">Review By Contractor Of Monitoring Service Provider [Member] + xml:lang="en">Asset Management Contract Payment Method, Description + xml:lang="en">Name and title of contact at backup Operations and Maintenance subcontractor + xml:lang="en">System Identifier + xml:lang="en">Earliest commercial operation date. - - + xml:lang="en">Master Lessee Security Agreement, Effective Date + xml:lang="en">Zoning Permit Identifier [Axis] + xml:lang="en">Information about issues that occur during construction. + xml:lang="en">Estimated degradation rate of the system, in percent of kWh lost. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. - + xml:lang="en">Exception To Performance Test [Member] - - + xml:lang="en">Estimated Array Degradation Rate, Percent - + xml:lang="en">Used as identifier for cash distributions made to investors from the project. + xml:lang="en">Description of funds the developer is involved with including general fund structure, organization and competitive advantage in target markets. - - + xml:lang="en">ISO country code where the site is located. + xml:lang="en">Effective date of the Board Resolution for Master Lessee, Lessee and Operator. + + - + xml:lang="en">Standard Test Condition [Member] + xml:lang="en">System, Battery Connection + xml:lang="en">Maximum Continuous Output Power Data For 180 Minutes, Flag + xml:lang="en">Project State Tax Credit, Flag + xml:lang="en">Latest Commercial Operations Date + xml:lang="en">Indicates if the entity or counterparty is a Utility; if it is, TRUE; if it is not, FALSE. + xml:lang="en">The height of the tracker from ground-level. - + xml:lang="en">Regulatory FERC203 Application Approval Notice, Date - + xml:lang="en">Aggregate number of modules (panels) in a system. + + xml:lang="en">Hypothetical Liquidation At Book Value, Balance Per Watt + xml:lang="en">Surety Obligee, Email + xml:lang="en">Installation Agreement [Abstract] + xml:lang="en">Availability Of Exceptions To The Property Insurance Certificate, Flag + xml:lang="en">Meter Meets PBI Eligibility, Flag + + xml:lang="en">Inverter Enclosure Environmental Rating, Description + - - + xml:lang="en">Inverter Ground Fault Detector Interrupter, Description + xml:lang="en">Monthly Operating Report Summary [Abstract] - - + xml:lang="en">Minimum value of the voltage range of the inverter, per manufacturer specification. + + xml:lang="en">Document Identifier, Approval Notice - + xml:lang="en">Percent Of Federal Investment Tax Credit Vested, Percent + xml:lang="en">Intermonthly Availability Of Energy, Percent + xml:lang="en">Security Interest [Table] + xml:lang="en">Name of the company responsible for preparing the Security Contract. - - + xml:lang="en">Pricing Model, Total Upfront Amortized Fees, Amount + xml:lang="en">Developer Insurance Requirements, Description + xml:lang="en">Property Tax Exemption Opinion Exceptions, Description + xml:lang="en">Expiration date of the Performance guarantee, which is provided by the operator or developer to guarantee a certain level of operating performance. - - + xml:lang="en">Amount of deficit restoration obligation in the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Component Maintenance Event [Axis] + xml:lang="en">Information about the operational performance of the installation. + + xml:lang="en">Identifier for Mechanical Completion Certificate. + + + xml:lang="en">Availability Of Exceptions To The Notice Of Commercial Operation, Flag + + + xml:lang="en">OffTaker [Line Items] + + + + xml:lang="en">Availability Of Exceptions To The Continuity Of Operations Agreement, Flag + xml:lang="en">Represents information about the approval condition for a financing event which can include a description of the condition or follow up item, action taken and status, for example, completed the full or partial capacity deliverability study. - + xml:lang="en">Communication protocol of the SCADA System which can be Modbus, Zigbee, WIFI, or Ethernet. + xml:lang="en">Site Control Lessee, Name + xml:lang="en">Description of the zoning permit termination provision. + xml:lang="en">Module Rated Current At Low Irradiance + xml:lang="en">Notice and Payment Instructions, Expiration Date + xml:lang="en">Indicates if the Electrical Inspection is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Document Identifier, Monthly Operating Report + xml:lang="en">Preparer Of Term Sheet, Name - - + xml:lang="en">Amount of the payment made for the use of the funds. - + xml:lang="en">Description of the monitoring system for the inverter. + xml:lang="en">Total Curtailment Model Factor, Amount - + xml:lang="en">Effective date of the LLC Formation Documents. + xml:lang="en">Document Identifier, Membership Certificate Of Lessee + xml:lang="en">Name of the site. + xml:lang="en">Test condition measurement is performed using Standard Test Conditions which include the following constraints: cell temperature = 45; wind speed = 1; air mass = 1.5; irradiance = 1000; ambient temperature = 25. + xml:lang="en">DER (Distributed Energy Resource) type of the system, which could be PV System Only, Storage Only, PV plus Storage, Wind or PV Charging Station. + xml:lang="en">Transformer [Member] + + + xml:lang="en">Indicates if the fire risk report has been submitted. If it has been submitted, TRUE; if it has not been submitted, FALSE. - - - - + xml:lang="en">Cross Default Pool [Abstract] + xml:lang="en">Identifier for the counterparty that is using the funds. + + xml:lang="en">Continuity of Operations, SCADA Test Results, Description + + xml:lang="en">Permits and assessments review of Easements. + xml:lang="en">Timestamp for completion of the IECRE commissioning. + xml:lang="en">Recent Event About The Project, Description + xml:lang="en">Represents information about multiple sites. + xml:lang="en">Name of the company responsible for preparing the Supplemental Report Review Of Insurance Review. - - + xml:lang="en">Measured Energy Availability Single Turbine Issues, Percent + xml:lang="en">Availability Of Exceptions To The Operating Agreements For Master Lessee, Lessee And Operator, Flag + xml:lang="en">Component Failure Indication, Flag - - + xml:lang="en">Cost Of Services, Depreciation And Amortization Per Watt + xml:lang="en">Used as identifier for the System. - - + xml:lang="en">Description of any exceptions to the Master Lease. + xml:lang="en">Number of projects under management by the asset manager. + xml:lang="en">Actual Cost Of Unavailability From Lost Energy Cost Per kWh, Amount + xml:lang="en">Optimizer Maximum Output Current + + xml:lang="en">Supplemental Report Review Of Insurance Review Exceptions, Description + xml:lang="en">Entity County + xml:lang="en">Link to FERC 205 approval notice. - - + xml:lang="en">PV Array Energy One Year Yield, Energy + xml:lang="en">Current Simple Payback, Start Date - + xml:lang="en">Engineering procurement and construction costs of the system. + xml:lang="en">Percent that the guarantee is willing to pay of the loss incurred, for example, may specify that 50% of the lost revenue will be paid. - - - - - + xml:lang="en">Project Early Buyout Options, Description + xml:lang="en">Regulatory FERC205 Application Approval Notice, Date + xml:lang="en">Project [Abstract] + xml:lang="en">Description of component maintenance status. - - - - + xml:lang="en">Effective date of the Local Incentive Contract. + xml:lang="en">Amount of energy lost due to curtailment based on major design/energy production model for emergencies or construction work.To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. - + xml:lang="en">Design Review Of Mechanical Report [Member] - + xml:lang="en">Module Accelerated Age Test Report [Abstract] + xml:lang="en">Table containing information about Energy Production insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + xml:lang="en">Description of scope of work to be performed by the subcontractor to the Asset Management Contract. - + xml:lang="en">Environmental Site Assessment I, Link + xml:lang="en">Availability Of Final Assignment And Assumption Agreement, Flag + xml:lang="en">Construction Contractor Notice Of Certification, Effective Date - + xml:lang="en">Installation Type [Abstract] + xml:lang="en">Amount of the title policy. + + xml:lang="en">Site Environmental Condition Bird Populations, Flag + xml:lang="en">Information about uncertainty measures used in preparing an IECRE certificate. - + xml:lang="en">Expiration date of the Permission To Operate Interconnection Approval. + xml:lang="en">Description of reported issue that requires resolution. + xml:lang="en">Information specific to Combiner products that are used in the system. - + xml:lang="en">Used as the identifier for Credit Support. + xml:lang="en">Used to group information about a single piece of equipment used in a system. xlink:type="arc"/> - + xml:lang="en">Incentive Assignment, Expiration Date - + xml:lang="en">Energy Contract, Price Per kWh + + + xml:lang="en">In the case of a purchase mortgage loan, the ratio obtained by dividing the original mortgage loan amount on the note date by the lesser of the mortgaged property appraised value on the note date or its purchase price. In the case of a refinance mortgage loan, the ratio obtained by dividing the original mortgage loan amount on the note date and the mortgaged property appraised value on the note date. In the case of a seasoned mortgage loan, if the Seller cannot warrant that the value of the mortgaged property has not declined since the note date, Freddie Mac requires that the Seller must provide a new appraisal value, which is used in the LTV calculation. Percentages below 6% or greater than 105% will be disclosed as 'Unknown,' indicated by a blank space. In the case of an FHA/VA mortgage loan, percentages less than 6% or greater than 110% will be disclosed as 'Unknown,' which will be indicated by a blank space. + xml:lang="en">Description of the operations manager spare parts strategy. + xml:lang="en">Names of counterparties to the Board Resolution for Master Lessee, Lessee and Operator. - - + xml:lang="en">Indicates if there are exceptions to the liability insurance certificate. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Information about equipment warranties related to specific devices in a system. + xml:lang="en">Permits And Assessments Review Utility Scale Interconnection Agreement [Member] - + xml:lang="en">Site Lease Access Agreement, Rate Type - - - - + xml:lang="en">Description of the sponsor performance guarantee type per the Operator Performance Guarantee. + xml:lang="en">Effective date of the Performance guarantee, which is provided by the operator or developer to guarantee a certain level of operating performance. + xml:lang="en">Power Purchase Agreement, Performance Guarantee, Percent + + xml:lang="en">Operations And Maintenance Contract, Contractor Performance Guarantee, Term - - + xml:lang="en">Operator Guarantee Exceptions, Description - - + xml:lang="en">Link to the Environmental Impact Report document. + xml:lang="en">Name of the author of the Environmental Site Assessment I report. + xml:lang="en">Items on the Independent Engineering Services Checklist regarding review of mechanical completion. + xml:lang="en">Contract Description + xml:lang="en">Link to the Estoppel Certificate Power Purchase Agreement document. + + xml:lang="en">Module Rated Voltage + xml:lang="en">Shared Facility Agreement Exceptions, Description + xml:lang="en">Location of the interconnection named as GPS coordinate or address, per the Interconnection Agreement, allowing the project company to distribute energy onto the electrical grid. + xml:lang="en">Availability Of Final Environmental Site Assessment I, Flag + + xml:lang="en">Preparer Of Renewable Energy Credit Performance Agreement, Name + xml:lang="en">Operations And Maintenance Contract, Cap on Liabilities + + + xml:lang="en">Counterparties To The Liability Insurance Certificate, Names + + xml:lang="en">Identifier for Lessee Collateral Agency Agreement. + xml:lang="en">Indicates if the Certificate of Final Completion is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Indicates if the portfolio is included as part of the fund. If it is used, TRUE; if it is not used, FALSE. + xml:lang="en">Renewable Energy Credit Contract Performance Guarantee, Percent + xml:lang="en">Company Name of the Engineering Procurement and Construction contractor on the contract. + xml:lang="en">Availability Of Substantial Completion Certificate, Flag - + xml:lang="en">Construction Monitoring Report [Abstract] + + + xml:lang="en">Environmental Impact Report [Abstract] + xml:lang="en">Nominal After Tax Internal Rate of Return (IRR) per the pricing model. + xml:lang="en">Indicates if the entity or counterparty is a Sponsor; if it is, TRUE; if it is not, FALSE. + + + xml:lang="en">Term of the performance guarantee. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Represents information about the Energy Contract rates. + xml:lang="en">Site Property Location Of Water Hookups, Description + + xml:lang="en">Term of the Renewable Energy Credit Contract Performance Guarantee. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Construction Monitoring Report, Link + xml:lang="en">Names of counterparties to the lien waiver. + + xml:lang="en">PV USA Test Condition [Member] + + + + + xml:lang="en">Description of curtailment ability and cap. + xml:lang="en">Rate at which performance data is collected, for example, seconds. + xml:lang="en">Availability Of Lien Waiver, Flag + + + + xml:lang="en">Renewable Energy Credit Contract Rate Escalator, Percent + + + xml:lang="en">Indicates if the inverter has a built-in meter. If it has a built-in meter, TRUE; if it does not, FALSE. + xml:lang="en">Power Purchase Agreement, Performance Guarantee, Initiation Date - + + + + xml:lang="en">Continuity of Operations Agreement, Parallel Monitoring Ongoing Monthly Fee, Amount + xml:lang="en">Expected system production at P75 which is the expected energy production reached with a probability of 75%. This element is used with the PeriodAxis to indicate the period of production. Usually this will be a year. + - + xml:lang="en">Type of design/energy production model for the PV system which could be Pvsyst, SAM, PV Watts, or Other. + xml:lang="en">Identifier for the Counterparty which is a grantor. + xml:lang="en">Zoning Permit Required, Flag + xml:lang="en">Entity Is Holding Company, Flag + xml:lang="en">Name of individual or organization providing the Credit Support. + - + xml:lang="en">Used to group information about a permit that is related to a natural resource located on a site. + xml:lang="en">Minimum rated DC voltage input of the inverter. - + xml:lang="en">Financial Contract For System, Escalator Percent + xml:lang="en">SCADA Systems [Abstract] + xml:lang="en">Site Property Occupancy Type + xml:lang="en">Operational Issues [Abstract] + xml:lang="en">Module Factory Audits Quality Management System Report [Member] + xml:lang="en">Phase of the Environmental Site Assessment report. + xml:lang="en">Inverter Continuous Power Rating At 40 Degrees Celsius, Amount + xml:lang="en">Items on the Independent Engineering Services Checklist regarding permits and assessments. + + + xml:lang="en">Document Identifier, Surety Bond Policy Insurance Policy + xml:lang="en">Design review of the Mechanical IFC (Industrial Foundation Classes) Drawings. + xml:lang="en">Indicates availability of the legal entity membership certificate. If available, TRUE; if not available, FALSE. + xml:lang="en">Indicates if the inverter is an MPPT inverter. The MPPT is a circuit (typically a DC to DC converter) used to maximize the energy available from the connected solar module arrays at any time during its operation. If it is an MMPT inverter, TRUE; if it is not, FALSE. + - + xml:lang="en">Indicates if the Master Purchase Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Operations And Maintenance Contract Performance Guarantee [Abstract] + + + xml:lang="en">Component To Be Replaced, Name + xml:lang="en">Date the IECRE certificate was issued. + xml:lang="en">Description of the Asset Management Contract. + xml:lang="en">Commercial General Liability Insurance [Table] + xml:lang="en">Effective pre tax equivalent internal rate of return per the pricing model. + + + + xml:lang="en">Availability Of Exceptions To The Membership Certificate Of Lessee, Flag + xml:lang="en">Actual Cost Of Penalties From Unavailability Cost Per kWh, Amount + xml:lang="en">Renewable Energy Credit Actual, Amount - - + xml:lang="en">Public Utilities Commission Approval, Description + xml:lang="en">Identifier for the obligor which is an SPV. + xml:lang="en">Indicates if the Interconnection Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + - + xml:lang="en">Company Responsible For Repair, Name + xml:lang="en">Description of any exceptions to the Equity Contribution Agreement or issues raised. + xml:lang="en">Rated DC voltage of the inverter. + xml:lang="en">Revenue Meter Rating, Continuous Voltage + + xml:lang="en">Reserve Account Number - - + xml:lang="en">Equity Contribution Agreement [Abstract] + xml:lang="en">Name of the Project Company entity created by the Limited Liability Company Agreement. + xml:lang="en">Description of any exceptions to the Funding Memo or issues raised. + - + xml:lang="en">Revenue Meter Operational Temperature Range, Maximum + xml:lang="en">Local Incentive Contract, Expiration Date + xml:lang="en">Availability Of Final Renewable Energy Credit Buyer Acknowledgement, Flag + xml:lang="en">City where site is located. + xml:lang="en">IECRE Model Factor [Abstract] - - + xml:lang="en">Pricing Model, Nominal After Tax Terminal Internal Rate Of Return, Percent + xml:lang="en">Optimizer Maximum Efficiency, Percent + + xml:lang="en">Inverter is at 75% power level. + xml:lang="en">Latitude and longitude at system entrance in degrees. Note that values reported for this concept are different than values reported for Latitude and Longitude at the revenue meter. - - + xml:lang="en">Link to permit + xml:lang="en">Names of counterparties to the Mechanical Completion Certificate. + xml:lang="en">Identifier for the cultural resource. + xml:lang="en">Financial Contract For System, Rate + xml:lang="en">Description of any exceptions to the Hedge Agreement or issues raised. + + + xml:lang="en">Amount of the gross purchase price for the total project per the pricing model. - + xml:lang="en">Module Short Circuit Current + xml:lang="en">Expected annualized loss due to irradiance incident angle on modules based on major design/energy production model used. + - - + xml:lang="en">Operations Manager [Table] - + xml:lang="en">Environmental Impact, Description + xml:lang="en">Expiration date of the Operations Manual. + xml:lang="en">Other administrative fees. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Entity Size, DC, Power + xml:lang="en">Indicates if the Membership Certificate of Lessee is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. - - + xml:lang="en">Product Identifier, Transformer [Abstract] + xml:lang="en">Environmental Site Assessment I, Expiration Date + + xml:lang="en">Information about the Independent Engineering Production Estimate report. + xml:lang="en">IECRE Insurance And Surety [Table] + xml:lang="en">Cut Sheet [Abstract] - + xml:lang="en">Link to the Pricing File document. - - - + xml:lang="en">Indicates if the Incentive Assignment is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Description of any exceptions to the Construction Loan Agreement or issues raised. + xml:lang="en">Information about the balance sheet included in the monthly operating report. + + xml:lang="en">Size of the entity in megawatts DC. + xml:lang="en">Expected annualized loss due to AC system efficiency based on major design/energy production model used. + + xml:lang="en">Description of the type of counterparty in the partnership flip. For example, trust. + xml:lang="en">Power Purchase Agreement, Invoices, Billing Contact, Email Address + xml:lang="en">Indicates if the inverter is Utility Interactive. If it is, TRUE; if it is not, FALSE. + + xml:lang="en">Power Rating In Weighted Efficiency Form, Flag + xml:lang="en">IECRE Certificate Holder - - + xml:lang="en">Counterparties To The Supplemental Report Review Of Insurance Review, Names + xml:lang="en">Lease Interest Payable, Amount - - + xml:lang="en">Availability Of Final Certificate Of Final Completion, Flag - - + xml:lang="en">Information about model and design factors relevant to the IECRE certificate. - - + xml:lang="en">Name of the company responsible for preparing the Electrical Inspection. + xml:lang="en">Expected amount of renewable energy credit. + xml:lang="en">Energy Production Model AC System Loss, Amount + xml:lang="en">Module Certifications [Abstract] + xml:lang="en">Represents 20:00 in 24 hour military time, 8:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Identifier for Notice Of Approval. + + + - + xml:lang="en">Length of the financial contract in months between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company. + xml:lang="en">Measured Energy To Weather Adjusted, Percent + xml:lang="en">Effective date of the Operations Manual. + xml:lang="en">Information about model factors used when working with IECRE certificates. + xml:lang="en">Inverter Power At Weighted Average Power Level [Member] - - + xml:lang="en">Description of any exceptions to the Incentive Assignment or issues raised. + xml:lang="en">Interconnection Agreement, Expiration Date - + xml:lang="en">Indicates if there is a recurring fee for the zoning permit. If there is a recurring fee, TRUE; if there is not, FALSE. - + xml:lang="en">Information about other expenses related to the site not included in other sections. - + xml:lang="en">Project Identifier [Table] + xml:lang="en">Indicates if the status of the spare parts level is sufficient or insufficient. + xml:lang="en">Information about the orientation of the sub array. - + xml:lang="en">The name of the entity involved in the system. + xml:lang="en">Indicates if there are exceptions to the Pledge Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + - + xml:lang="en">Represents an Equipment Class to describe warranties for various types of equipment used in the system or plant. Reported data can include term, start and end date, description of milestones. + xml:lang="en">Nameplate capacity in kWac of inverters for all projects in the fund. + xml:lang="en">Information about the approvals needed for a financing event. - + xml:lang="en">Expiration date of the Insurance Consultant Report. + xml:lang="en">Description of any exceptions to the Advisor Invoices or issues raised. - + xml:lang="en">Issues During Construction, Security Issues, Description - - + xml:lang="en">Insurance Rebate Program, Description + + xml:lang="en">Module Accelerated Age Test Report, Link + xml:lang="en">SCADA Systems Manufacturer, Contact Name and Title + xml:lang="en">Closing Indemnity Agreement, Effective Date + xml:lang="en">Link to the Hedge Agreement document. - - + xml:lang="en">Name of the individual receiving the funds. + xml:lang="en">Identifier for Casualty Insurance Policy. - - + xml:lang="en">Used as the identifier for the portfolio. + xml:lang="en">Amount of payment to tax-equity investors in the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. - - + xml:lang="en">Indicates if the Assignment and Assumption Agreement is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Used to group a listing of information about the role of employees. + + + + + xml:lang="en">Inverter Disconnection Type, Description + xml:lang="en">Site Control, Number Of Sites + xml:lang="en">Period Month May [Member] + xml:lang="en">Name of the company responsible for preparing the Credit Report Documents. + xml:lang="en">Asset Manager, Federal Tax Identification Number + xml:lang="en">Independent Engineering Services Checklist Module Factory Audits [Member] + xml:lang="en">Project Renewable Energy Credit Offtake Agreement, Flag + xml:lang="en">Data Acquisition Systems, Number Of Units + + + xml:lang="en">Link to the Breakage Fee Agreement document. + xml:lang="en">Tracker Azimuth + xml:lang="en">Effective date of the Lessee Collateral Agency Agreement. + xml:lang="en">Maximum amount of current that the optimizer can output. - + xml:lang="en">Use to group a listing of information about a Financing Event. + xml:lang="en">Availability Of Exceptions To The UCC Security Agreement, Flag + + + xml:lang="en">IECRE certificate number, defined as sector(PV, wind, marine).year.IECREOperativeDocument.uniquesystemid.certificatenumber. For example AAAA.YYYY.OD4XX.PPPPP.CCCCC.AAAA. - - + xml:lang="en">Other Unique Underwriting Structure, Description + xml:lang="en">Operations And Maintenance Manual [Abstract] + xml:lang="en">Maximum operating temperature of the solar module. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + + + xml:lang="en">Data Acquisition Systems Manufacturer, Name + xml:lang="en">Other Permits Type, Description + + + + xml:lang="en">Component Maintenance Actions [Axis] + xml:lang="en">Name of the sponsor who brings the project to the bank. + xml:lang="en">Other Expenses Cost Per Watt - - + xml:lang="en">Fund Nameplate Capacity Inverters, Power + xml:lang="en">Operations Manual, Link + xml:lang="en">Sale Leaseback, Contract Term + xml:lang="en">Indicates if credit support is for the Engineering Procurement and Construction Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Expiration date of the Building Inspection. + xml:lang="en">Information about sale leasebacks. + xml:lang="en">Project company tax ID number. + + xml:lang="en">Source of Funds [Line Items] - + xml:lang="en">Names of counterparties to the Advisor Invoices. + xml:lang="en">Pro Forma [Abstract] - + xml:lang="en">Description of the Reportable Environmental Condition. + xml:lang="en">Document Identifier, Closing Indemnity Agreement + + + xml:lang="en">How To Access Site, Description + xml:lang="en">Lessee Security Agreement, Link + xml:lang="en">Inverter Firmware Version Tested, Name - + xml:lang="en">Operations And Maintenance Cost Per Watt + xml:lang="en">System, Grid Charging Capability, Flag + xml:lang="en">Certificate Of Acceptance Report, Link + + + xml:lang="en">Operations And Maintenance Contract Payment Method, Description + + xml:lang="en">Number of systems in a fund. + - + xml:lang="en">Indicates if the module factory audit report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Review By Contractor Of Asset Management Including Infrastructure [Member] - - + xml:lang="en">Membership Certificate Of Lessee Exceptions, Description + xml:lang="en">Phone number of the primary Operations And Maintenance subcontractor. + xml:lang="en">Table containing information about Workers Compensation insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + xml:lang="en">Information about the entity that controls the site. + + xml:lang="en">Site Lease Access Agreement, Counterparty + xml:lang="en">Inverter Testing Requirements [Abstract] + xml:lang="en">Casualty Insurance [Line Items] + xml:lang="en">Operations And Maintenance Contractor, Guaranteed Output, Power + + xml:lang="en">Indicates if the Asset Management Contract is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Amount for the electricity expense for the utility company where the grid connection will reside. - - - - + xml:lang="en">Module Factory Audit Report [Abstract] + xml:lang="en">Model Factors Non Unity Power Factor, Flag + xml:lang="en">Monthly Operating Report Preparer, Name + xml:lang="en">Legal Entity Articles of Organization Availability, Flag + xml:lang="en">Indicates if the entity or counterparty is Other; if it is, TRUE; if it is not, FALSE. + xml:lang="en">Credit Support [Abstract] + - - + xml:lang="en">Asset Manager Performance By Geography [Abstract] - - + xml:lang="en">Used to relate a given entity identifier with a given system identifier. + xml:lang="en">Duration of the credit support term. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Certificate Of Acceptance Report, Effective Date - + xml:lang="en">Information about the performance guarantee by the developer over the portfolio. + xml:lang="en">State Tax Credit Portion Units + + xml:lang="en">Zoning Permit And Covenants [Abstract] + xml:lang="en">Meter Revenue Grade, Flag + + xml:lang="en">Entity Size, Megawatts + xml:lang="en">Capacity Factor, Ratio + xml:lang="en">Test Condition Ambient Temperature + xml:lang="en">First year output in megawatt hours (MWh) divided by megawatt hours at peak (MWp), pre-availability and curtailment. + xml:lang="en">Description of the performance guarantee. + xml:lang="en">Type of financial transaction which can be Credit Applied, Customer Payment, Customer Bill, Credit, Expected Prepayment, Expected Rebate, Fund Rebate, Operating Expenses, Lease Management Fee, PPA Operations and Maintenance, Lease Operations and Maintenance, PPA Miscellaneous Expenses, PPA Management Fee, Lease Miscellaneous Expenses, Lease Insurance, PPA Insurance, PPA Transaction Manager Fee, Lease Transaction Manager Fee, Customer Prepayment, ACH Settlement Credit, Principal Cash Paid to Beneficiary, Contribution to Principal Cash, Book Transfer Debit, Teller Deposit Credit, Book Transfer Credit, or Remote Deposit Credit. + xml:lang="en">Hypothetical Liquidation at Book Value Balance, Amount - + xml:lang="en">Name of the company responsible for preparing the Operations and Maintenance Subcontractor Contract. + xml:lang="en">Site review of archeological, cultural and local community impact. + - - + xml:lang="en">Zoning Permit Termination Details [Line Items] + xml:lang="en">Level of severity of the recent project event, which can be Low, Moderate, or High. + xml:lang="en">Percentage of kWh lost due to snow based on typical meteorogical month, calculation based on major design/energy production model used. + xml:lang="en">Fund Closing, Date + xml:lang="en">Site Climate Classification IECRE, Description + xml:lang="en">Letter of Credit, Security, Amount + + xml:lang="en">Indicates availability of the legal entities certificate of organization. If available, TRUE; if not available, FALSE. + xml:lang="en">Description of the operational center managed by the operations manager. + xml:lang="en">Contact individual for Power Purchase Agreement notices. + + + + xml:lang="en">Site Lease Memo [Abstract] + xml:lang="en">File type of the geospatial boundary information file which can be GEOJson, Shapefile, KML, or GML. + xml:lang="en">Rent payment. + xml:lang="en">Inverter Power At 20 Percent Power Level [Member] + + + - + xml:lang="en">Represents the time period of the third quarter. Used for this quarter of any year. + xml:lang="en">Inverter Efficiency At Vmin, Percent + xml:lang="en">Maintenance cost of combiner box with no warranty.($/Year-kWdc) + xml:lang="en">Availability Of Exceptions To The Monitoring Contract, Flag + xml:lang="en">Name of the obligee (beneficiary) of the surety. - + xml:lang="en">Credit Support Type, Description + xml:lang="en">Host Acknowledgement Exceptions, Description + xml:lang="en">Expected flip period for the partnership based on getting the average amount of expected output. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Inverter [Member] + + xml:lang="en">Permits And Assessments Review Environmental Site Assessment [Member] + xml:lang="en">Property Tax Exemption Opinion, Link - - + xml:lang="en">Counterparties To The Wiring Instructions, Names + xml:lang="en">Financial Performance Ratios [Abstract] + - - + xml:lang="en">Information about the operational event or incident report. + xml:lang="en">Power Purchase Agreement, Production Guarantee, Energy + + xml:lang="en">Document Identifier, Guarantee Agreement + xml:lang="en">Site, Parcel Identifier + xml:lang="en">Residual Value Assumption at Underwriting, Amount + xml:lang="en">Cross Default Pool for Limited Liability Company Agreement, Flag - + xml:lang="en">Expected annual AC capacity degradation on the project-level in the first year based on major design/energy production model used. + - - + xml:lang="en">Name and title of contact on the Operations And Maintenance contract + xml:lang="en">0 + xml:lang="en">Partnership Flip Expiration Date - + xml:lang="en">Zoning Permit Documents, Link + xml:lang="en">Actual Renewable Energy Credit Revenue To Expected REC Revenue, Inception To Date, Percent + xml:lang="en">Expiration date of the Master Lease. - - + xml:lang="en">Indicates if there are exceptions to the Breakage Fee Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Items on the Independent Engineering Services Checklist regarding operational budget review. - - - + xml:lang="en">Operations And Maintenance Manual, Link + xml:lang="en">Term of the surety warranty bond. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Equipment review of Generation Step-up Transformers. + xml:lang="en">Represents information related to a Parent Company explaining its relationship to the special purpose vehicle and other subsidiaries. + xml:lang="en">Pro Forma, Assumed Annual Insurance Escalator, Percent + + xml:lang="en">Tax Opinion, Effective Date + xml:lang="en">Measured Average Weather Adjusted Energy Production For Period + xml:lang="en">Link to the Assignment Of Interest document. + xml:lang="en">Used to group a listing of information about letters of credit. + xml:lang="en">OffTaker Name + xml:lang="en">Availability Of Site Lease Memo, Flag + xml:lang="en">Equipment Type Warranty, Term - - + xml:lang="en">Temperature of the PV module at a point in time. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Identifier for LLCA Agreement. - - + xml:lang="en">Tax basis in amortization class, as percent of appraised value + xml:lang="en">Information about the Environmental Impact Report which explains the environmental impact of the installation on the site. + xml:lang="en">Availability Of Final UCC Security Agreement, Flag + + xml:lang="en">Indicates if there are exceptions to the Project Administration Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Table represents information about equipment supply agreements. + xml:lang="en">Identifier for the energy budget related to a site. - - - - + xml:lang="en">System Production [Table] + xml:lang="en">Indicates if there are exceptions to the Local Incentive Contract or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Time stamp indicating the first day of the IEC 61724-2 test, administered under OD-401 or OD-402. + xml:lang="en">Termination date of the Master Services Agreement. + xml:lang="en">Number of times per year equipment must be washed. + xml:lang="en">Identifier for Title Survey. + xml:lang="en">Effective date of the Supplemental Report Review Of Insurance Review. + xml:lang="en">Preparer Of Environmental Assessment II, Name + xml:lang="en">Interconnection Agreement, Point Of Interconnection + xml:lang="en">Availability Of Final Hedge Agreement, Flag + + xml:lang="en">Description of the product, for example, 250 W Utility Interactive Microinverter. + + xml:lang="en">Indicates if there are exceptions to the Other Equipment Due Diligence Reports. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Inverter Input Battery Continuous Power DC, Amount + xml:lang="en">Energy Production Estimate Of Load Study [Member] + xml:lang="en">Asset Manager Megawatt Under Management, Number - - + xml:lang="en">Certificate Of Final Completion, Effective Date + xml:lang="en">Effective date of the Equity Contribution Agreement. + xml:lang="en">Information about the Closing Indemnity Agreement which explains indemnification between managing member and other members of the LLC. - + xml:lang="en">Warranties Review SCADA Systems Meters [Member] - - + xml:lang="en">Description of the location of consumables which are items such as fuses that are used up quickly and must be replenished. + xml:lang="en">Indicates whether the employee role was on a fund or a project. - + xml:lang="en">Tracker, Number of Controllers + xml:lang="en">IECRE Predicted Performance Data [Abstract] + xml:lang="en">Counterparties To The Board Resolution For Master Lessee, Lessee and Operator, Names - - + xml:lang="en">Site Lease Memo, Expiration Date + xml:lang="en">Energy Budget Version, Description + xml:lang="en">Availability Of Final Supplemental Report Review Of Local Tax Review, Flag + xml:lang="en">Upfront mobilization Fee for Parallel Monitoring Contract per the Continuity of Operations Agreement which is the plan for the installation going forward including contingencies which may be triggered by financial performance. + + xml:lang="en">Liability Insurance Certificate, Expiration Date - - + xml:lang="en">Ambient temperature during the test condition. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. - - + xml:lang="en">Initiation date of the Renewable Energy Credit contract performance guarantee. + xml:lang="en">Description of the enclosure for the revenue meter, for example NEMA 3 R type. + xml:lang="en">Snow Model Factor, Typical Met Year, Percent + xml:lang="en">Password And Identification To Access Installation Or Equipment, Description + + + xml:lang="en">Availability Of Final Building Inspection, Flag - - + xml:lang="en">Description of scope of work of the Engineering Procurement and Construction subcontractor. + xml:lang="en">Ongoing Monthly Fees for Parallel Monitoring Contract per the Continuity of Operations Agreement which is the plan for the installation going forward including contingencies which may be triggered by financial performance. + xml:lang="en">Expiration date of the Tax Indemnity Agreement. + xml:lang="en">Cultural Resource Permit Action [Line Items] - - + xml:lang="en">Information about developer performance guarantees for the project or the portfolio. + xml:lang="en">Continuity of Operations, Escrow Account Details, Description + xml:lang="en">Description of early buy out options. + xml:lang="en">Tax Equity Cash Distributions, Amount + - + xml:lang="en">Assignment Of Interest, Expiration Date + xml:lang="en">Project Is Levered, Flag + xml:lang="en">Description of most important strength of the fund. + xml:lang="en">Used to group information about a natural resource on a site. + xml:lang="en">Maximum amount of voltage that can be safely handled by the module, determined by IEC (International Electrotechnical Commission). - - - + xml:lang="en">Name of the recipient of the state tax credit. - - + xml:lang="en">Information about the site. - - + xml:lang="en">Information about Casualty insurance. + xml:lang="en">Date on which FERC 205 application was submitted. + xml:lang="en">Preparer Of Mechanical Completion Certificate, Name + xml:lang="en">Battery equipment. + xml:lang="en">Contract Review Other Contracts [Member] - - + xml:lang="en">Description of the operations manager reporting plan, for example monthly operating reports, establishing a reporting portal. + xml:lang="en">Sponsor Reporting Requirements, Description + xml:lang="en">The Investment Tax Credit-eligible amount for the plant. - + xml:lang="en">Information about the roof. + xml:lang="en">Date the operations of the entity commenced which is when interconnection is made and electricity starts flowing onto the grid, may also be called Operations Commenced Date. + xml:lang="en">Description of general requirement for Property Insurance. + xml:lang="en">Accounts Receivable Aging [Axis] - + xml:lang="en">Used to group information about operational events. - - - + xml:lang="en">Minimum operating temperature of the combiner box, the mechanism that brings together multiple solar strings. This is used in a product specification to indicate the operating temperature of the combiner box. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. - - + xml:lang="en">Description of the type of bank account, for example, operating, lockbox, reserve, accrual. - - + xml:lang="en">Version of firmware for the inverter that has been tested, for example, A.4.0.B, B.4.2.2, C.2.0.0. - - - + xml:lang="en">Used as the identifier for Asset Managers. + xml:lang="en">Amount required to be prefunded in the reserve for the project or fund. + xml:lang="en">Name of individual or organization receiving the Credit Support. + xml:lang="en">State tax credit in currency per kWh. + xml:lang="en">Power Purchase Agreement, Limitation Of Liability, Description - - + xml:lang="en">Asset Management Contract, Rate Escalator, Percent + xml:lang="en">Use of Funds, Amount + xml:lang="en">Availability Of Exceptions To The Term Loan, Flag + xml:lang="en">Second line of the address where project is based. + + xml:lang="en">Description of protection mechanism. - - + xml:lang="en">Identifier for Master Purchase Agreement. + xml:lang="en">Preparer Of Master Services Agreement, Name + xml:lang="en">Used as the identifier for actions taken related to components requiring maintenance related to the system. + xml:lang="en">Power Purchase Agreement Amendment, Execution Date + + xml:lang="en">Expected PV Production At P95, Energy - - - - + xml:lang="en">Effective date of the notice of approval. + xml:lang="en">Preparer Of Operations And Maintenance Manual, Name + xml:lang="en">Funding Memo, Effective Date - + xml:lang="en">Data Acquisition System Communication Protocol + xml:lang="en">Portfolio Level Legal Entity, Flag + xml:lang="en">Purchase price per unit of energy (i.e. 1 kWh) generated by the system. + xml:lang="en">Equity Contribution Guarantee, Effective Date + + + xml:lang="en">Future Surplus Cash to Developer, Estimate + + - - + xml:lang="en">The longitude of the system at the system entrance. The value should be entered in decimal degrees. - - + xml:lang="en">Effective date of the Other Equipment Due Diligence Reports. + xml:lang="en">Bank internal code for the Special Purpose Vehicle. + xml:lang="en">Name of the counterparty to the transaction related to the fund. + xml:lang="en">Project Renewable Energy Certificates, Flag + xml:lang="en">Description of the type of FERC regulation that applies to the power plant based on its capacity. + xml:lang="en">Description of standard method used to calculate uncertainity of measurement + xml:lang="en">Used to identify information about the Engineering Procurement and Construction Contract. + + + xml:lang="en">Indicates if there is security interest in the Limited Liability Company Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">A line item used to identify the fund. This must use the identifier defined on the FundIdentifierAxis. + xml:lang="en">Indicates whether the project is distributed generation or utility scale. + xml:lang="en">Information about the performance of the system. + xml:lang="en">Review By Contractor Of Operations And Maintenance [Member] + xml:lang="en">Amount of the insurance payment received. + xml:lang="en">Energy Contract Hourly Rate, Hour 23 [Member] + - + xml:lang="en">Identifier for LLC Formation Documents. + xml:lang="en">Represents information about studies conducted on a site-specific cultural resource which is defined as places of archeological, historical or cultural of significance, for example, an historic preservation site, burial ground, place of current or former worship, etc. Related information can include name of the preparer and the study, as well as link to the study. - - + xml:lang="en">Indicates if credit support is for the Hedge Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Temperature of reference cell used for the model. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. - - + xml:lang="en">Indicates if the Mechanical Completion Certificate is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Environmental Impact Report, Expiration Date + - - + xml:lang="en">Used to group information included in the Independent Engineering Services Checklist. - - + xml:lang="en">Availability Of Final LCC Registration, Flag + xml:lang="en">Used to group information about maintenance actions taken on components related to the system. + xml:lang="en">Loan-to-Value (LTV) Ratio, Source + xml:lang="en">Product Identification, Model + + + + xml:lang="en">Description of any exceptions to the Co Tenancy Agreement or issues raised. + xml:lang="en">Document Identifier, Monitoring Contract + xml:lang="en">Explains how the battery is coupled with the system which can be DC-coupled or AC-coupled. - + xml:lang="en">Project Administration Agreement Exceptions, Description + xml:lang="en">Utility, Email Address - + xml:lang="en">Availability Of Exceptions To The Certificate Of Acceptance Report, Flag + xml:lang="en">Availability Of Exceptions To The Host Acknowledgement, Flag + xml:lang="en">Design Review Of Structural Report [Member] + + xml:lang="en">Indicates if the Site Lease Assignment is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Revenues, Estimate - - + xml:lang="en">Identifier for Master Lessee Security Agreement. + xml:lang="en">Description of the firmware version of the device. + + + xml:lang="en">Site Natural Disaster Risk, Description - - + xml:lang="en">Table containing information about liability insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + xml:lang="en">Term of the parallel monitoring contract in years per the Continuity of Operations Agreement which is the plan for the installation going forward including contingencies which may be triggered by financial performance. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. - - + xml:lang="en">Monthly fees for backup Operations and Maintenance Contract. + xml:lang="en">InvestmentMemo + + xml:lang="en">Expiration date of the Shared Facility Agreement. xlink:type="arc"/> + xml:lang="en">Effective date of the Substantial Completion Certificate. + xml:lang="en">Asset Management Cost Per Watt + xml:lang="en">Battery, Rating + + + xml:lang="en">Module Cell [Abstract] + + + xml:lang="en">ZIp Code where the entity is based. + xml:lang="en">Source of Funds, SPV Identifier + xml:lang="en">Name of the company responsible for preparing the Board Resolution For Master Lessee, Lessee And Operator. + + + xml:lang="en">Name of the company responsible for preparing the Approval Notice. + xml:lang="en">Availability Of Exceptions To The Independent Engineering Opinion Report, Flag + xml:lang="en">Entity Size, Storage, Power - + xml:lang="en">Used as the identifier for the Energy Budget. + xml:lang="en">Present Value of the project. + xml:lang="en">Total Curtailment Model Factor, Percent + xml:lang="en">Period Month January [Member] + xml:lang="en">System Performance, DC Input Voltage - - + xml:lang="en">Partnership Flip, P99 Flip Period + xml:lang="en">Component Maintenance Cost (Under Warranty) DAS SCADA Telecomm, Amount + xml:lang="en">Availability Of Pricing File, Flag + xml:lang="en">Engineering, Procurement and Construction [Abstract] + xml:lang="en">Represents information about an energy OffTaker which could be a utility, a residential homeowner or other party. + xml:lang="en">Number of units of the Local Incentive Contract. - - + xml:lang="en">Module Has Certification IEC61701, Flag + xml:lang="en">Date and time issue resolved. + xml:lang="en">Approvals [Axis] + - - + xml:lang="en">Percent remaining to be completed on maintenance of component. - - + xml:lang="en">Method of compensation for energy produced by solar installation, for example, net energy metering, feed-in tarriff. + xml:lang="en">Availability of Final Independent Engineering Production Estimate Report, Flag + xml:lang="en">Module Maximum Series Fuse Rating, Amps - - - + xml:lang="en">Deadline date for Power Purchase Agreement payment. + xml:lang="en">Description of the type of interconnection agreement type allowing the project company to distribute energy onto the electrical grid, for example, distributed generation, small or large. - - + xml:lang="en">Cultural Resource Permit, Governing Authority, Name + xml:lang="en">Cash Distribution [Axis] + xml:lang="en">Date on which FERC 203 application was submitted. - + xml:lang="en">Indicates if the Lessee Security Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Name of the company responsible for preparing the Bill Of Sale. + xml:lang="en">Site review of endangered species. + xml:lang="en">Natural Resource Permit Action [Axis] - + xml:lang="en">Equipment review of Communication Infrastructure. - - + xml:lang="en">Source of Funds [Table] + xml:lang="en">Maximum operating temperature of the revenue meter. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Inverter General Data [Abstract] - - + xml:lang="en">Funding Memo Exceptions, Description + xml:lang="en">Indicates if the cultural resources and archeological report has been reviewed. If it has been reviewed, TRUE; if it has not been reviewed, FALSE. + xml:lang="en">Lease [Abstract] + xml:lang="en">Component Maintenance Cost (No Warranty) Inverter, Amount + xml:lang="en">Parent Guarantee [Abstract] - - - + xml:lang="en">Notes about the independent engineering services report. - + xml:lang="en">Indicates if the econological/wildlife/plant life report has been reviewed. If it has been reviewed, TRUE; if it has not been reviewed, FALSE. + xml:lang="en">Name of the company responsible for preparing the Operations Manual. + xml:lang="en">The aggregate costs related to asset management during the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Operational Issues, Date And Time Individual Issue Resolved - + xml:lang="en">Renewable Energy Credit [Abstract] - + xml:lang="en">Site Environmental Condition High Insolation, Flag - + xml:lang="en">IECRE Insurance And Surety [Line Items] + xml:lang="en">IECRE Comparison Data [Abstract] + xml:lang="en">Description of the inverter cooling system. + xml:lang="en">Loan number for the first loan made. + xml:lang="en">Information about the master lease. + xml:lang="en">Renewable Energy Credit Actual, Inception To Date, Amount + xml:lang="en">Information about performance ratios used in developing an IECRE certificate. - + xml:lang="en">Name of the company responsible for preparing the Universal Insurance Policy. - - + xml:lang="en">Link to the Site Lease Memo document. + xml:lang="en">Other Permits [Axis] + + + xml:lang="en">Pledge Agreement Exceptions, Description + + xml:lang="en">Amount of the balance on the mortgage. + xml:lang="en">Entity Country - - + xml:lang="en">Status report on Project Description. + xml:lang="en">Pricing Model, Federal Income Tax Rate Assumption, Description + xml:lang="en">Description of the type of project. - + xml:lang="en">Initiation date of the Operations and Maintenance contract. + xml:lang="en">Link to the documentation URI for the Data Acquisition System. - - + xml:lang="en">Frequency of the revenue meter per manufacturer specification. + + xml:lang="en">Description of rebate type. + xml:lang="en">Represents information about historical instances of financial transactions related to a fund but not to a specific system within the fund. + xml:lang="en">Name of the company responsible for preparing the Wiring Instructions. + xml:lang="en">Indicates if there are exceptions to the Assignment of Interest or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Indication as to whether a zoning permit is required. + + xml:lang="en">Counterparties To The Advisor Invoices, Names + + + xml:lang="en">Indicates if the Funding Memo is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of the contribution, for example, 45% of funding provided for XYZ project. - + xml:lang="en">Operational temperature of the revenue meter. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Credit Support, End Date + xml:lang="en">Amount the partners would receive if the partnership were liquidated at book value at the end of each measurement period. + + xml:lang="en">Use of Funds [Line Items] + xml:lang="en">Energy Contract Hourly Rate, Hour 17 [Member] + xml:lang="en">Link to the Building Inspection document. - - - + xml:lang="en">PV Installation Engineering and Design Cost, Amount + xml:lang="en">Information about the system related to the IECRE certificate. + + + xml:lang="en">Expiration date of the Qualifying Facilities Self Certification. + xml:lang="en">Surplus cash applied to collateral account, actual or forecast. Values reported as forecast should use the StatementScenarioAxis. - - + xml:lang="en">Name of the counterparty to the transaction related to the system. + xml:lang="en">Environmental Site Assessment, Description - - + xml:lang="en">Property Tax Exemption Opinion, Expiration Date + xml:lang="en">Link to the proof of approval. + xml:lang="en">Description of counterparty tax obligations in the Power Purchase Agreement. - - + xml:lang="en">Description of developer staffing, for example, number and titles of staff versus number and qualifications of subcontractors. Qualifications can include location and safety record. + xml:lang="en">Axis for reporting multiple events that occur associated with the ongoing operations of the project. Each typed member represents a specific reporting event. Each member represents a unique event that occurs. These events may or may not be covered by an agreement, such as agreements for Operations and Maintenance, Interconnection, Asset Management, EPC, Site Lease, LLCA, PPA or Lease. + xml:lang="en">Names of counterparties to the Certificates of Insurance. + + + xml:lang="en">Required amount of the fund set aside by project company for working capital account. + + + xml:lang="en">Indicates if there are exceptions to the Co Tenancy Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Project Administration Agreement, Link + xml:lang="en">Electricity Expense, Amount + xml:lang="en">Power Purchase Agreement, Host Company To Receive Notices + xml:lang="en">Availability Of Final Master Lease, Flag + xml:lang="en">Indicates if interest is recorded for security interests. If it is recorded, TRUE; if not, FALSE. + xml:lang="en">Equipment Manufacturer Details Address Zip Code + xml:lang="en">Credit Support Amount Details [Line Items] + xml:lang="en">Termination Value, Amount + xml:lang="en">Represents information used to evaluate an operations manager, for example number of megawatts and projects under management, states where the manager has operated, production statistics by state, NERC and FERC qualifications, as well as description of strategies for reporting, continuity programs, supply, remediation, insurance policies and REC accounting. + + + xml:lang="en">Approvals Status + + + xml:lang="en">Periodic Budget [Table] + + + xml:lang="en">Site review of roof condition. + xml:lang="en">Identifier for Property Insurance Certificate Agreement. + + + + + + + xml:lang="en">Cost to wash an individual module. + + + xml:lang="en">Information about the security for the project site. + xml:lang="en">Indicates if the Exposure Report is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Solar Array [Line Items] + xml:lang="en">Indicates if there are exceptions to the Advisor Invoices or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Bill Of Sale, Expiration Date + xml:lang="en">Indicates if the Renewable Energy Credit Offtake Agreement is available. If it is available, TRUE; if it is not available, FALSE. - + xml:lang="en">Description of the system quality. + xml:lang="en">Estoppel Certificate Power Purchase Agreement, Link + xml:lang="en">Amount of the Investment Tax Credit or grant received per the pricing model. + + + + + xml:lang="en">Financial Summary By System [Line Items] + xml:lang="en">Site review of hazardous waste on-site. + xml:lang="en">Source of Loan to Value ratio if not calculated. + xml:lang="en">Power expected for capacity measurement when executing IEC 61742-2 for the specified target conditions. + xml:lang="en">Renewable Energy Credit Contract Performance Guarantee, Expiration Date + xml:lang="en">Operational Event Reporting Details [Line Items] + + + xml:lang="en">Approval Condition Action, Description + xml:lang="en">Ecological Report Reviewed, Flag + xml:lang="en">Used to group a listing of information about the approvals for a financing event. + xml:lang="en">Indicates if there are exceptions to the Closing Certificate or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Permission to Operate (PTO), Date + xml:lang="en">Indicates if the Environmental Impact Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Information about the IECRE Certificate for the system. + + + xml:lang="en">Availability Of Final Operations And Maintenance Contract, Flag - + xml:lang="en">Preparer Of Pricing Model Report, Name + xml:lang="en">Availability Of Final Approval Notice, Flag + xml:lang="en">Description of developer's experience in various Independent System Operator (ISO) regional energy markets. + xml:lang="en">Document Identifier, Term Sheet + + + + + xml:lang="en">Monthly Operating Report Accounts Receivable Aging [Abstract] + xml:lang="en">Inverter Communication, Description + xml:lang="en">Ambient temperature of the site on a given date based on major design/energy production model used. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. - - - + xml:lang="en">Description of start date milestone, for example, delivery of the equipment at the site. - + xml:lang="en">Name of the company responsible for preparing the Lessee Claim Documents. + xml:lang="en">Name of the guarantor. + xml:lang="en">Site Review Of Roof Condition [Member] + xml:lang="en">First line of the address of the site. + xml:lang="en">Developer Performance Guarantee [Abstract] + xml:lang="en">Contact name for the utility company where the grid connection will reside. + xml:lang="en">Expiration date of the Power Purchase Agreement Amendment. + xml:lang="en">IECRE Certificate Time Stamp, Date + xml:lang="en">Indicates if the funding proposal request is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Identifier for Operations and Maintenance Agreement. + xml:lang="en">Engineering, Procurement and Construction Subcontractor Scope of Work, Description + xml:lang="en">Interest Rate On Overdue Payments, Rate - - + xml:lang="en">Maintenance cost of racking tracker with no warranty. + xml:lang="en">Document Identifier, Supplemental Report Review Of Insurance Review + + + xml:lang="en">Inverter is Part of ACPV Module, Flag - + xml:lang="en">Description of any action that will be taken to remedy issues with the Reportable Environmental Condition. + + xml:lang="en">Link to the Qualifying Facilities Self Certification document. + xml:lang="en">Actual amount of renewable energy credit from inception to date. - + xml:lang="en">Indicates if the Local Incentive Contract is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Power Purchase Agreement, Performance Guarantee, Expiration Date + xml:lang="en">Site Property Geospatial Boundary, Description + xml:lang="en">Counterparties To The UCC Tax Lien and Judgment Lien Searches, Names - + xml:lang="en">Security Transportation Expense, Amount + xml:lang="en">Commitment Agreement, Expiration Date + xml:lang="en">Soil In Site Report Available, Flag + + + xml:lang="en">Maintenance cost of balance of system (BOS) with no warranty. BOS includes everything in addition to solar panels and inverters. + xml:lang="en">Reserve Structure, Description - - + xml:lang="en">Availability Of Exceptions To The Environmental Site Assessment II, Flag + xml:lang="en">Weather source used for the model which can be None, Local, Satellite, Modeled, or Mixed. + xml:lang="en">OffTaker Name - - + xml:lang="en">Represents the time period of the fourth quarter. Used for this quarter of any year. + xml:lang="en">Table used to capture the production statistics of a system including the forecasted and expected production as well as the actual production. + xml:lang="en">Indicates if the Construction Monitoring Report is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Used to group information about the site lease memos related to the site. + xml:lang="en">Inverter Monitoring, Description + xml:lang="en">Actual measured insolation divided by weather adjusted insolation. + xml:lang="en">Measured Insolation To Weather Adjusted Insolation, Inception To Date, Percent + xml:lang="en">Appraisal Input, Engineering Procurement and Construction Fee, Amount + + xml:lang="en">Target Balance [Axis] + xml:lang="en">Financial Summary By System [Table] + xml:lang="en">Site Environmental Condition Pollen, Flag + xml:lang="en">Link to the Certificate Of Completion document. + xml:lang="en">Description of the type of module performance warranty. For example, duration of the warranty, guaranteed output. + xml:lang="en">Certificate Of Formation For Master Lessee, Lessee And Operator, Expiration Date - + xml:lang="en">Unique Identifier used to identify the subarray + xml:lang="en">Name of the company responsible for preparing the Assignment Of Interest. + xml:lang="en">Purchase date of the device. - - - - + xml:lang="en">Monthly Operating Report, Link + xml:lang="en">Indicates availability of the legal entity operating agreement. If available, TRUE; if not available, FALSE. - + xml:lang="en">Preparer Of Site Lease, Name + xml:lang="en">Information about details for the site. + xml:lang="en">Other Permits Details [Line Items] - + xml:lang="en">Module has Certification IEC61701, salt mist corrosion resistance testing on PV modules. If it does, TRUE; if it does not, FALSE. - + xml:lang="en">Financial Transaction For System, Amount + xml:lang="en">Power Purchase Agreement, Contract Terms [Abstract] + + - - + xml:lang="en">Document Identifier, Lease Contract For Project + xml:lang="en">Loss Factor Details [Line Items] + xml:lang="en">Breakage Fee Agreement, Effective Date + xml:lang="en">Expiration date of the Closing Certificate, which documents that the project has been funded and includes supporting information about the lease.. + xml:lang="en">Information about the Notice and Payment Instructions. + + + xml:lang="en">Other costs associated with the system implementation. + + + xml:lang="en">Business Interruption Insurance [Table] + xml:lang="en">Preparer Of Funding Proposal Request, Name + + + xml:lang="en">Availability Of Environmental Site Assessment I, Flag + xml:lang="en">Financing Structure, Description + + xml:lang="en">Information about the design attributes. + xml:lang="en">Collateral account balance, estimate made at start of project. + + + xml:lang="en">Identifier for Workers Compensation Insurance Policy. + + + + xml:lang="en">Comment about a fund. - - + xml:lang="en">Name of the organization certifying the product. + + xml:lang="en">Standard & Poors cedit rating of the entity. + xml:lang="en">Projected Offtaker Electric Savings to Utility, Amount + xml:lang="en">Master Purchase Agreement, Expiration Date + xml:lang="en">Email address of the Obligee to the surety bond. - + xml:lang="en">Name of the company responsible for preparing the Insurance Consultant Report. + xml:lang="en">Describes status of regulatory approval received for FERC 203 which can be Not Submitted, Submitted, Approved, or Declined. + xml:lang="en">Line items represent information about a specific entity. + + + xml:lang="en">Availability Of Exceptions To The Certificate Of Completion, Flag + + xml:lang="en">Amount of the cap on the deficit restoration obligation. + + xml:lang="en">Information about the Supplemental Report Review Of Insurance Review. + + xml:lang="en">Date of the financial transaction related to the fund. + xml:lang="en">Final Acceptance, Date + xml:lang="en">Link to regulatory approval notice. + xml:lang="en">A PV system or part of a system is considered to be available when it’s status is observed to be functional. Per IECRE 61724-3, this measure can be calculated as simple difference, percent difference, or ratio calculation. This concept should be reported as a Difference, calculated as Measured - Expected. - + xml:lang="en">Used as the identifier for the financial transaction related to the system. + xml:lang="en">Document Identifier, Operations And Maintenance Manual + xml:lang="en">Number of megawatts (MWac) developer has constructed. + xml:lang="en">Indicates if there are exceptions to the Interconnection Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Description of any exceptions to the Construction Contractor Notice of Certification. + + + xml:lang="en">PBI Revenue Per Watt + xml:lang="en">Indicates if there are exceptions to the Incentive Assignment or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - + xml:lang="en">Certificate Of Final Completion, Link + xml:lang="en">Legal entity identify for the portfolio company. + xml:lang="en">Link to the Appraisal document. + xml:lang="en">Identifier for the Operations Manager. + + + xml:lang="en">Availability Of Tax Opinion, Flag + + + xml:lang="en">Engineering, Procurement And Construction Agreement, Actual Completion Date + xml:lang="en">Availability Of Exceptions To The Qualifying Facilities Self Certification, Flag + xml:lang="en">Independent Engineering Services Checklist Post Funding Activity [Member] + xml:lang="en">Link to the Limited Liability Company Agreement document. + xml:lang="en">Availability Of Final Monthly Operating Report, Flag + + xml:lang="en">Link to the Mechanical Completion Certificate document. + xml:lang="en">Indicates if the Continuity Of Operations Agreement is available. If it is available, TRUE; if it is not available, FALSE. - + + + + xml:lang="en">End date of the construction monitoring report. + xml:lang="en">Renewable Energy Credit Contract Guaranteed Output, Power + xml:lang="en">Actual To Expected Energy Production, Ratio + xml:lang="en">System Availability Mode + + xml:lang="en">Term of the Site Lease Agreement. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Indicates if credit support is for the Lease Schedule. If it is, TRUE; if it is not, FALSE. + + xml:lang="en">Site Review Of Archeological Cultural And Local Impact [Member] + + + + xml:lang="en">Active Energy Or Parasitic Load, Amount + xml:lang="en">Expiration date of the Assignment and Assumption Agreement. + xml:lang="en">Identifier for Fund Proposal Request. + + + + + xml:lang="en">Information about the investment fund. + xml:lang="en">Description of any exceptions to the Supplemental Report Review Of Local Tax Review or issues raised. + + xml:lang="en">Term of the shortest Power Purchase Agreement within the fund. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. - - + xml:lang="en">Federal tax identifier for the Project Company. - - - + xml:lang="en">Wiring Instructions Recipient, Name + xml:lang="en">Zoning Permit Termination [Table] + xml:lang="en">Availability Of Final Operator Guarantee, Flag + xml:lang="en">Insurance, Availability + xml:lang="en">Name of the company responsible for preparing the LLC Registration. + xml:lang="en">Module Operating Temperature Minimum Temperature + + xml:lang="en">Payment deadline date of the Operations and Maintenance contract. - - + xml:lang="en">Agreement Related To Major Reported Event, Name + xml:lang="en">Effective date of the Pledge Agreement. + xml:lang="en">Amount of tax preparation fees incurred during the period. - + xml:lang="en">Continuity of Operations, Telecommunications Accounts, Description + xml:lang="en">Site Property Geospatial Boundary, File URI + xml:lang="en">Site Lease Assignment, Expiration Date + xml:lang="en">Name of the company responsible for preparing the Operations And Maintenance Manual. + xml:lang="en">Indicates if the Lessee Claim Documents is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Engineering, Procurement And Construction Agreement, Financial Assurances, Description + xml:lang="en">Approval Condition [Axis] + xml:lang="en">Advisor Invoices, Link + xml:lang="en">Cross Default Pool Amount [Table] + xml:lang="en">Information about the Environmental Site Assessment. + xml:lang="en">Name of the company responsible for preparing the Design And Construction Documents. - + xml:lang="en">Indicates if there is a cross default pool for the Hedge Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Monthly Operating Report Exceptions, Description + + xml:lang="en">Series Resistance Model Factor, Typical Met Year, Percent + xml:lang="en">Availability Of Final UCC Tax Lien and Judgment Lien Searches, Flag - - + xml:lang="en">Optimizer MPPT Operating Range Minimum, Amount + + xml:lang="en">Lease rent payments, net of collateral amount, actual or forecast. Values reported as forecast should use the StatementScenarioAxis. + xml:lang="en">Link to FERC 205 application document. + xml:lang="en">Indicates if the Insurance Consultant Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Availability Of Exceptions To The Asset Management Contract, Flag + xml:lang="en">IECRE Uncertainty Measures [Abstract] - + xml:lang="en">Description of any exceptions to the Environmental Site Assessment I or issues raised. - - + xml:lang="en">Energy Contract Hourly Rate, Hour 20 [Member] + xml:lang="en">Independent Engineering Services Advisor, Name + xml:lang="en">Expected cumulative incentive cost from inception to date. - + xml:lang="en">Operations Manager Billing Method, Description + xml:lang="en">Description of the qualifications required through the North American Electric Reliability Corporation (NERC) and Federal Energy Regulatory Commission (FERC) for the operations manager. + xml:lang="en">Tax Indemnity Agreement, Federal Tax Incentive Indemnity Type, Description + xml:lang="en">Limited Liability Company Agreement, Tax, Investment Tax Credit Allocations To Partners, Amount + xml:lang="en">Notice Of Commercial Operation [Abstract] + xml:lang="en">Names of counterparties to the Invoice Including Wiring Instructions. + + xml:lang="en">Description of the standard or source of publicly available procedure that is applicable to the data needed. - + xml:lang="en">Project, Name + xml:lang="en">Bank identification number for the lessee. + xml:lang="en">Confirmation that Continuity of Operations Program (COP) documentation has been uploaded to investor share drive. - - - - - - - + xml:lang="en">Represents 08:00 in 24 hour military time, 8:00 am. on the am/pm 12 hour clock. + xml:lang="en">Description of how to access site, for example where to obtain keys to the site. + xml:lang="en">Pre-production audit and remediation report, as needed. + xml:lang="en">Information about the Engineering Procurement and Construction contractors engaged to build the system. + + xml:lang="en">Description of the warranty available on a type of equipment. + xml:lang="en">Amount of contribution of tax equity provider. + xml:lang="en">AC nameplate capacity at revenue meter as built. + xml:lang="en">Name of the individual or organization that has termination rights. + xml:lang="en">Description of method used to adjust energy generation for weather. + xml:lang="en">Fund Reports, Description - - + xml:lang="en">Operator Performance, Sponsor Guarantee [Abstract] - + xml:lang="en">Availability Of Final Installation Agreement, Flag + + xml:lang="en">Contract Review Corrective Maintenance [Member] + + + + xml:lang="en">Number of shares of the tax equity partner as a percent of the total class equity. + xml:lang="en">Indicates if the funding proposal request is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">State Tax Credit Type, Description + xml:lang="en">California Energy Commission Listing, Date + xml:lang="en">Entity Is Site Host, Flag + xml:lang="en">Lessee Security Agreement [Abstract] + + xml:lang="en">Date when all major equipment has been installed, but the project is not yet interconnected to the grid. + + xml:lang="en">IECRE Financing Details [Abstract] + xml:lang="en">Investment Memo [Abstract] + xml:lang="en">Device [Line Items] + + xml:lang="en">Maximum amount of voltage that can be safely handled by the module, determined by UL. + - - + xml:lang="en">Preparer Of Notice Of Commercial Operations Date, Name + xml:lang="en">Master Services Agreement, Administrator + + + + xml:lang="en">Operations And Maintenance Contract, Initiation Date + + + + xml:lang="en">Developer Engineering Procurement and Construction Activities as Prime, Description + xml:lang="en">Developer Governance Structure, Description - - + xml:lang="en">Information about the financing structure and composition of the fund. For example, if it has wind assets, or if it has construction financing. + xml:lang="en">Document Identifier, Certificate Of Final Completion + + + xml:lang="en">Information about predicted performance data used in developing an IECRE certificate. + + xml:lang="en">Name of operator or developer providing the Performance guarantee, which is provided to guarantee a certain level of operating performance. + + xml:lang="en">Description of the purpose of letter of credit. For example, a letter of credit may provide a financial guarantee for a PPA, a financial guarantee for decommissioning, or a financial guarantee for the rent reserve. + xml:lang="en">Notice and Payment Instructions Exceptions, Description + xml:lang="en">Name of the company responsible for preparing the Closing Indemnity Agreement. + + xml:lang="en">Availability Of Continuity Of Operations Agreement, Flag + xml:lang="en">Actual Cost Of Penalties And Low Performance Cost Per Watt, Amount + + + xml:lang="en">Period [Axis] + xml:lang="en">Effective date of the Host Acknowledgement. + + xml:lang="en">Cross Default Pool Associated Contract [Abstract] + xml:lang="en">Document Identifier, Board Resolution For Master Lessee, Lessee And Operator + + xml:lang="en">Executive biographies of the developer company management. - - + xml:lang="en">Component Maintenance Cost No Equipment Warranty [Abstract] + xml:lang="en">Host Purchase Option Terms, Description + + xml:lang="en">Expected annualized loss due to horizon shading based on major design/energy production model used. - - + xml:lang="en">Inverter Input, Number Of Maximum Power Point Trackers + xml:lang="en">Power Purchase Agreement, Contract History And Structure, Description + xml:lang="en">Document Identifier, Pricing Model Report + xml:lang="en">Backup Asset Management, Expiration Date + + xml:lang="en">Information about the Special Purpose Vehicle. + xml:lang="en">Tracker equipment. + + xml:lang="en">Expiration date of the Financial Lease Schedule. - - + xml:lang="en">Identifier for Easement Report. + xml:lang="en">Information about predicted energy related to the system. + + xml:lang="en">Initial funding amount for Limited Liability Company Agreement for partnership flip. + xml:lang="en">Developer Portfolio Performance Guarantee, Percent + xml:lang="en">Source of Funds [Axis] + xml:lang="en">Revenue Meter Socket Type, Description + xml:lang="en">Building Inspection [Abstract] + + + xml:lang="en">Preparer Of Liability Insurance Certificate Agreement, Name + xml:lang="en">Invoice Including Wiring Instructions, Expiration Date + xml:lang="en">Ratio of actual revenue based incentives divided by the expected revenue based incentives from inception to date. + + + xml:lang="en">Indicates if there are exceptions to the LLC Formation Documents or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Mobilization fee for backup Operations and Maintenance contract per the Continuity of Operations Agreement which is the plan for the installation going forward including contingencies which may be triggered by financial performance. + xml:lang="en">Appraisal Stage, Description + xml:lang="en">Regulatory FERC205, Status + xml:lang="en">Document Identifier, Membership Certificate Of Master Lessee + xml:lang="en">Inverter Power At 10 Percent Power Level [Member] + xml:lang="en">Partnership Flip Counterparty, Name - - + xml:lang="en">Microinterver Is Attached to Module Backsheet With Adhesive, Flag + + xml:lang="en">Indication if the Power Rating (continuous at unity power factor) was provided in the weighted efficiency form. If it was, TRUE; if it was not, FALSE. + xml:lang="en">End date of the Monthly Operating Report, which documents monthly statistics on insolation, energy, availability and performance. + - - + xml:lang="en">Represents 12:00 in 24 hour military time, 12:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Energy Contract Hourly Rate, Hour 9 [Member] + xml:lang="en">Name of the company responsible for preparing the Operational Issues Report. + xml:lang="en">Energy Contract Hourly Rate, Hour 7 [Member] + xml:lang="en">Description of any exceptions to the independent engineering opinion report. + xml:lang="en">Solar Array Panels In Array, Number - + xml:lang="en">Preparer Of Notice Of Commercial Operation, Name + xml:lang="en">Equity Contribution Guarantee, Expiration Date + xml:lang="en">Indicates if the independent engineering opinion report is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Project Address State - - + xml:lang="en">Preparer Of Board Resolution For Master Lessee, Lessee And Operator, Name + xml:lang="en">Amount of funding in first year of the project. + xml:lang="en">Continuity Of Operations Agreement, Operator Replacement Provisions, Description - - + xml:lang="en">Amount of payments to other financiers in the reporting period. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Availability Of Operations And Maintenance Manual, Flag + + xml:lang="en">Preparer Of Supply Agreements, Name + xml:lang="en">Amount of rent for the site where the system is located. - - - + xml:lang="en">Property Insurance [Line Items] + xml:lang="en">Effective date of the Incentive Assignment. + xml:lang="en">Operator Guarantee, Effective Date + - + xml:lang="en">Predicted Energy Availability Estimate, Ratio + xml:lang="en">Minimum coverage amount of insurance. + xml:lang="en">Indicates if there are exceptions to the Membership Certificate of Master Lessee or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Identifier for Co Tenancy Agreement. + xml:lang="en">Commitment Agreement [Abstract] - - + xml:lang="en">Entity Parent Company Legal Entity Identifier + xml:lang="en">Amount of energy lost due to operational system issue. + xml:lang="en">Guaranteed output as percent of P50 energy production estimate for the portfolio. + xml:lang="en">Local Incentive Contract, Effective Date + xml:lang="en">Site Property Geospatial Boundary GIS File Format + + xml:lang="en">Guaranteed output as percent of P50 energy production estimate for the project. + + xml:lang="en">System Global Horizontal Irradiance + + xml:lang="en">Monitoring Contract Exceptions, Description + + + xml:lang="en">Indicates if the Funding Memo is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Permission To Operate Interconnection Approval [Abstract] + xml:lang="en">Component Maintenance Cost (Under Warranty) Roads, Amount + xml:lang="en">Description of any exceptions to the UCC Tax Lien and Judgment Lien Searches or issues raised. + xml:lang="en">Module Cell Row Count, Number + + xml:lang="en">Pricing Model, Investment Average Life + xml:lang="en">Operations and Maintenance Participant [Abstract] + xml:lang="en">Installation Agreement, Expiration Date + xml:lang="en">Project Administration Agreement [Abstract] + + + xml:lang="en">Surety Principal, Email + xml:lang="en">URI location where PDF of site geotechnical report is stored. + + xml:lang="en">Start date of the performance guarantee period in the Operations and Maintenance Contract. + + xml:lang="en">Vegetation Management, Area of Vegetation + xml:lang="en">Indicates if there are exceptions to the Membership Certificate of Lessee or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Renewable Energy Credit Offtake Agreement, Link + xml:lang="en">Wiring Instructions, Account Number - - + xml:lang="en">Construction Loan Agreement, Expiration Date - - + xml:lang="en">Reportable Environmental Condition Action, Description + xml:lang="en">Maximum percent tolerance between nameplate (nominal) power and flash test capacity of the module, on average. + xml:lang="en">Identifier for Insurance Consultant Report. - - + xml:lang="en">Preparer Of IECRE Certificate, Name + xml:lang="en">Independent Engineering Services Responsible Party, Name + xml:lang="en">System Operator, Name + xml:lang="en">Ratio of actual revenue based incentives divided by the expected revenue based incentives per month. + xml:lang="en">Availability Of Final Equity Contribution Agreement, Flag + xml:lang="en">Estimated time left remaining in the Power Purchase Agreement (PPA) or lease based on how much output has been generated so far compared to the original guaranteed output in the PPA or lease. Calculated as Last Payment Date minus Cut-off Date. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + + xml:lang="en">Appraisal Version, Description + xml:lang="en">Power Purchase Agreement, Contract Expiration, Date + xml:lang="en">Identifier for Vegetation Management Agreement. + xml:lang="en">Initial Funding Year, Amount + xml:lang="en">Inverter Downtime, Number Of Hours + xml:lang="en">Availability Of Final Asset Management Contract, Flag - + xml:lang="en">Funding Proposal Request Exceptions, Description + xml:lang="en">Document Identifier, Engineering Services Checklist + + xml:lang="en">Number of acres in the site. + xml:lang="en">Swift code for the bank. The Swift code is a standard format of Bank Identifier Codes (BIC) in accordance with ISO 9362. - - + xml:lang="en">Indicates if the property insurance certificate is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability Of Supplemental Report Review Of Insurance Review, Flag + xml:lang="en">Indicates if credit support is for the Term Loan Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Name of the company responsible for preparing the Membership Certificate Of Lessee. + xml:lang="en">Preparer Of Business Interruption Insurance Policy Insurance Policy, Name + xml:lang="en">Term Sheet, Link + xml:lang="en">ACH Payment, Flag + xml:lang="en">Effective date of the Master Services Agreement. + + + xml:lang="en">The reference yield Yr can be calculated by dividing the total in-plane irradiation by the module's reference plane of array irradiance: Yr = Hi / Gi,ref, where the reference plane of array irradiance Gi,ref (kW⋅m−2) is the irradiance at which P0 is determined. Calculated for a one year period. + + xml:lang="en">Description of any exceptions to the Commitment Agreement. + xml:lang="en">Name of the company responsible for preparing the Interconnection Agreement. + xml:lang="en">Closing Documents [Abstract] + xml:lang="en">Availability Of Exceptions To The Closing Certificate, Flag + xml:lang="en">Operating Company Financial Data [Abstract] - - - + xml:lang="en">Operations and Maintenance Contract, Description + xml:lang="en">Description of coverage per occurence requirement in insurance. + xml:lang="en">Aggregate cost of the device from start of the installation to date. + xml:lang="en">Site Lease Assignment Exceptions, Description + xml:lang="en">Indicates if the Operating Agreements for Master Lessee, Lessee and Operator is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Value of the voltage when module is operating at maximum power and at NOCT (nominal operating cell temperature). May also be called Maximum Power Voltage or VPmax, NOCT. + xml:lang="en">State Tax Credit Portion of Site, Percent - - - - - - + xml:lang="en">Availability Of Exceptions To The LLC Formation Documents, Flag + xml:lang="en">Electrical Generation Revenue Per Watt - - + xml:lang="en">Continuity of Operations Agreement, Parallel Monitoring, Contract Initiation Date + xml:lang="en">Power Purchase Agreement, Default Provisions, Description + xml:lang="en">Asset Manager States, Number + xml:lang="en">Preparer Of Substantial Completion Certificate, Name + xml:lang="en">Identifier for Pricing File. + xml:lang="en">Indicates if the Design and Construction Documents is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Module Factory Audits Pre Production Audit Remediation Report [Member] - - + xml:lang="en">Operations and Maintenance Contract Address + xml:lang="en">Developer Portfolio Performance Guarantee, Initiation Date - Percentage of kWh lost due to operating at non-unity power factor (note: unity power factor should equal 1.0; operating at 0.9 or 1.1 would result in loss of energy or not enough energy produced.), for a typical meteorological met month, calculation based on major design/energy production model used. + + + + + + + xml:lang="en">Information about a Financial Lease Schedule. + xml:lang="en">Sale Leaseback Execution, Date + xml:lang="en">Independent Engineering Services Checklist Transmission And Curtailment [Member] + xml:lang="en">Letter Of Credit, Link + xml:lang="en">Preparer Of Monthly Operating Report, Name + xml:lang="en">Document Identifier, Certificate Of Completion + + + xml:lang="en">Operational Major Event, Severity Of Event + + + xml:lang="en">Amount of the Investment Tax Credit or grant claimed per the pricing model. + xml:lang="en">Information about the Approval Notice for the project. + xml:lang="en">Use of Funds [Table] + xml:lang="en">Information about any historical instance of money changing hands related to the given system. + xml:lang="en">Email address for the backup Operations and Maintenance subcontractor. + xml:lang="en">Document Identifier, Security Agreement Supplement - - + xml:lang="en">Preparer Of Notice And Payment Instructions, Name + xml:lang="en">Used to identify individual pieces of equipment used in a system, for example, ABC Brand inverter with serial number xxxx. + xml:lang="en">Indicates if the Site License Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Start date of the equipment warranty. + xml:lang="en">Model Average Ambient Temperature + + + xml:lang="en">Mandatory Site Access Requirements, Description + + + + xml:lang="en">Availability Of Final Property Tax Exemption Opinion, Flag + xml:lang="en">Natural Resource Permit, Link + xml:lang="en">Term of the sponsor performance guarantee per the Operator Performance Guarantee. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Energy production estimate contribution from OND file creation or conformation and validation (inverter) in kWh. + + xml:lang="en">Preparer Of UCC Security Agreement, Name + xml:lang="en">Items on the Independent Engineering Services Checklist regarding Module Factory Audits. + xml:lang="en">Indicates if the Construction Contractor Notice of Certification is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. - + xml:lang="en">LLC Formation, Link + + + xml:lang="en">Indicates if the Lessee Claim Documents is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Indication as to whether the performance model has been modified relative to the previous test completed. If it has been modified, TRUE; if it has not been modified, FALSE. + xml:lang="en">Incumbency Certificate, Link + xml:lang="en">Description of the amortization class used, for example Modified Accelerated Cost Recovery System. - - + xml:lang="en">Names of counterparties to the Other Equipment Due Diligence Reports. + xml:lang="en">Financing Event [Table] + xml:lang="en">Municipal authority, for example, town, city or country, that has jurisdiction to define local code requirements. - + xml:lang="en">Supply Agreements [Axis] + xml:lang="en">ACH Payment Discount, Amount + xml:lang="en">Asset Management Expense, Actual, Amount + xml:lang="en">Product Identifier, Combiner [Abstract] - + xml:lang="en">Percentage of energy lost due to economic curtailment based on major design/energy production model. Economic curtailment is a result of wholesale market pricing, etc. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. - - + xml:lang="en">Ambient temperature during the test condition. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Logger Communication Protocol + + + + + xml:lang="en">Monthly Operating Report Warranty Management, Description + + xml:lang="en">Cross Default Pool for Individual Contractor Agreement, Flag - + xml:lang="en">Orientation Tilt, Degrees + xml:lang="en">Description of the asset manager supply strategy. + xml:lang="en">Grid electricity cost in currency per kWh. + + xml:lang="en">Maintenance cost of Module with no warranty. + xml:lang="en">Indicates if there are exceptions to the Host Acknowledgement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Phase type of the inverter which can be Single Phase, Three Phase WYE configuration, or Three Phase Delta configuration. + xml:lang="en">Earthquake Insurance, Amount Per Power + xml:lang="en">Information about expected performance data used in developing an IECRE certificate. + xml:lang="en">Description of how the reserve funds will be used which can be for rent, maintenance or other activities. + xml:lang="en">Description of any exceptions to the Substantial Completion Certificate. - - + xml:lang="en">Availability Of Exceptions To The Operations And Maintenance Manual, Flag + xml:lang="en">Information about the Lessee Security Agreement for the project. + xml:lang="en">Utility Electricity Cost, Amount per Power + xml:lang="en">Entity, Tax Identification Number + xml:lang="en">Document Identifier, Property Tax Exemption Opinion + xml:lang="en">Entity Code + xml:lang="en">Energy Production Estimate Contribution From OND File [Member] + xml:lang="en">Average annual amount of rent over the lifetime of the lease. + xml:lang="en">Status Report Of Project Description [Member] + + xml:lang="en">Module Fire Rating, Description + xml:lang="en">Rated AC voltage of the inverter. - - + xml:lang="en">Term Sheet, Effective Date + xml:lang="en">Start date of the commitment period in the Master Purchase Agreement which covers the agreement of the developer to sell the assets to the investor. - + xml:lang="en">Minimum power factor when absorbing reactive power. - + xml:lang="en">Effective date of the Supply Agreements. + xml:lang="en">Initial Insurance Covered, Start Date + xml:lang="en">Approval Notice [Abstract] - - + xml:lang="en">Information about vegetation management on the site. + xml:lang="en">Identifier for Renewable Energy Credit Buyer Acknowledgement. + xml:lang="en">Does the sponsor need to post credit support for site restoration and system removal conditions. If the sponsor needs to post credit support, TRUE; if not, FALSE. - - + xml:lang="en">Expiration date of the Equipment Warranties. - - + xml:lang="en">Identifier for Design And Construction Documents. + xml:lang="en">Preparer Of Operating Agreements For Master Lessee, Lessee And Operator, Name + xml:lang="en">Name of the company responsible for preparing the Master Lessee Security Agreement. + + xml:lang="en">Assignment Of Interest, Link + xml:lang="en">Effective date of the Electrical Inspection. + xml:lang="en">Parasitic Loss Model Factor, Typical Met Month, Percent + xml:lang="en">Link to the Exposure Report document. + - - + xml:lang="en">Continuity Of Operations Agreement Exceptions, Description + xml:lang="en">Availability Of Closing Certificate, Flag + + xml:lang="en">Effective date of the module factory audit report. + xml:lang="en">Link to the SubArray Geospatial Layout (GIS) file. + + + + xml:lang="en">Credit Rating of Letter of Credit Provider + xml:lang="en">Expected Active Electrical Production at the revenue meter for indicated time period in kWh per IEC 61724-3 using measured weather data during times of availability and including adjustments for parasitic losses. See Section 6.6.6 of IEC 61724-3. Measured from inception to date. + + - + xml:lang="en">Used as the identifier for the OffTaker. - + xml:lang="en">Component Maintenance Cost For Equipment With Warranty, Amount + xml:lang="en">Availability Of Final Exposure Report, Flag + xml:lang="en">Preparer Of Title Survey, Name + xml:lang="en">Asset Management Contract, Rate, Amount + xml:lang="en">Information about optimizer certifications which can be EN61000, IEC61010, or UL1741. + xml:lang="en">Post Close Items, Punch List Items, Description + xml:lang="en">Developer Project Performance Guarantee, Link + + + xml:lang="en">Description of developer's engagement with the local community on current and past projects. + + + + xml:lang="en">Model Factors External Curtailment, Flag + + xml:lang="en">Entity Name + xml:lang="en">Natural Resource Permit Action [Table] + xml:lang="en">Equipment Type, Number + xml:lang="en">Cultural Resource Permit, Issue Date + xml:lang="en">Pricing Model, Rent Payment Increment, Period + xml:lang="en">Information describing the project. + xml:lang="en">Site Lease Access Agreement, Link - + xml:lang="en">Indicates if the Notice and Payment Instructions is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. - - + xml:lang="en">Counterparties To The Notice and Payment Instructions, Names + xml:lang="en">Security Interest Associated Contract [Abstract] + xml:lang="en">Table represents state by state performance defined as actual to energy production of projects of the operations manager. + xml:lang="en">Other System Cost, Amount + xml:lang="en">Effective date of Limited Liability Company Agreement. + xml:lang="en">Name of the company responsible for preparing the Sales Leaseback Contract For Project. + xml:lang="en">Amount of DC input in voltage, measured in volts. + xml:lang="en">Address of primary Operations And Maintenance subcontractor. + xml:lang="en">Date of contract expiration of long-term contract to purchase electricity from a production system, e.g., could be same as PPA Expiration Date. + xml:lang="en">Inverter Harmonics Threshold, Percent + + xml:lang="en">Site Address City + + xml:lang="en">Project Identifier + + + xml:lang="en">Status of Division of State Architect approval. + xml:lang="en">Indicates if the liability insurance certificate is available. If it is available, TRUE; if it is not available, FALSE. - - + xml:lang="en">Effective date of Insurance + xml:lang="en">Items on the Independent Engineering Services Checklist regarding review of the financial model. + xml:lang="en">Indicates the system availability mode which can be Islanded, Standby, Environment, Grid, Shutdown, Forced, or Emergency. + xml:lang="en">Description of any exceptions to the Notice and Payment Instructions. + xml:lang="en">Product Identifier, Battery Management System [Abstract] + - + xml:lang="en">Effective date of the Appraisal. + xml:lang="en">Swap rate used in the pricing model per the pricing model. + xml:lang="en">Type of technology used in the module which can be Mono-C-Si (single crystal crystalline silicon technology), Multi-C-Si (uses many crystals crystalline technology), or Thin Film (made by placing one or more films of PV material on a substrate). + xml:lang="en">Description of any exceptions to the Notice of Commercial Operations Date or issues raised. - + xml:lang="en">Maintenance cost of Met station under warranty. + xml:lang="en">Partnership Flip, P90 Flip Date - - - - + xml:lang="en">Description of reports and notifications. + xml:lang="en">Natural Resource Identified, Description + xml:lang="en">Test Condition Wind Speed + + xml:lang="en">Security Interests, Comments + xml:lang="en">Site License Agreement, Expiration Date + xml:lang="en">Information about devices that are specific to a particular individual device within a system. For example, temperature of an individual module or combiner. - - + xml:lang="en">Liability Insurance [Table] + xml:lang="en">Fault Code Count + xml:lang="en">Operations And Maintenance Contract, Contractor Performance Guarantee, Initiation Date + xml:lang="en">Information about types of insurance related to the project or system. + + + xml:lang="en">Optimizer Has Certification UL1741, Flag + xml:lang="en">Description of the type of zoning permit, for example, Special Use, Conditional Use, Variance. + xml:lang="en">Name of bank or surety issuing support. + + xml:lang="en">Operational Performance, Expected Daylight Hours Inception To Date, Number Of Hours + xml:lang="en">Indicates if the Renewable Energy Credit Buyer Acknowledgement is available. If it is available, TRUE; if it is not available, FALSE. - - + xml:lang="en">Expected Deferred Investment Tax Credit, Amount + xml:lang="en">Identifier for Engineering Procurement And Construction Contract. + + xml:lang="en">Site Review Of Land Condition [Member] + + + + + - + xml:lang="en">Early Buy Out Options [Table] + xml:lang="en">Limited Liability Company Agreement, Fixed Tax Assumptions, Percent + xml:lang="en">Entity Kroll Credit Rating + xml:lang="en">Indicates if the Bill of Sale for the installation is available. If it is available, TRUE; if it is not available, FALSE. - - + xml:lang="en">Expected Deferred Tax Liability, Amount + xml:lang="en">City where the project is based. + xml:lang="en">Availability Of Exceptions To The Funding Proposal Request, Flag + xml:lang="en">Amount of decrease in current output as temperature increases, measured in percent per Celsius. May also be known as αIsc. - - + xml:lang="en">Appraised Value to Appraised Value at Commercial Operations Date, Percent + xml:lang="en">Expected average P50 insolation generated in kWh per square meters from inception to date. + xml:lang="en">Curtailment Measurement Period, Description + + + xml:lang="en">Used to group information about permit actions related to a natural resource located on a site. + xml:lang="en">Site Property Survey Location, URI + xml:lang="en">Economic Curtailment Model Factor, Percent - - + xml:lang="en">Engineering, Procurement And Construction Agreement, Expected Completion Date + xml:lang="en">Availability Of Financial Lease Schedule, Flag + xml:lang="en">Site Address 1 - - + xml:lang="en">Renewable Energy Credit Contract, Portion of Site, Percent + xml:lang="en">Indicates if the Easement Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Vegetation Management Frequency + xml:lang="en">Information contained in the contract for a sale leaseback. + xml:lang="en">Counterparties To The Tax Indemnity Agreement, Names + xml:lang="en">SCADA System License Expense, Amount + xml:lang="en">Availability Of Investment Memo, Flag + xml:lang="en">Effective after tax internal rate of return per the pricing model. + xml:lang="en">Description of the developer performance guarantee type for the project. + + + xml:lang="en">LCC Registration, Effective Date + xml:lang="en">Indicates if the Notice and Payment Instructions is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Link to the American Land Title Association (ALTA) survey. + xml:lang="en">Description of revenue sources. - - + xml:lang="en">Operations And Maintenance Manual Availability + xml:lang="en">Washing Module, Quantity Of Modules + + + xml:lang="en">Credit Support for Hedge Agreement, Flag + xml:lang="en">Recipient of wired funds for the system. + xml:lang="en">Expiration date of the performance based incentive term. + + xml:lang="en">Other Permits, Governing Authority, Name + + xml:lang="en">Initiation date for backup Operations and Maintenance contract. + xml:lang="en">Power Purchase Agreement [Abstract] + xml:lang="en">Wiring Instructions Reference, Description - - + xml:lang="en">Credit Support Identifier [Axis] + xml:lang="en">If the Inverter has reverse polarity, TRUE; if the inverter does not have reverse polarity, FALSE. + xml:lang="en">Financial Contract For System, Type + + xml:lang="en">Names of counterparties to the Supplemental Report Review Of Insurance Review. + xml:lang="en">Availability Of Exceptions To The Renewable Energy Credit Buyer Acknowledgement, Flag + xml:lang="en">Project Early Buy Out, Amount + xml:lang="en">Washing Cost Per Module, Amount + + + xml:lang="en">Credit Support Beneficiary, Type + xml:lang="en">Performance Based Incentive, Portion of Site, Percent - - + xml:lang="en">Monthly Operating Report Routine Preventative Maintenance, Description - - + xml:lang="en">Period Month April [Member] + xml:lang="en">Type of roof slope which can be flat, sloped or steep. - - + xml:lang="en">Expected Energy At Unavailable Times Excluding External Or Other Outages - + xml:lang="en">Inverter Error Code Data + xml:lang="en">Component Maintenance Cost (No Warranty) Combiner Box, Amount - + xml:lang="en">Availability Of Exceptions To The Tax Opinion, Flag + xml:lang="en">Email address for contact individual for Power Purchase Agreement notices. + xml:lang="en">Name of the company responsible for preparing the Construction Monitoring Report. + + + xml:lang="en">Contract Review Site Lease [Member] + xml:lang="en">Availability Of Membership Certificate Of Master Lessee, Flag + xml:lang="en">Effective date of the Co Tenancy Agreement. + + + + xml:lang="en">Percentage of kWh lost due to module array mismatch, for a typical meteorological month, calculation based on major design/energy production model used. + + + - - + xml:lang="en">Financing Event, Status xlink:type="resource" xml:lang="en">Description of the Recognized Environmental Condition in the Environmental Site Assessment I report. + xml:lang="en">Number One Fund Strength, Description + + xml:lang="en">Indication that the MLPE (module level power electronics) allows a larger string length. + + + xml:lang="en">Performance Guarantee, Description + + xml:lang="en">Entity Is Utility, Flag + + + xml:lang="en">Description of contract structure and history per Site Control. + xml:lang="en">Description of the communication system for the inverter. + + xml:lang="en">Value of the Renewable Energy Credit associated with the guaranteed firm volume in currency per kWh per the Renewable Energy Credit Contract which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">Names of counterparties to the Monitoring Contract. + xml:lang="en">Name of the beneficiary of the Parent guarantee, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. + + xml:lang="en">Description of Power Offtake Agreement in the Power Purchase Agreement. + xml:lang="en">Information about financing of the system that may be needed for an IECRE certificate. + xml:lang="en">Description of security issues during the construction phase. + + xml:lang="en">Link to the permit for the natural resource. + xml:lang="en">Link to the Membership Interest Purchase Agreement document. + + - + xml:lang="en">Information about the Asset Management Contract. + + + xml:lang="en">Equipment review of Inverters. + xml:lang="en">Source of Funds, Amount + xml:lang="en">Description of the type of legal entity, for example LLC or Corporation. + xml:lang="en">Maximum, nameplate (nominal) apparent power output of the inverter, in volts-ampere. + + + xml:lang="en">Name of the customer with an outstanding balance. + xml:lang="en">Link to the Site Lease Assignment document. - - + xml:lang="en">Type of internet connection to system. + xml:lang="en">IECRE Certifying Body (CB) who issued the certificate. + xml:lang="en">Link to the Permission To Operate Interconnection Approval document. + xml:lang="en">Name of the company responsible for preparing the Asset Management Agreement. + xml:lang="en">Indicates if there are exceptions to the installation agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Engineering, Procurement and Construction Contractor, Name + + xml:lang="en">Certificate number for the Qualified Facility (QF) or Exempt Wholesale Generators (EWG). + xml:lang="en">Indicates if the suppliers contract review has been considered. If it has been considered, TRUE; if it has not been considered, FALSE. + xml:lang="en">Inverter Backup Output Automatic Switch Over Time - + xml:lang="en">SIte Barometric Pressure + xml:lang="en">Site Property Location Of Consumables Inventory, Description + xml:lang="en">Approvals [Table] + xml:lang="en">Power Purchase Agreement, Transmission And Scheduling Responsibilities, Description - + xml:lang="en">Term of the permit. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Indicates if there are exceptions to the Renewable Energy Credit Buyer Acknowledgement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Equipment review of PV Modules. - + xml:lang="en">Investment average life per the pricing model. - + xml:lang="en">Availability Of Site Lease Assignment, Flag - - - - - + xml:lang="en">Link to the Membership Certificate Of Lessee document. + xml:lang="en">Tax Indemnity Agreement, Effective Date + xml:lang="en">Expiration date of the Bill of Sale for the installation. + xml:lang="en">Warranty review of Inverters. + xml:lang="en">Description of the Punch List. + xml:lang="en">Name of the company responsible for preparing the Pledge Agreement. - + xml:lang="en">Names of counterparties to the Equity Contribution Agreement. - + xml:lang="en">Information about Sponsor Group (the organization that sponsors or develops the project). + xml:lang="en">Represents reportable environmental conditions (REC), such as hazardous substances or petroleum products at or near a site, which are reported in an environmental assessment report. Data reported on RECs include recommendations on how to remedy the situation. + xml:lang="en">Indicates if there are exceptions to the Transmission Report and Curtailment Estimate or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Independent Engineering Services Notes, Description + xml:lang="en">First year energy output in megawatt hours, pre-availability and curtailment. + xml:lang="en">Portfolio [Abstract] + + + xml:lang="en">Amount of breakage fee for the investor, used in the event the project is not funded, or if either counterparty breaks funding agreement. + xml:lang="en">Description of payment terms for Power Purchase Agreement payments. + xml:lang="en">Availability Of UCC Precautionary Lease Filing, Flag + xml:lang="en">Equipment Manufacturer Contact, Name + xml:lang="en">Indicates if the Site Lease Access Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Test Condition [Domain] + xml:lang="en">Indication as to whether the use of funds is for a specific project. If it is for a specific project, TRUE; if it is not for a specific project, FALSE. + + xml:lang="en">Information about a Renewable Energy Credit Agreement OffTake Agreement. - - + xml:lang="en">Period Month March [Member] + xml:lang="en">Expected Energy Availability Estimate, Ratio + xml:lang="en">Description of any exceptions to the Monthly Operating Report or issues raised. + xml:lang="en">Indemnification section of the Master Purchase Agreement which covers the agreement of the developer to sell the assets to the investor. + + xml:lang="en">Date on which Division of State Architect approval was obtained. + xml:lang="en">Indicates if there are exceptions to the Letter Of Credit. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">First line of the address of the equipment manufacturer. + xml:lang="en">Link to the Site Lease Access Agreement document. + xml:lang="en">Time periods for when payments are due. For example, monthly or quarterly, per the pricing model. + + xml:lang="en">Collateral Agent, Project Working Capital Account, Prefunded Months + xml:lang="en">Represents information about classes of reserves established for a project or a fund such as bank account, balance, date established and form of reserve. + - + xml:lang="en">Security Interests Grantee, Counterparty Identifier - - + xml:lang="en">Amount of contribution of tax equity provider. + xml:lang="en">Surrety Warranty Term + xml:lang="en">Operations And Maintenance Contract [Table] + xml:lang="en">Operations And Maintenance Contract, Rate, Amount + xml:lang="en">Module Nameplate Capacity, Power - - + xml:lang="en">Amount of fees specified in the Operations and Maintenance contract to be paid to the contractor. + xml:lang="en">OffTaker [Axis] + xml:lang="en">Maintenance Ticket, Date Closed - + xml:lang="en">Battery Management System, Number - + xml:lang="en">Operating Plan, Description + xml:lang="en">Identifier for IECRE Certificate. + xml:lang="en">Equipment Warranties Exceptions, Description + xml:lang="en">Size of storage facility in kWh. + xml:lang="en">Names of counterparties to the UCC Security Agreement. + xml:lang="en">Used to define the year as an integer from the effective date of the Energy Contract. - + xml:lang="en">Link to the Developer project Performance Guarantee document. + + + xml:lang="en">Describes the status of the wind project, for example whether it is new, or repowering. - - - + xml:lang="en">Special Purpose Vehicle Identifier [Axis] + xml:lang="en">Letter of Credit Documents [Abstract] - + xml:lang="en">Current State And Local Tax Expense Benefit Per Watt + + + xml:lang="en">Security Interest in Membership Interest Purchase Agreement, Flag + xml:lang="en">Indicates if the Certificates of Insurance is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Power Purchase Agreement, Guaranteed Output, Amount + xml:lang="en">Indicator if the tracker is dual axis; if it is TRUE, if it is not, FALSE. - + xml:lang="en">Battery, Total Number Of Batteries + xml:lang="en">Information about cash distributions made to investors. + xml:lang="en">Inverter, Maximum Start Voltage + xml:lang="en">Document Identifier, Module Accelerated Age Test Report + xml:lang="en">Site Control Host Company, Name + xml:lang="en">Measured Average Energy Production for Period + xml:lang="en">Mortgage Balance, Amount + xml:lang="en">Insurance Consultant Report, Link + xml:lang="en">Natural Resource Permit Identifier + xml:lang="en">Substantial Completion Certificate, Effective Date - - + xml:lang="en">Amount of total lease payments made upfront. + xml:lang="en">Represents information related to Special Purpose Vehicles (SPV) such as location, legal entity identifiers and links to related agreements. + xml:lang="en">Information about insurance related to the fund. + xml:lang="en">Entity Zip Code + xml:lang="en">Site Property Information [Abstract] + xml:lang="en">Zoning Permit, Term - + xml:lang="en">Assignment And Assumption Agreement, Link + + + xml:lang="en">Description of the asset manager performance guarantees. + xml:lang="en">Site Latitude At Revenue Meter + + xml:lang="en">Performance Ratio, Weather Corrected + xml:lang="en">Inverter, Power Factor Minimum, Underexcited - - + xml:lang="en">Investment Memo, Link + xml:lang="en">Indicates if the Supplemental Report Review Of Local Tax Review is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Aerosol Model Factor, Typical Met Year, Percent + xml:lang="en">Model Factors Parasitic Loss, Flag + xml:lang="en">Security Interests Grantee, SPV Identifier + xml:lang="en">Indicates if there are exceptions to the Certificate of Acceptance Report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Date when owner accepts system, usually approximately one year after operation begins. + xml:lang="en">Model Incident Angle Modifier Loss, Amount + xml:lang="en">Mechanical completion review - check for commissioning tests on open circuit voltage and short circuit current testing or the equivalent such as a full coverage IV curve tracer kit or module or system-level infrared imaging audit (if interconnected). + xml:lang="en">Table containing information about Universal insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + + xml:lang="en">Availability Of Final Co Tenancy Agreement, Flag + + + + xml:lang="en">Represents information about the various sources of funds that may be used for a financing event. + xml:lang="en">Description of the Title Policy of the site. + xml:lang="en">This table is used to define the relationship between the System and its entities. It is also used to relate a entity to multiple systems. The table is used by identifing a boolean value that has an associated system and entity identifier. + + xml:lang="en">Business Interruption Insurance [Line Items] + + - - + xml:lang="en">Maximum operating temperature of the solar module. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Cultural Resource Study [Table] + xml:lang="en">Expiration date of the Appraisal. + xml:lang="en">Name of the company responsible for preparing the Other Equipment Due Diligence Reports. + + xml:lang="en">Incentive based on the production of the system, provided by the Utility. - - + xml:lang="en">Telecommunications Expense, Amount + + xml:lang="en">Date on which permit was issued + xml:lang="en">Effective date of the Bill of Sale for the installation. - - + xml:lang="en">Expiration date of the UCC Security Agreement. + xml:lang="en">Uncertainty of Expected Energy Based on Weather, Percent + xml:lang="en">Equipment Manufacturer Details Address 1 + xml:lang="en">Date on which the reserve account is required to be established. + + xml:lang="en">Total partner shares (regardless of class) as a percent of total equity. + xml:lang="en">Construction Contractor Notice Of Certification, Link - + xml:lang="en">Availability Of Lessee Collateral Agency Agreement, Flag + xml:lang="en">Cultural Resource Permit [Line Items] + xml:lang="en">Description of the status of the upfront fee, for example, Not Applicable, Not Due, Overdue, Partially Paid, Fully Paid. + - + xml:lang="en">Description of the rebate program. + xml:lang="en">Number of the time period, for example 1 may represent the first quarter of the year. + xml:lang="en">Output in kWh guaranteed by the contractor in the Operations and Maintenance contract. + xml:lang="en">LCC Registration, Link - - - + xml:lang="en">Indicates if the Electrical Inspection is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Name of the company responsible for preparing the Notice And Payment Instructions. + + + xml:lang="en">UCC Security Agreement Exceptions, Description + xml:lang="en">Indicates if dust conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Exception To Functional Test [Member] + xml:lang="en">OffTaker Identifier + xml:lang="en">Site Control [Abstract] + xml:lang="en">Availability Of LLC Formation Documents, Flag - - - - - + xml:lang="en">Product Identifier [Line Items] + xml:lang="en">Site inspections on-site or remote, Utility Scale Monthly Physical/On-Site Inspection. + xml:lang="en">Identifier for the Special Purpose Vehicle which is a grantor. + xml:lang="en">Effective after tax terminal internal rate of return per the pricing model. + - + xml:lang="en">Term of the state tax credit. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Indicates whether the system tracker is fixed, horizontal axis, two-axis, vertical, vertical-axis, or seasonal tilt. - + xml:lang="en">Counterparties To The Permission To Operate Interconnection Approval, Names + xml:lang="en">Information about Workers Compensation Insurance. + xml:lang="en">Preparer Of Master Lessee Security Agreement, Name + xml:lang="en">Used to represent information about the equipment used in the system. + + + + xml:lang="en">Indicates if the Monitoring Contract is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Performance Based Incentive Firm Volume, Energy + xml:lang="en">Use to group information about a project. + xml:lang="en">Indicates if the Limited Liability Company Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Indicates if there is security interest in the Operations and Maintenance Agreement. If it is, TRUE; if it is not, FALSE. + + + xml:lang="en">Expected Energy [Abstract] + xml:lang="en">Indicates if there are exceptions to the module factory audit report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Effective date of the Transmission Report and Curtailment Estimate. + xml:lang="en">Period Fourth Quarter [Member] - - + xml:lang="en">Sale Leaseback Counterparty, Name + xml:lang="en">Site Climate Classification [Abstract] + xml:lang="en">Easement Report, Link + + + - - + xml:lang="en">Title Policy [Abstract] + xml:lang="en">Indicates if there are exceptions to the Bill of Sale for the installation or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Financial Summary By System [Abstract] + xml:lang="en">IECRE Letter Of Credit Details [Line Items] + xml:lang="en">Information about the individual devices in the system. - - + xml:lang="en">Reference One Year Yield, Energy - - + xml:lang="en">Name of the company responsible for preparing the Independent Engineering Opinion Report. + xml:lang="en">Sale Leaseback Expiration Date + xml:lang="en">Name of the company responsible for preparing the Interconnection Approval. - + xml:lang="en">Utility email address. - + xml:lang="en">Identifier for the SPV that is using the funds. + xml:lang="en">Names of counterparties to the Lessee Claim Documents, providing evidence of Lessee’s claim to state rebates, subsidies or incentives for the project. - + xml:lang="en">Shortest Power Purchase Agreement Term + + + xml:lang="en">Operational Budget Review Of Asset Management [Member] + xml:lang="en">Renewable Energy Credit Contract Firm Price, Amount Per Power + xml:lang="en">Data Acquisition System [Member] + xml:lang="en">Electrical Energy Test, End Date - - + xml:lang="en">Actual operating expenses divided by expected operating expenses per month. + + + xml:lang="en">Description of the performance based incentive program. + + + xml:lang="en">Use to group a listing of information about the approval memo for a financing event. + xml:lang="en">Name of company that is responsible for operating the system. + xml:lang="en">Description of the Interconnection Agreement. + xml:lang="en">Description of exceptions to the transmission and curtailment report. + xml:lang="en">Cost Segregation Amortization Class, Description + xml:lang="en">Permits And Assessments Review Environmental Permit [Member] - + xml:lang="en">Availability Of Exceptions To The Construction Loan Agreement, Flag - + xml:lang="en">Counterparties To The LLC Formation Documents, Names - - + xml:lang="en">Number of sub arrays which are PV surface unit connected to an inverter. + xml:lang="en">Revenue Meter, Availability Of Kilovolt-Ampere Reactive Data, Flag + + + xml:lang="en">Indication if soiling is considered in the design model. If it is considered in the design model, TRUE; if it is not considered in the design model, FALSE. + + + xml:lang="en">Represents information about various energy budgets developed that are related to a site. Data reported can include version, source, status, phase, and date, as well as first year output, annual degradation of system performance, performance ratio, and periodicity of budget. + + + xml:lang="en">State or region where the project is located. + + + xml:lang="en">Information about Business Interruption Insurance. + xml:lang="en">Used to group a listing of information about the Periodic Budget. + xml:lang="en">Failed Component + + - + xml:lang="en">Indicates if the Tax Opinion is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">State Tax Credits, Expiration Date + + xml:lang="en">Indicates if the Wiring Instructions is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Bank at which account is held. + + xml:lang="en">Cross Default Pool for Power Purchase Agreement, Flag + xml:lang="en">Stipulated loss value, which is the net amount starting with the base stipulated loss value minus section 467 balance plus the pro rata rent. + xml:lang="en">Optimal number of bypass diodes for system integration. Bypass diodes are used to eliminate the hot-spot phenomena which can damage PV cells and even cause fire if the light hitting the surface of the PV cells in a module is not uniform. + + xml:lang="en">Advisor Invoices [Abstract] + xml:lang="en">Expiration date of the Term Loan. - - + xml:lang="en">AM Best Quality Rating required by the liability insurance provider in the Master Lease. + xml:lang="en">Link to the Lien Waiver document. + + + xml:lang="en">Asset Management Contract, Term + + + xml:lang="en">Difference between the actual termination value and the present value of the project value at the time of the termination. + + xml:lang="en">Name of the primary subcontractor in the Operations and Maintenance Contract. + xml:lang="en">Indicates if the Certificate of Formation for Master Lessee, Lessee and Operator is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Early Buy Out Options [Line Items] - - + xml:lang="en">Name of the company responsible for preparing the Shared Facility Agreement. + xml:lang="en">Master Purchase Agreement [Abstract] + xml:lang="en">Indicates if the Assignment and Assumption Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Contract date of the surety bond. + xml:lang="en">Appraisal Identifier + xml:lang="en">Equipment Product Model, Comments - + xml:lang="en">Preparer Of Financial Lease Schedule, Name - + xml:lang="en">Revenue Meter Starting Watts, Description + xml:lang="en">Periodic Budget, Output, Energy - - - - - - - - - - - - - - - - + xml:lang="en">Battery Style, Description - - - - - - - - + xml:lang="en">Document Identifier, Exposure Report + xml:lang="en">Link to a copy of membership certificate for the legal entity. - - - - + xml:lang="en">IECRE Performance Comparison [Line Items] - + xml:lang="en">Indication of the status of preventative maintenance tasks performed for cycle, which can be complete or incomplete. - - - - + xml:lang="en">Counterparties To The Commitment Agreement, Names + xml:lang="en">Initiation date of the Materials and Workmanship Warranty. - - - - + xml:lang="en">Length of the revenue meter. - - - - - - - - - - - - - - - - + xml:lang="en">Developer Details [Line Items] - - - + xml:lang="en">Preparer Of Interconnection Agreement, Name - + xml:lang="en">Availability Of Exceptions To The Project Administration Agreement, Flag - - - - - - - - - - - - - - - - - - - - - + xml:lang="en">Parent Guarantee, Description - - - - - - - + xml:lang="en">Availability Of Membership Interest Purchase Agreement, Flag - + xml:lang="en">Document Identifier, Tax Indemnity Agreement - - - + xml:lang="en">Availability Of Exceptions To The Board Resolution For Master Lessee, Lessee and Operator, Flag - - - - - + xml:lang="en">Renewable Energy Inspection Body, Name - + xml:lang="en">Description of provisions in the Continuity of Operations Agreement in the event the operator is replaced. - + xml:lang="en">Information about financial performance estimates made at start of project. + xml:lang="en">Operations and Maintenance contractor performance guarantee as percent of P50 energy production. - + xml:lang="en">Information specific to Monitoring Solution products that are used in the system. - + xml:lang="en">Inverter Night Tare Loss At 40 Degrees Celsius, Amount - - - - - - - + xml:lang="en">Target Reserve, Amount - - - - - - - - - - + xml:lang="en">Name of the operations and maintenance provider which may be different from the counterparty. For example, it could be provided by a subcontractor. - + xml:lang="en">Site Acreage, Number - - - + xml:lang="en">Effective date of the Term Loan. + + xml:lang="en">Commercial General Liability Insurance [Line Items] + xml:lang="en">Operations Manager Energy Forecasting Capabilities, Description + xml:lang="en">Status report on Project Scorecard. + xml:lang="en">Names of counterparties to the Tax Indemnity Agreement. + xml:lang="en">Entity Is PPA Offtaker, Flag - + xml:lang="en">Operating Agreements For Master Lessee, Lessee And Operator [Abstract] + xml:lang="en">Represents 09:00 in 24 hour military time, 9:00 am. on the am/pm 12 hour clock. + xml:lang="en">Indication if the microinverter is attached to the module backsheet with adhesive. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Indicates if there are exceptions to the Operations And Maintenance Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - + xml:lang="en">Device Listing, Manufacture Date + xml:lang="en">Third Party Roles [Axis] + xml:lang="en">Inverter, Minimum Start Voltage + xml:lang="en">Description of any exceptions to the installation agreement. + xml:lang="en">Availability Of Final Electrical Inspection, Flag + xml:lang="en">Issue Detail, Plan of Action, Description + xml:lang="en">Counterparties To The Hedge Agreement, Names + xml:lang="en">Model First Year Project Degradation Loss, Amount + xml:lang="en">Portfolio [Table] + xml:lang="en">Threshold amount of current in the Inverter Ground Fault Detector Interrupter which is a fuse that trips when ground fault current exceeds the ampere rating of the fuse. + + + + + xml:lang="en">Description of any other features of the underwriting structure. + xml:lang="en">Revenue Meter Frequency, Amount - - + xml:lang="en">Construction Monitoring Report, End Date + xml:lang="en">Cost of electricity from the utility. + + xml:lang="en">Information about the tax equity partner and shares of the fund. + xml:lang="en">Security Interest in Master Lease Agreement, Flag + + - + xml:lang="en">Identifier for the Sponsor Group. + xml:lang="en">Special Purpose Vehicle Type, Description - + xml:lang="en">Master Purchase Agreement, Special Covenants, Description + xml:lang="en">Environmental Site Assessment, Report Issue Date + xml:lang="en">Model Horizon Shading Loss, Amount + xml:lang="en">Bank Account Identifier [Axis] + xml:lang="en">Credit Performance, Date Of FICO Score - - + xml:lang="en">Site UTC Offset, Period + + xml:lang="en">Total amount of shortwave radiation received from above by a surface horizontal to the ground at the location of the solar installation, measured in watts per square meter. + xml:lang="en">Module Rated Current + xml:lang="en">Total Expected Energy At Revenue Meter, Energy + xml:lang="en">Energy Production Model [Abstract] + + xml:lang="en">Names of counterparties to the Certificate Of Completion. + - + xml:lang="en">Currency Used in the Contract + xml:lang="en">Identifier for Site Lease Memo. + + xml:lang="en">Table containing data about financing events that may be needed for an IECRE certificate. + xml:lang="en">Document Identifier, Title Survey + xml:lang="en">Link to the Operations And Maintenance Contract document. + xml:lang="en">Period [Domain] - - + xml:lang="en">Used to group a listing of information about terminations of zoning permits. + xml:lang="en">Parent Guarantee, Obligations, Description + xml:lang="en">Description of the scope of work outlined in the Engineering Procurement and Construction Agreement. + + xml:lang="en">Indicates if there are exceptions to the Equity Contribution Guarantee or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - + xml:lang="en">Indicates if there is security interest in the Master Lease Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Utility Information [Abstract] + + + + xml:lang="en">Inverter is at 50% power level. + xml:lang="en">IP address for the Data Acquisition System. + xml:lang="en">Information about the performance of incentives. + + + + + xml:lang="en">Availability Of Co Tenancy Agreement, Flag + xml:lang="en">Module Temperature + xml:lang="en">Security Agreement Supplement Exceptions, Description + xml:lang="en">Module Dimensions [Abstract] + xml:lang="en">Zoning Permit, Issue Date - + xml:lang="en">Duration of the product warranty term offered by the manufacturer in the format P1Y1M1D. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Site License Agreement Exceptions, Description + xml:lang="en">Identifier for Construction Contractor Notice Of Certification. + xml:lang="en">Equipment Warranties, Link + xml:lang="en">Name of the company responsible for preparing the Notice Of Commercial Operation. + xml:lang="en">Description of any exceptions to the Breakage Fee Agreement. - + xml:lang="en">Description of the operations manager failure and remediation procedures. + xml:lang="en">Identifier, name, or title of action required by the natural resources permit. + + + xml:lang="en">Excise And Sales Tax Per Watt + xml:lang="en">Project Administration Agreement, Expiration Date + xml:lang="en">Distance to nearest PV system project that has the same ownership, for example in miles. + xml:lang="en">Names of counterparties to the Interconnection Approval. + xml:lang="en">Indicates if the Term Loan is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + xml:lang="en">Indicates if the project has renewable energy credit offtake agreement. If it has a REC agreement, TRUE; if not, FALSE. - - - + xml:lang="en">Document Identifier, Assignment And Assumption Agreement - - + xml:lang="en">Indicates if there are exceptions to the Environmental Impact Report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Continuity of Operations Agreement, Backup Operations and Maintenance Contract, Initiation Date + xml:lang="en">Internal name for the fund. + xml:lang="en">Curtailment Ability And Cap, Description + xml:lang="en">Monitoring Contract, Term + xml:lang="en">Operations And Maintenance Contract Exceptions, Description + xml:lang="en">Module Has Certification IEC61730, Flag + xml:lang="en">Accrual account deposit amount per the pricing model. + xml:lang="en">Identifies the stage of the appraisal, for example, closing, initial funding, final funding. + + xml:lang="en">Legal Entity Membership Certificate Availability, Flag + xml:lang="en">Security Interests Grantor, Counterparty Identifier - + xml:lang="en">Represents information about the closing documents associated with a financing event which can include the identifier for the financing event to which the closing documents apply, the type of closing document, for example financial model, consent, estoppel, lien wavier, etc., link to the closing document and description of the closing document. + xml:lang="en">Description of any exceptions to the Asset Management Contract. - - + xml:lang="en">Rated Power At Peak AC, Power + xml:lang="en">Comparison of measured versus expected energy availability. This concepts reports the difference which is calculated as Measured – Expected. + xml:lang="en">Names of counterparties to the Project Administration Agreement. + + + + xml:lang="en">Description of any exceptions to the Title Survey or issues raised. + xml:lang="en">Orientation Minimum Tracker Rotation Limit, Degrees + xml:lang="en">Used to group a listing of information about a Developer. + xml:lang="en">Author of the Independent Engineering Production Estimate report. + xml:lang="en">Description of the material used on the front cover of the module. + xml:lang="en">Items on the Independent Engineering Services Checklist regarding the energy production estimate. + xml:lang="en">Utility Name + xml:lang="en">Link to the Certificate of Acceptance Report. + xml:lang="en">Availability Of UCC Tax Lien and Judgment Lien Searches, Flag + xml:lang="en">Information about title policy exclusions. + xml:lang="en">Information specific to Battery Inverter products that are used in the system. + xml:lang="en">System Production [Line Items] + xml:lang="en">Independent Engineering Services Checklist Module Reliability Testing Reports [Member] + xml:lang="en">Identifier for Board Resolution For Master Lessee, Lessee And Operator. + xml:lang="en">Information about penalties and costs associated with low performance and unavailability of the system. + xml:lang="en">Interconnection Agreement, Customer + xml:lang="en">Description of the potential for natural disasters on or near the site, for example, wildfires, flood, windstorms. + + xml:lang="en">Engineering, Procurement And Construction Agreement, Guaranties, Description + xml:lang="en">Availability Of Exceptions To The Membership Certificate Of Master Lessee, Flag + xml:lang="en">Amount of earthquake insurance in currency per nominal power (kWdc) which is defined as the nameplate capacity of the PV system. + xml:lang="en">Component Maintenance [Table] + + xml:lang="en">Credit Check Report [Abstract] + + + xml:lang="en">Indicates if the Notice of Commercial Operation is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Identifier for Energy Production Insurance Policy. + + xml:lang="en">Description of rate type of Site Lease Agreement. + + + xml:lang="en">Special Purpose Vehicle [Abstract] + xml:lang="en">Availability Of Exceptions To The Membership Interest Purchase Agreement, Flag + - + xml:lang="en">Number of Components Affected By Maintenance + xml:lang="en">Represents information related to a site-specific natural resource such as water, minerals, petroleum products or hazardous substances located on or in proximity to a site. + + xml:lang="en">Description of the module Junction Box rating as classified in IP 67. + xml:lang="en">Rental expense for equipment used for vegetation management. + xml:lang="en">Operations And Maintenance Contract Payment Deadline, Date + xml:lang="en">Module has certification other than IEC60364-4-41, IEC61215, IEC61646, IEC61701, IEC61730, or IEC62108. If it does then list the certifications comma delimited. + + xml:lang="en">Description of the level of serviceability of the optimizer, for example, a stand-alone unit that can be easily replaced, a unit attached to a module that may be replaced in the field (although not all of them can be), an embedded device that cannot be serviced separate from the module. + xml:lang="en">The tracker's tilt angle in degrees from horizontal, where zero degrees is horizontal, and 90 degrees is vertical and facing the equator (in both the southern and northern hemispheres). + xml:lang="en">Limited Liability Company Agreement, Expiration Date + xml:lang="en">Performance Based Incentive Volume Cap, Power + xml:lang="en">Title Policy Insurance, Amount + + xml:lang="en">Master Lessee Collateral Agency Agreement [Abstract] + xml:lang="en">Energy Contract Hourly Rate, Hour 18 [Member] + xml:lang="en">Indicates if there are exceptions to the Construction Loan Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - + xml:lang="en">System Degradation Rate, Percent + xml:lang="en">Array, Total Module Area + xml:lang="en">Amount of ACH payment discount. + + xml:lang="en">Product Model Cut Sheet Revised, Flag + xml:lang="en">Indicates if the LLC Formation Documents is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of information related to an issue and impact of the issue. + xml:lang="en">Cost of interest expense incurred. + xml:lang="en">Information specific to inverter products that are used in the system. + xml:lang="en">Description of any exceptions to the Board Resolution for Master Lessee, Lessee and Operator or issues raised. + xml:lang="en">Description of exclusions in the Performance guarantee, which is provided by the operator or developer to guarantee a certain level of operating performance. + + + xml:lang="en">Indicates if there is a cross default pool for the Lease Schedule. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Maintenance cost of wiring conduit with no warranty. + xml:lang="en">The PV array energy yield YA is the array energy output (DC) per rated kW(DC) of installed PV array: YA = EA / P0. Calculated for a one year period. + xml:lang="en">Availability Of Certificate Of Completion, Flag + + + xml:lang="en">Indicates if the IEC 62445-1 or local Grid Code Compliance has been met. If it has been met, TRUE; if it has not been met, FALSE + xml:lang="en">Operational budget review of Asset Management, reconciled with Managing Partner responsibilities. + + + xml:lang="en">Counterparties To The Property Tax Exemption Opinion, Names + - + xml:lang="en">Natural Resource Identifier [Axis] + xml:lang="en">Confirmation that the system is in operation. If in operation, TRUE; if not in operation, FALSE. + xml:lang="en">Project Company Tax ID Number + xml:lang="en">pro forma initial insurance cost in currency per kWh. + + + + + xml:lang="en">Description of any exceptions to the Membership Interest Purchase Agreement or issues raised. + xml:lang="en">Lease Jurisdiction And Governing Law, Description + xml:lang="en">Expected system production at P95 which is the expected energy production reached with a probability of 95%. This element is used with the PeriodAxis to indicate the period of production. Usually this will be a year. + xml:lang="en">Continuity Of Operations Program Documentation Uploaded [Member] + xml:lang="en">Inverter Has Certification Other, Description + xml:lang="en">Execution date of the Power Purchase Agreement Amendment. + xml:lang="en">Counterparties To The Interconnection Agreement, Names + + + xml:lang="en">Link to the Letter Of Credit document. + xml:lang="en">Product Code + xml:lang="en">Component Maintenance Actions [Table] + xml:lang="en">Names of counterparties to the funding proposal request. + xml:lang="en">Component Maintenance Cost (Under Warranty) Balance Of System (BOS), Amount + xml:lang="en">Cost Based Incentive Application Date + + + xml:lang="en">Other Equipment Due Diligence Reports, Link + + + xml:lang="en">Identifier for Permission To Operate Interconnection Approval. + xml:lang="en">Duration of the Parent guarantee, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + + + xml:lang="en">Tracker Materials & Workmanship Warranty, Expiration Date + xml:lang="en">Suppliers Contract Review Considered, Flag + xml:lang="en">Availability Of Final Insurance Consultant Report, Flag + xml:lang="en">Name of the company responsible for preparing the Operator Guarantee. - - + xml:lang="en">Lease Project Documents, Description + xml:lang="en">Appraised Value [Axis] + xml:lang="en">Ratio of measured energy to measured energy adjusted for weather. + xml:lang="en">Cultural Resource Identified, Description + xml:lang="en">Indicates if the project has renewable energy certificates. If it does, TRUE; if not, FALSE. + + xml:lang="en">Site Control Title Policy, Description + xml:lang="en">Represents the total outstanding balance for customer accounts that are past due between 91 and 120 days. + - + xml:lang="en">Name of the company that monitors the system. + xml:lang="en">Availability Of Certificate Of Acceptance Report, Flag + xml:lang="en">Indicates if there is a cross default pool for the Individual Contractor Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Approval Condition [Table] - + xml:lang="en">Electrical Inspection Exceptions, Description + + xml:lang="en">Optimizer Certification Listing, Desciption + xml:lang="en">Membership Interest Purchase Agreement Exceptions, Description - - + xml:lang="en">Counterparties To The Closing Certificate, Names + xml:lang="en">Used to group a listing of equipment or products. + xml:lang="en">Description of any exceptions to the Independent Engineering Report or issues raised. - - - + xml:lang="en">Monitoring Contract, Rate Escalator, Percent + xml:lang="en">Shared Facility Agreement, Effective Date + xml:lang="en">Site Address [Abstract] - - + xml:lang="en">Expiration date of the Operations and Maintenance contract. + xml:lang="en">Document Identifier, Notice Of Commercial Operation + xml:lang="en">Grid Code Compliance, Flag - + xml:lang="en">Indicates if the Equity Contribution Guarantee is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Permits And Licenses Expense, Amount + xml:lang="en">Expiration date of the Assignment of Interest. + xml:lang="en">Tax Equity Partner, Partner Shares As Percent Of Total Equity + xml:lang="en">Board Resolution For Master Lessee, Lessee and Operator Exceptions, Description + xml:lang="en">Indicates if the Equity Contribution Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Independent Engineering Production Estimate Report, Effective Date + xml:lang="en">Version number of application software of the monitoring solution. + xml:lang="en">Incentives Actual Inception To Date + - - - + xml:lang="en">Name of the company responsible for preparing the Construction Contractor Notice Of Certification. + xml:lang="en">Environmental Site Assessment II, Recognized Environmental Condition, Description + xml:lang="en">Expected annual DC capacity degradation on the module-level in the first year based on major design/energy production model used. + xml:lang="en">Completion Of Performance Test [Member] + xml:lang="en">Unavailability is a metric that quantifies the amount of energy lost when the system is not operating. This metric compares measured versus expected energy unavailability excluding times external or other outages. This concepts reports the difference which is calculated as Measured – Expected. + xml:lang="en">Allows reporting of multiple event or incidents that occur associated with the ongoing operations of a project. Data reported can include title, date, time before responding to the event or incident, action agreed upon to respond, priority of corrective action. + xml:lang="en">Name of the company responsible for preparing the Site Lease Agreement. - + xml:lang="en">Indicates if there are exceptions to the Certificates of Insurance or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - + xml:lang="en">Availability Of Operator Guarantee, Flag + xml:lang="en">Total guaranteed output associated with the guaranteed firm volume in kWh per the Renewable Energy Credit Contract which is the agreement between the Project Company and the REC offtaker, which could be the investor or bank. + xml:lang="en">Optimizer Maximum System Voltage + xml:lang="en">Cultural Resource Identifier + + + xml:lang="en">Operating Agreements For Master Lessee, Lessee And Operator, Effective Date + xml:lang="en">The measure of the total energy generated per kWp installed over a certain period of time. + xml:lang="en">Notice Of Commercial Operations, Link + xml:lang="en">Priority number assigned to any other action or event;1 is highest priority; 2 is medium; 3 is lowest. + xml:lang="en">Communication protocol of the Data Acquisition System which can be Modbus, Zigbee, WIFI, or Ethernet. + + xml:lang="en">Used to group information about the site control for the site. + + + xml:lang="en">Property Insurance Certificate, Expiration Date + + + xml:lang="en">Use of Funds [Axis] + xml:lang="en">Lessee Collateral Agency Agreement, Effective Date + + + xml:lang="en">Document Identifier, Site License Agreement + xml:lang="en">Master Lease [Abstract] + xml:lang="en">Renewable Energy Credit Contract Performance Guarantee, Description + xml:lang="en">Indicates if the Supplemental Report Review Of Local Tax Review is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Preparer Of Universal Insurance Policy Insurance Policy, Name - + xml:lang="en">Incentives Expected Inception To Date + xml:lang="en">Availability Of Exceptions To The Invoice Including Wiring Instructions, Flag + xml:lang="en">Link to the Financial Lease Schedule document. - - - + xml:lang="en">Used to group information about title surveys related to the site. + xml:lang="en">Identifier for Operations And Maintenance Manual. + xml:lang="en">UCC Tax Lien And Judgment Searches, Link + xml:lang="en">Name of company responsible for repairing or maintaining a specific piece of equipment. + xml:lang="en">Description of insurance requirements in the Power Purchase Agreement. + xml:lang="en">Other Curtailment Model Factor, Amount - + xml:lang="en">Certificate Of Completion, Link + xml:lang="en">Cultural Resource Study [Line Items] + xml:lang="en">Description of any exceptions to the Closing Indemnity Agreement or issues raised. + + + xml:lang="en">Component Maintenance Cost (Under Warranty) Other, Amount + xml:lang="en">Names of counterparties to the Construction Loan Agreement. + xml:lang="en">Inverter, Power Factor Minimum, Overexcited + xml:lang="en">Availability Of Lessee Security Agreement, Flag + xml:lang="en">Expected flip period for the partnership based on a P90 yield. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Information about a Term Loan. + xml:lang="en">Contractors review of part of the Independent Engineer Report covering monitoring service provider. + xml:lang="en">Indicates if there are exceptions to the Security Agreement Supplement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Description of any exceptions to the Tax Opinion or issues raised. - + xml:lang="en">Document Identifier, Co Tenancy Agreement + xml:lang="en">Insurance, Amount of Coverage - - + xml:lang="en">Preparer Of Insurance Consultant Report, Name + xml:lang="en">Financial Transaction For System, SubType, Description - - + xml:lang="en">Substantial Completion, Date + xml:lang="en">Operations Manager Details [Line Items] + xml:lang="en">Module Level Power Electronics Has Rapid Shut Down, Flag + xml:lang="en">Name of the company responsible for preparing the Letter Of Credit Agreement. + xml:lang="en">Information about module certifications. + xml:lang="en">Availability Of Qualifying Facilities Self Certification, Flag + xml:lang="en">Counterparties To The Continuity Of Operations Agreement, Names + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Operations and Maintenance - Preventative Maintenance. + xml:lang="en">Percentage of kWh lost due to shading, for a typical meteorogical month, calculation based on major design/energy production model used. + xml:lang="en">Name of the company responsible for preparing the Lease Contract For Project. + xml:lang="en">Power Purchase Agreement, Description - + xml:lang="en">Indicates if the UCC Security Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">QMS (quality management system) data review report. + xml:lang="en">Name of the company responsible for preparing the Certificate Of Formation For Master Lessee, Lessee And Operator. + xml:lang="en">Earnings Before Income Tax, Depreciation And Amortization + xml:lang="en">Indicates if there are exceptions to the Estoppel Certificate Power Purchase Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - - + xml:lang="en">Total number of batteries in the system. + xml:lang="en">Represents information about appraisals used to value the system. Multiple appraisals can be performed; data about an individual appraisal may include source, status, stage, date, valuation method used, version, useful life of the plant and the storage system, as well as information about the ITC such as the amount of ITC for which the plant and storage system are eligible. - - + xml:lang="en">Collateral Account Balance, Estimate + xml:lang="en">Indicates if credit support is for the Limited Liability Company Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Maintenance cost of signage with no warranty. + xml:lang="en">Grant Amount + + + xml:lang="en">Description of any exceptions to the Operations And Maintenance Contract. + xml:lang="en">Renewable Energy Credit Buyer Acknowledgement, Effective Date - - + xml:lang="en">Used as the identifier for information about the Operations and Maintenance Contract. + xml:lang="en">Information about the Renewable Energy Credit Buyer Acknowledgement for the project. - - + xml:lang="en">Equipment Review Generation Step Up Transformers [Member] - + xml:lang="en">Effective date of the Breakage Fee Agreement. + xml:lang="en">Credit Support Obligor, Type + xml:lang="en">Meter Bidirectional, Flag + xml:lang="en">Expiration date of the Incumbency Certificate, which names individuals at the bank who are allowed to execute docs on behalf of the project company. + xml:lang="en">Appraised value for the total system based on the market comparable method. + xml:lang="en">Names of counterparties to the Membership Certificate of Master Lessee. + xml:lang="en">Washing Water Quantity, Amount + + xml:lang="en">Availability Of Exceptions To The Certificate Of Formation For Master Lessee, Lessee And Operator, Flag + xml:lang="en">Status Report Of Project Scorecard [Member] + xml:lang="en">Name of the company responsible for preparing the Module Accelerated Age Test Report. + xml:lang="en">Indicates if the Permission To Operate Interconnection Approval document is available. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Effective date of the Site License Agreement. + xml:lang="en">Name of the company responsible for preparing the Operational Event Report. + xml:lang="en">EPC Contract Review Considered, Flag + xml:lang="en">Description of any exceptions to the Investment Memo. + xml:lang="en">Description of any exceptions to the Site License Agreement or issues raised. + xml:lang="en">Insurance, Policy Number + + + xml:lang="en">Financial Model Review Of Other Sources Of Revenue [Member] + xml:lang="en">Allowance Account For Credit Losses Of Financial Assets At Beginning Of Period + + + xml:lang="en">Developer [Abstract] + xml:lang="en">Future surplus cash to developer, estimate made at start of project. + xml:lang="en">Identifier for Tax Indemnity Agreement. + xml:lang="en">Used to collect information about customer accounts that have outstanding balances. + xml:lang="en">Initial Funding In Limited Liability Company Agreement, Amount - - + xml:lang="en">Counterparties To The Host Acknowledgement, Names + xml:lang="en">Information about the backup power output for the inverter. + xml:lang="en">Policy owner of the Insurance. + xml:lang="en">Identifier for Liability Insurance Policy. + xml:lang="en">Counterparties To The Lessee Collateral Agency Agreement, Names + xml:lang="en">Date performance warranty expires. The performance warranty guarantees that a solar panel will operate with a given level of efficiency over its lifetime. + xml:lang="en">Transmission And Curtailment Tracking Account Estimate [Member] - + xml:lang="en">County where the installation is located. + xml:lang="en">Deficit Restoration Obligation, Amount + xml:lang="en">Names of counterparties to the Master Lessee Security Agreement. + xml:lang="en">Name of the company responsible for preparing the Renewable Energy Credit Performance Agreement. + xml:lang="en">Funds Flow, Account Name - - - + xml:lang="en">Effective date of the Advisor Invoices. + xml:lang="en">Indicates if there are exceptions to the Certificate Of Completion or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. - - - + xml:lang="en">Environmental Site Assessment, Link - + xml:lang="en">Regulatory Application, Submission Date + xml:lang="en">Name of the host company which should receive Power Purchase Agreement notices regarding activities related to the PPA. The host company is the entity with control of the site for the distributed generation system. + xml:lang="en">Name of the company responsible for preparing the Exposure Report. + xml:lang="en">Description of the developers renewable operating experience for this fund and in aggregate, project names, MW produced, location, geography, performance including availability and production relative to underwriting, commercial operations date, percent of ownership, and indicate if they are managing members of tax equity. + + + xml:lang="en">Document Preparer Of Monitoring Contract, Name + xml:lang="en">Link to the final title policy insurance document. + xml:lang="en">Amount of liquidated damages in the Performance guarantee, which is provided by the operator or developer to guarantee a certain level of operating performance. + xml:lang="en">Letter Of Credit Identifier [Axis] + xml:lang="en">Equipment Type [Axis] + + + xml:lang="en">Expiration date of the Monitoring Contract between the project company and engineering company to monitor system performance. + xml:lang="en">Mobilization fee for backup Operations and Maintenance contract. + xml:lang="en">Availability Of Title Survey, Flag + xml:lang="en">The frequency at which the true up occurs. For example, the true up occurs once per year, once per month. + xml:lang="en">Comment about a major event that happened during the period related to the operations of the project. + xml:lang="en">Length of Home Ownership + xml:lang="en">Document Identifier, Assignment Of Interest + xml:lang="en">Engineering, Procurement and Construction Performance Guarantee, Term + xml:lang="en">Weight of the revenue meter. + + + xml:lang="en">Expected annualized loss due to inverter maximum power point tracking performance based on major design/energy production model used. + xml:lang="en">Expiration date of the Incentive Assignment. + xml:lang="en">Early Buy Out Options [Axis] + xml:lang="en">Reserve Type [Axis] + xml:lang="en">Information about the Punch List. + xml:lang="en">Table containing information about Business Interruption insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + xml:lang="en">Supplemental Report Review Of Insurance Review [Member] + xml:lang="en">Equipment Review Inverters [Member] + xml:lang="en">Power Market, Description + xml:lang="en">Document Identifier, Wiring Instructions + xml:lang="en">Power factor setting of the power system which is defined as the ratio of the real power flowing to the load, to the apparent power in the circuit. It is a dimensionless number in the closed internal of -1 to +1. + xml:lang="en">Indicates if credit support is for the Operations and Maintenance Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Email and phone contact of individual or entity at the system authorized to view security data. + xml:lang="en">Description of any exceptions to the Lessee Claim Documents or issues raised. + xml:lang="en">Link to the cultural resource report. + xml:lang="en">Description of developer reporting requirements. + + xml:lang="en">Biological Resources, Description + + + + xml:lang="en">Indicates if the Letter Of Credit is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + + + xml:lang="en">Utility Rate, Name + xml:lang="en">Site Control, Contract Structure And History, Description + xml:lang="en">Independent Engineering Services Checklist [Axis] + xml:lang="en">Indicates if the Operations And Maintenance Contract is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Name of the product, for example ABC Brand Inverter. + + + xml:lang="en">Tax Indemnity Agreement, Federal Tax Incentive Indemnity Provider, Name + xml:lang="en">Cost of water used to wash. + + xml:lang="en">Used to represent a start date for a future time period, in CCYY-MM-DD format. This axis is used to report values that are estimated into the future. + xml:lang="en">Board Resolution For Master Lessee, Lessee and Operator, Expiration Date + + + xml:lang="en">Appraisal Input, Investment Tax Credit for Storage, Amount - - + xml:lang="en">Description of any exceptions to the Qualifying Facilities Self Certification or issues raised. + + - + xml:lang="en">Description of any exceptions to the Operations And Maintenance Agreement or issues raised. + xml:lang="en">Security Interests Grantee, Type + xml:lang="en">Asset Manager Energy Forecasting Capabilities, Description + xml:lang="en">Accuracy range of the revenue meter voltage, for example +/- 20%. + xml:lang="en">Preparer Of Operations And Maintenance Subcontractor Contract, Name + xml:lang="en">Gross investment balance minus tax incentives minus revenue received from the project at a point in time. + + + xml:lang="en">Module Average Panel Efficiency, Percent + xml:lang="en">Operations And Maintenance Contract, Contractor Performance Guarantee, Percent + xml:lang="en">Pricing Model, Investment Tax Credit, Grant Received, Amount + + + xml:lang="en">Collateral Agent [Abstract] + xml:lang="en">Inverter, Depth + xml:lang="en">Information about the Construction Monitoring Report which is issued by the engineering company. - + xml:lang="en">Description of the scope of the work of the subcontractor in the Operations and Maintenance Contract. + xml:lang="en">Description of the developer governance structure including board members and processes. + + + xml:lang="en">Identifier for Operations and Maintenance Agreement. + xml:lang="en">Preparer Of Operations Manual, Name + xml:lang="en">Entity Fitch Credit Rating + xml:lang="en">System Performance, DC Input, Power + xml:lang="en">Required target return of the investor, at which point the partnership allocation would flip. + xml:lang="en">Availability Of Incentive Assignment, Flag + xml:lang="en">UCC Tax Lien and Judgment Lien Searches Exceptions, Description + xml:lang="en">A PV system or part of a system is considered to be unavailable when it’s status is observed to be non-functional.This measure reports the amount of energy that is unavailable, excluding issues that are outside of the plant's control. + xml:lang="en">Closing Indemnity Agreement, Expiration Date + xml:lang="en">Local Incentive Contract, Link - - + xml:lang="en">Credit Check Performed, Date + xml:lang="en">Tax Rebate Incentive based on the cost of the system + xml:lang="en">Indicates if the test lab used was a Nationally Recognized Testing Laboratory (NRTL) whose Scope of Recognition under the Occupational Safety and Health Administration (OSHA) includes UL 1741. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Table used to capture information about Accounts Receivables balances in various stages of aging by customer. - - + xml:lang="en">Deviations From Measurement Procedures, Description - + xml:lang="en">Section 467 balance, which is the cumulative difference between the amount of rent that has been paid and the amount of rent that has been accrued for tax purposes since the inception of the lease. Represents an amount that, if negative, is the amount the lessor owes to lessee; if positive, represents an amount owed by lessee to lessor. + xml:lang="en">Availability Of Module Factory Audit Report, Flag + xml:lang="en">Identifier for Exposure Report. + xml:lang="en">Credit Support for Interconnection Agreement, Flag + xml:lang="en">Incentive Assignment, Effective Date + xml:lang="en">Description of the type of site, for example, campus, store, factory. + xml:lang="en">Degradation Rate Characterization Tests. - - - - + xml:lang="en">Financing Event, Loan Number + xml:lang="en">Contract term of the sale leaseback. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Expiration date of the Notice and Payment Instructions. + xml:lang="en">Availability of Expense Sinking Fund + xml:lang="en">Site Address Zip Code - + xml:lang="en">Preparer Of Punch List, Name + xml:lang="en">Preparer Of Module Accelerated Age Test Report, Name + xml:lang="en">Natural Resource Permit [Axis] + xml:lang="en">Site Inspections Utility Scale Monthly Physical Inspection [Member] + xml:lang="en">Link to the Liability Insurance Certificate document. - + xml:lang="en">Zoning Covenant, Description + + xml:lang="en">Identifier for Construction Monitoring Report. + xml:lang="en">Indicates if there are exceptions to the Site Lease Access Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Availability Of Operations Manual, Flag + + + xml:lang="en">Date on which credit support should start. + xml:lang="en">Availability Of Exceptions To The Certificates Of Insurance, Flag + + + xml:lang="en">Independent Engineering Report, Effective Date + xml:lang="en">Temperature of the combiner box, the mechanism that brings together multiple solar strings. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Next Payment, Date + xml:lang="en">Security Interest in Engineering Procurement and Construction Agreement, Flag + + + xml:lang="en">Availability Of Master Lease, Flag + xml:lang="en">Contract Review Consumables List [Member] + + xml:lang="en">Information about the Other Equipment Due Diligence Reports which covers technical reviews of major pieces of equipment and identifies exceptions. + xml:lang="en">Comment on Residual Value Review + xml:lang="en">Membership Certificate Of Lessee, Effective Date + xml:lang="en">Performance Based Incentive Rate, Amount Per Power + xml:lang="en">Table containing information about Commercial General Liability insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + + xml:lang="en">Cross Default Pool, Monetizing of Collateral, Flag + xml:lang="en">Link to the certificate of organization for the legal entity. + + + + xml:lang="en">Maintenance cost of Met station with no warranty. + + + - - + xml:lang="en">Site Lease Memo, Link + xml:lang="en">Certificate Of Acceptance Report Exceptions, Description + xml:lang="en">Lease Counterparty, Name + xml:lang="en">Asset Management Contract Exceptions, Description + xml:lang="en">Indicates the system characterization of the site as either Residential, Community Solar, Commercial, Industrial, Agricultural, Utility. + xml:lang="en">Percent of cash distributions to be taxed per the Limited Liability Company Agreement. + xml:lang="en">Array [Table] + xml:lang="en">Typical amount of watts lost through the revenue meter, per manufacturer specification. + xml:lang="en">Passing of Functional (Availability) Test (continuous, autonomous operation with no material equipment failures or clear line of sight to remedy failures, recommended to be at least 5 days for DG, 15 days for US at sufficient solar irradiance). - - - + xml:lang="en">Lessee Claims Document, Link + xml:lang="en">Maintenance cost of other equipment under warranty. + xml:lang="en">Zoning Permit Identifier + xml:lang="en">Zip (postal) Code where the equipment manufacturer is based. + xml:lang="en">Document Identifier, Master Lessee Security Agreement + xml:lang="en">Appraisal Market Comparison, Flag + + + xml:lang="en">String [Member] + xml:lang="en">Expected number of daylight inverter hours from inception to date when there is sufficient daylight to activate the inverters. + xml:lang="en">Number of prefunded months required to have available in the reserve for the project or fund. + xml:lang="en">Equipment review of Medium Voltage Transformers. + xml:lang="en">Estimated percent capacity of the array lost in future periods, e.g., year, month, due to degradation. Should be used with the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">Rental expense for washing equipment. + xml:lang="en">Type of roof which can be Thermoplastic Polyolefin, Ethylene Propylene Diene Terpolymer, Polyvinyl Chloride, Built Up Bituminous, SBS, Asphalt Shingle, Wood Shingle, Composite Shingle, Slate, Metal Roof, Tile Clay, Tile Concrete. + xml:lang="en">Name of the cultural resource item identified. + xml:lang="en">Description of how to access the historian which is a database of performance data used by utility scale Agreement, per the Continuity of Operations Agreement. + xml:lang="en">The latitude of the system at the system meter. The value should be entered in decimal degrees. + xml:lang="en">Measured Energy Availability Balance Of System Issues, Percent + xml:lang="en">Counterparties To The Module Accelerated Age Test Report, Names + xml:lang="en">Co Tenancy Agreement Exceptions, Description + + + xml:lang="en">Financial Transaction For System, Date + xml:lang="en">Optimizer Type + xml:lang="en">Reports and Notifications, Description + xml:lang="en">Information about the Supply Agreements for the project. + xml:lang="en">Availability Of Exceptions To The Master Lease, Flag + xml:lang="en">Cross Default Pool for Master Lease Agreement, Flag + xml:lang="en">Indicates if the Operations And Maintenance Agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Breakage Fee Agreement, Expiration Date + + + xml:lang="en">Site lease expense. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Information specific to battery management system products that are used in the system. + xml:lang="en">Tracker Is Single Axis, Flag + xml:lang="en">Information about the Site License Agreement for the project. + xml:lang="en">Permitting Requirements, Description + xml:lang="en">Module Flash Test Capacity, Power + xml:lang="en">Information about power measures related to the system. + + + + xml:lang="en">Email address for billing contact for Power Purchase Agreement off taker. + xml:lang="en">Reserve Collateral Type - - + xml:lang="en">Module Certification Listing, Desciption + xml:lang="en">Percentage of kWh lost due to operating at non-unity power factor (note: unity power factor should equal 1.0; operating at 0.9 or 1.1 would result in loss of energy or not enough energy produced.), for a typical meteorological year, calculation based on major design/energy production model used. + xml:lang="en">Used as the identifier for the Loss Factor. + xml:lang="en">Maximum percent loss at which a refund will be paid which effectively puts a cap on the amount of refund. For example, if a guarantee specifies that a refund will be made when output falls between 95-98%, and the output falls to 97%, the refunded amount will be based on 97%. If the loss falls to 94%, the loss will be based on the maximum allowable amount at 95%. 95% is the maximum threshold for payment. Other penalities may apply if the loss falls below the threshold. + xml:lang="en">Developer Megawatt Construction Locations, Description + xml:lang="en">Information in the Breakage Fee Agreement which is used if the developer decides not to move forward and the agreement is broken. + xml:lang="en">Indicates if the Pricing File is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Identifier for Universal Insurance Policy. + xml:lang="en">Indicates if the Qualifying Facilities Self Certification is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Used to group information about Property insurance related to the project or the system. + + + xml:lang="en">Continuity Of Operations Agreement, Contracting Parties + xml:lang="en">Availability Of Final Module Accelerated Age Test Report, Flag + xml:lang="en">Availability Of Final Equity Contribution Guarantee, Flag + xml:lang="en">Description of any exceptions to the Property Tax Exemption Opinion or issues raised. + xml:lang="en">Information about maintenance for equipment under warranty. + xml:lang="en">Inverter Output, Rated Frequency + xml:lang="en">Indication as to whether the site has a title policy available. + xml:lang="en">Description of the guarantees in the Engineering Procurement and Construction Agreement. + xml:lang="en">Used as the identifier for a Parent Company. - - + xml:lang="en">Names of counterparties to the Operations Manual. + xml:lang="en">Model number of Data Acquisition System. - - + xml:lang="en">Availability Of Advisor Invoices, Flag + xml:lang="en">Site Lease Memo [Line Items] + xml:lang="en">Availability Of Final Operations Manual, Flag - - + xml:lang="en">Financial model (pro forma) review of other sources of revenue such as performance based incentives, SRECs. + xml:lang="en">Security Interests, Bank Account, Number + xml:lang="en">Site Lease Payment Per Watt + xml:lang="en">Description of the amount, frequency and timing of the recurring fee. + xml:lang="en">System Monitoring Company, Name + - - + xml:lang="en">Property Insurance Earthquake Requirement, Description + xml:lang="en">Represents 15:00 in 24 hour military time, 3:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Indicates if the Supply Agreements is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Zoning Permit Documents, Type, Description + xml:lang="en">Maximum power output, under standard test conditions, of the battery, per IEC62933-1. - - + xml:lang="en">Description of the meteorological station. + xml:lang="en">Number of days the issue takes to be resolved. + xml:lang="en">Actual Cost Of Low Performance From Lost Energy Cost Per kWdc, Amount + xml:lang="en">Indicates the status of the project which can be under development, in construction or in operation. + xml:lang="en">Certificates Of Insurance, Link + xml:lang="en">Notice and Payment Instructions [Abstract] + xml:lang="en">Description of purchaser option to purchase the system, as described in the Power Purchase Agreement. + + + xml:lang="en">Environmental Impact Report, Effective Date + xml:lang="en">Permission To Operate Interconnection Approval Exceptions, Description + xml:lang="en">Completion confirmation of VPN connection to SCADA system at back-up operator's facility via email from investor’s back-up operator. + xml:lang="en">Equity Contribution Agreement Exceptions, Description + xml:lang="en">Description of any exceptions to the Insurance Consultant Report. + + xml:lang="en">Site Identifier [Axis] + xml:lang="en">Description of any exceptions to the Project Administration Agreement or issues raised. + xml:lang="en">Name of tax equity provider. + xml:lang="en">Used to group information about environmental site assessment II reports related to the site. + + + xml:lang="en">Operations Manager Projects, Number + + xml:lang="en">Interconnect Availability, Date + + xml:lang="en">Expected Active Electrical Production at the revenue meter for indicated time period in kWh per IEC 61724-3 using measured weather data during times of availability and including adjustments for parasitic losses. See Section 6.6.6 of IEC 61724-3. This element can be used with the PeriodAxis to indicate the period of measurement and has a period type of instant to measure a point in time. If no Period [Axis] is used, the time period for the value is from the date of the value in the instance document to the end of the life of the system. + xml:lang="en">Initiation date of the Monitoring Contract between the project company and engineering company to monitor system performance. + xml:lang="en">Pro Forma, Initial Insurance Cost, Percent + xml:lang="en">Period Month [Member] + xml:lang="en">Used as the identifier for the natural resource. + xml:lang="en">Deficit Restoration, Limit Per Watt + + xml:lang="en">Name of company where the Power Purchase Agreement invoice is sent. + xml:lang="en">Fund Status, Description + + + xml:lang="en">Document Identifier, LLC Formation Documents + xml:lang="en">Description of any exceptions to the Approval Notice or issues raised. + + + xml:lang="en">Independent Engineering Services Checklist [Domain] + xml:lang="en">Inverter Output, Continuous Power, Amount + xml:lang="en">Transformer Pressure + xml:lang="en">Preparer Of Master Purchase Agreement, Name + xml:lang="en">Name of the rate charged by the utility to the offtaker. + xml:lang="en">Opinion of the advisor reviewing the independent engineering services report. + xml:lang="en">Effective date of the Lessee Security Agreement. + xml:lang="en">Rate escalator percent of the Site Lease Agreement. + xml:lang="en">Renewable Energy Credit Contract Amendment, Execution Date - + xml:lang="en">Property Insurance Certificate, Link - + xml:lang="en">The array's tilt angle in degrees from horizontal, where zero degrees is horizontal, and 90 degrees is vertical and facing the equator (in both the southern and northern hemispheres) + + + xml:lang="en">Description of the transformer design for the inverter. + xml:lang="en">Date preventative maintenance completed. + xml:lang="en">Entity [Table] + xml:lang="en">Effective date of the Independent Engineering Report. + - + xml:lang="en">Authority issuing the permit. + xml:lang="en">Rate in currency per kWdc per year of the Operations and Maintenance contract. + xml:lang="en">Expiration date of the Environmental Site Assessment II. + xml:lang="en">Used to group information about a cultural resource on a site. - + xml:lang="en">Developer Project Performance Guarantee, Initiation Date + xml:lang="en">Indicates if there is a legal entity at the portfolio level. If there is a legal entity, TRUE; if there is no legal entity, FALSE. + xml:lang="en">Model Imperfect Inverter Maximum Power Point Tracking Loss, Amount + + + xml:lang="en">Information indicating the contract supported by the credit support. + xml:lang="en">Indicates if the lien waiver is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Description of the amount of production guaranteed by a solar panel performance warranty, which will guarantee a percentage of production depending on the age of the module. For example, guarantees 80% production after 25 years. + xml:lang="en">Preventative Maintenance Completed, Percent + xml:lang="en">Link to the Security Agreement Supplement document. + xml:lang="en">Manufacturers average percent efficiency rating by which the module can convert sunlight to power at Standard Test Conditions (STC). For example, 20% efficiency rating indicates that 80% of the sunlight that goes into the module is lost. + xml:lang="en">Availability Of Final Tax Opinion, Flag - - + xml:lang="en">System Grid Frequency, Herz - + xml:lang="en">Indicates if there is a cross default pool for the Site Lease Agreement. If it is, TRUE; if it is not, FALSE. - - + xml:lang="en">Name of parallel monitoring provider (activated at start of project, continue working throughout the project) per the Continuity of Operations Agreement which is the plan for the installation going forward including contingencies which may be triggered by financial performance. + xml:lang="en">Represents information about studies on natural resources which are associated with a specific site. Data reported may include a link to the study, identifier, and actions suggested in the study. - - + xml:lang="en">Power Purchase Agreement, Effective Date + xml:lang="en">Mismatch Model Factor, Typical Met Month, Percent + xml:lang="en">Information about equipment in a system related to onboarding. + xml:lang="en">Table containing information about Property insurance, which may be required for different participants to the project such as a contractor, subcontractor, or project owner. + + xml:lang="en">Bank Account [Table] + + + xml:lang="en">Rental payment for solar installation in sales leaseback per the pricing model. + xml:lang="en">Availability Of Exceptions To The Supplemental Report Review Of Local Tax Review, Flag + xml:lang="en">Indicates if the Host Acknowledgement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Escalator percent per year in the Asset Management Contract. + xml:lang="en">Lease Section 467 Balance, Amount + + + xml:lang="en">Incentive Assignment, Link + xml:lang="en">Description of deviations from the test procedures in IEC 61724-3. + + xml:lang="en">Description of termination rights of all parties to the transaction in the Power Purchase Agreement. + xml:lang="en">Information about the UCC Tax Lien and Judgment Lien Searches for the project. + xml:lang="en">Warranty review of Generation Step-up Transformers. + xml:lang="en">American Bankers Association routing number for funds flow wire instructions. + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Washing Plan. + + + xml:lang="en">Initiation date of the Site Lease Agreement. + xml:lang="en">Property Insurance Certificate [Abstract] - - + xml:lang="en">Names of counterparties to the Lessee Security Agreement. + xml:lang="en">Amount of audit fees incurred during the period. + xml:lang="en">Description of the phases of the revenue meter, for example, 240 VAC single phase, per manufacturer specification. + xml:lang="en">Indicates if there are exceptions to the Investment Memo. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Information about the collateral agent. + xml:lang="en">Interconnection Approval, Expiration Date + xml:lang="en">Pricing Model, Average Annual Rent Payment, Amount + xml:lang="en">Information about the Term Sheet for the project. + xml:lang="en">Description of transmission and scheduling responsibilities in the Power Purchase Agreement. + xml:lang="en">Construction Contractor Notice Of Certification [Abstract] + xml:lang="en">Design Review Of Geotech Report [Member] + xml:lang="en">Term of the guarantee. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Approval Memo, Submission Date + + + xml:lang="en">Surety Bond, Number + xml:lang="en">Description of the incentives for the project. + xml:lang="en">Availability Of Exceptions To The Assignment Of Interest, Flag + xml:lang="en">State or province where the equipment manufacturer is based. - + xml:lang="en">Indication as to whether project has leveraged debt. If it does have leveraged debt, TRUE; if it does not, FALSE. + xml:lang="en">Liability Insurance [Abstract] + xml:lang="en">Identifier for Assignment And Assumption Agreement. + xml:lang="en">Seasonal Model Factors [Abstract] + xml:lang="en">Expiration date of the LCC Registration. - - + xml:lang="en">Availability of an Operations and Maintenance manual. If the manual is available, TRUE; if not available, FALSE. + xml:lang="en">Link to the actual zoning permit document. + xml:lang="en">Nominal After Tax Terminal Internal Rate of Return (IRR) per the pricing model. + xml:lang="en">Product Certificate Type, Description + xml:lang="en">Operations And Maintenance Contract [Axis] [No Default] + xml:lang="en">Operational Issues, Date Preventative Maintenance Completed + + xml:lang="en">Independent Engineering Services Checklist Site Review [Member] + xml:lang="en">Description of any exceptions to the Exposure Report. + xml:lang="en">Universal Insurance [Line Items] - - + xml:lang="en">Preparer Of Notice Of Approval, Name + xml:lang="en">Total amount paid toward the system cost by customer at the start of installation. + xml:lang="en">Identifier for Engineering Services Checklist. + xml:lang="en">Name of the company responsible for preparing the Surety Bond Policy Insurance Policy. + xml:lang="en">Description of any exceptions to the notice of approval. + xml:lang="en">Operator Guarantee [Abstract] + xml:lang="en">Information about the pricing model used to determine rates. + + xml:lang="en">Continuity of Operations Agreement, Backup Operations and Maintenance Contract, Counterparty + xml:lang="en">Asset Manager Other Services, Description + xml:lang="en">Availability Of Final Appraisal, Flag + + xml:lang="en">Reportable Environmental Condition [Abstract] + xml:lang="en">Major Reported Event, Description + xml:lang="en">Indication that the MLPE (module level power electronics) has a device that provides module level rapid shutdown as a safety feature defined in NEC 2017. + xml:lang="en">Indicates if the offtaker contract review has been considered. If it has been considered, TRUE; if it has not been considered, FALSE. + xml:lang="en">Name of the company responsible for preparing the Parent Guarantee Agreement. + xml:lang="en">Names of counterparties to the Continuity Of Operations Agreement. + xml:lang="en">Operator Performance Guarantee, Sponsor Performance Guarantee, Initiation Date + xml:lang="en">Information about the Lessee Claim Documents, providing evidence of Lessee’s claim to state rebates, subsidies or incentives for the project. + xml:lang="en">Preparer Of UCC Precautionary Lease Filing, Name + + + xml:lang="en">Link to the Continuity Of Operations Agreement document. + xml:lang="en">Indicates if there are exceptions to the Property Tax Exemption Opinion or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + + xml:lang="en">IECRE Performance Ratios [Abstract] + xml:lang="en">State Tax Credits Amount per Power + xml:lang="en">Energy production estimate contribution from Solar Resource Assessment in kWh. + xml:lang="en">Preparer Of Guarantee Agreement, Name + xml:lang="en">Measured energy availability for the indicated time period due to issues with the single wind turbine indicated calculated as the ratio of the total energy that could have been produced minus the energy lost due to turbine issues divided by the total energy that could have been produced. + xml:lang="en">Information about parallel monitoring. + xml:lang="en">Description of the quality of the work delivered. + xml:lang="en">Represents information about credit that is used to support a particular contract, for example the LLCA, term loan or hedge agreement. Information can include names of provider and receiver of the support, identifier for the contract supported, type and status of credit, obligor and beneficiary, as well as term and dates. + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Site Lease. + xml:lang="en">Actual completion date of the Engineering, Procurement and Construction Agreement. + + xml:lang="en">Counterparties To The Incentive Assignment, Names + xml:lang="en">Link to the Environmental Site Assessment report. + xml:lang="en">Revenue Meter Rating, Continuous Voltage, Line To Line + xml:lang="en">Sponsor Group, Bank Internal Rating + xml:lang="en">Tax Equity Partner Shares, Percent Of Total Equity + + + + xml:lang="en">Effective date of the Environmental Impact Report. + + + xml:lang="en">Inverter Backup Output Maximum Continous Current Per Phase AC, Amount + + + xml:lang="en">Natural Resource Identifier [Table] + xml:lang="en">Developer Project Performance Guarantee, Percent + + xml:lang="en">Document Identifier, Universal Insurance Policy + xml:lang="en">Preparer Of Certificate Of Completion, Name + + xml:lang="en">Actual or forecast collateral account balance. Values reported as forecast should use the StatementScenarioAxis. + + + xml:lang="en">Indicates if the inverter is a microinverter. If it is a microinverter, TRUE; if it is not, FALSE. + xml:lang="en">Information about the project developer. + xml:lang="en">Document Preparer Of Construction Loan Agreement, Name + xml:lang="en">Indicates if there is a cross default pool for the Engineering Procurement and Construction Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Name of analyst covering the fund. + xml:lang="en">Used to group information about the washing and waste for the site. + xml:lang="en">Letter Of Credit Identifier [Line Items] + xml:lang="en">Number of Maximum Power Point Trackers (MPPT). + + + xml:lang="en">Expected annualized loss due to clipping at a maximum AC capacity (inverter or system clipping) based on major design/energy production model used. + xml:lang="en">Pricing Advisor, Name + xml:lang="en">Engineering, Procurement and Construction Performance Guarantee, Description + xml:lang="en">Geotechnical Report Reviewed, Flag + xml:lang="en">Collateral Agent, Project Working Capital Account Collateral Type, Description - + xml:lang="en">Identifier for Washing And Waste Management Agreement. + xml:lang="en">Expiration date of the Easement. + xml:lang="en">Represents the time period of the month of November. Used for this month of any year. + + + xml:lang="en">Inverter Efficiency At Vmax, Percent + xml:lang="en">Description of the asset manager failure and remediation procedures. + xml:lang="en">Document Identifier, Electrical Inspection + xml:lang="en">Zoning Permit [Table] + xml:lang="en">Name of the company responsible for preparing the Investment Memo. + xml:lang="en">Equipment Type [Domain] + xml:lang="en">LLC Formation Documents Exceptions, Description + + xml:lang="en">Power Purchase Agreement, Invoicing Date + xml:lang="en">Reason that the maintenance ticket concerning a component related to the system requires a continuation. + xml:lang="en">Number of strings or input per Maximum Power Point (MPPT). - + xml:lang="en">Maximum (positive) angle of rotation from the vertical plane (at zero degrees) clockwise about the horizontal axis when observed from the equator for north south oriented single axis trackers or from the easterly direction for dual axis trackers or east west oriented single axis trackers. + xml:lang="en">Type of asset being secured, which can be Land, Membership Interest, Contract, Bank Account. + xml:lang="en">Environmental Site Assessment I, Recognized Environmental Condition, Description + + + xml:lang="en">Transformer Style, Description + xml:lang="en">Number of batteries required per inverter. + xml:lang="en">Operations Manager, Federal Tax Identification Number + xml:lang="en">Measured capacity of the individual module, also known as the flash test capacity. + xml:lang="en">Description of parent guarantee. + + + xml:lang="en">Credit Support Amount, Number of Period + xml:lang="en">Expiration date of the Term Sheet. + + + xml:lang="en">Description of the party that is able to declare default. + xml:lang="en">Mechanical Completion Review Commissioning Test String Polarity [Member] + xml:lang="en">Indicates if the Certificate of Acceptance Report is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Information about the module cells. + xml:lang="en">Description of the type of Site Lease Agreement. + + + xml:lang="en">Used to group a listing of information about a Bank Account. + xml:lang="en">Indicates if the Operations And Maintenance Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Counterparties To The Mechanical Completion Certificate, Names + xml:lang="en">Description of a custom transaction that is unique to a fund or billing entity. - - + xml:lang="en">Indicates if hail conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Product Identifier [Axis] [No Default] + xml:lang="en">Monthly fees for duration of the backup asset management program. + xml:lang="en">Percentage of kWh lost due to annualized Parasitic Energy loss (inverters, trackers, etc.) for a typical meteorological year, calculation based on major design/energy production model used. + xml:lang="en">Tracker Materials & Workmanship Warranty expiration date. - - + xml:lang="en">Identifier for Environmental Impact Report. + xml:lang="en">Power Purchase Agreement, Performance Guarantee, Term + xml:lang="en">Counterparties To The Transmission Report and Curtailment Estimate, Names + xml:lang="en">Name of the company responsible for preparing the Qualifying Facilities Self Certification. + xml:lang="en">Continuity Of Operations Agreement, Link + xml:lang="en">Availability Of Final Shared Facility Agreement, Flag + xml:lang="en">Site review of land condition including flood plane. + xml:lang="en">Expiration date of the Site License Agreement. + xml:lang="en">Permits And Assessments Review Easements [Member] + xml:lang="en">Notice Of Commercial Operations Date [Abstract] + xml:lang="en">Term of the Asset Management Contract. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Renewable Energy Credit Buyer Acknowledgement, Expiration Date + xml:lang="en">Reserve Pre Funded Months Required, Number - + xml:lang="en">Exposure Report, Link - - + xml:lang="en">Energy Contract Hourly Rate, Hour 24 [Member] + xml:lang="en">Equipment Review Telco Infrastructure [Member] + xml:lang="en">Counterparties To The Master Lease, Names + xml:lang="en">Equipment review of SCADA System/Meters. + xml:lang="en">Earnings Before Income Tax, Depreciation And Amortization, Estimate + xml:lang="en">Link to the Lessee Claims document. + xml:lang="en">Indicates if the optimizer has ul1741 certification, safety standard. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Names of counterparties to the Certificate of Final Completion. - + xml:lang="en">Indicates that the operational issue is warranty related. If it is environmental health and safety related, TRUE; if it is not, FALSE + xml:lang="en">Description of any exceptions to the Appraisal or issues raised. - - - + xml:lang="en">Amount of the financial transaction related to the system. + xml:lang="en">Project Financing Payment Servicing [Abstract] + xml:lang="en">Name of the consultant who prepared the cultural resource study. + xml:lang="en">Inverter Style, Description + xml:lang="en">Expected percent uptime of the project during normal operating conditions for a specified month, defined per IECRE 61724-3 or through another standard method. - - + xml:lang="en">ACH Payment Discount, Percent + xml:lang="en">Effective date of the Term Sheet. + xml:lang="en">Project State, Name + xml:lang="en">Operational Issues, Intervention Time + xml:lang="en">Description of special features related to regulation. + xml:lang="en">Indicates if diesel soot conditions exist at the site. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Document Identifier, Funding Memo + xml:lang="en">Local Incentive Contract [Abstract] + xml:lang="en">Cross Default Pool for Lease Schedule, Flag + xml:lang="en">Currency on which the contract is based. For example, currency could be USD, British pounds, etc. + + xml:lang="en">Identifier for the Asset Manager. + + + xml:lang="en">Completion Of Operations And Maintenance Manual Review [Member] + xml:lang="en">Engineering, Procurement And Construction Agreement, Contract Documents Available, Flag + + + xml:lang="en">Security Guard Expense, Amount + xml:lang="en">Preparer Of Construction Contractor Notice Of Certification, Name + xml:lang="en">Rated apparent power of the inverter per manufacturers specification in AC. + xml:lang="en">Indicates if the grantee is an SPV or a counterparty. + xml:lang="en">Employee Details [Line Items] + xml:lang="en">Sale Leaseback Counterparty Jurisdiction, Description + xml:lang="en">Permits And Assessments Review DG Risk Assessment [Member] + xml:lang="en">Amount of continuous current per phase of the inverter. + + xml:lang="en">Operations Manager Failure and Remediation Procedures, Description + xml:lang="en">Monitoring Contract, Rate, Power Per Power - - - + xml:lang="en">Document Identifier, Certificates Of Insurance - + xml:lang="en">Availability Of Exceptions To The Interconnection Approval, Flag + xml:lang="en">Names of counterparties to the Notice and Payment Instructions. + xml:lang="en">Information about financial and production performance data, comparison of predicted versus expected. - + xml:lang="en">Description of property insurance to cover pollution requirement. + + + xml:lang="en">Expiration date of the Funding Memo. + xml:lang="en">Authority Having Jurisdiction Identifier - - - + xml:lang="en">Use of Funds, SPV Identifier + xml:lang="en">Names of counterparties to the Commitment Agreement. + xml:lang="en">The percent of the federal Investment Tax Credit that has been vested. + xml:lang="en">Fair market value of the project used to determine the level of the Investment Tax Credit or grant per the pricing model. - + xml:lang="en">Site Environmental Condition High Wind, Flag + xml:lang="en">Secondary Operations and Maintenance Subcontractor Contact, Name and Title + xml:lang="en">Counterparties To The Supply Agreements, Names + xml:lang="en">Counterparties To The Investment Memo, Names - - + xml:lang="en">Indicates if there are exceptions to the Master Lessee Security Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Represents 24:00 in 24 hour military time, 12:00 pm. on the am/pm 12 hour clock. + xml:lang="en">Number of modules that comprise a single string within the sub array, a single unit of modules mounted together and set at the same angle and orientation. + xml:lang="en">Number Of Systems In Fund + xml:lang="en">Rebate Revenue Per Watt + xml:lang="en">Developer Community Engagement, Description + xml:lang="en">Availability Of Exceptions To The Limited Liability Company Agreement, Flag + xml:lang="en">Protection Mechanism, Description + xml:lang="en">Pledge Agreement, Expiration Date + xml:lang="en">Operations Manager Continuity of Operations Program, Description + xml:lang="en">Current Simple Payback, End Date + xml:lang="en">Plant energy production or plant energy metered in the time period divided by the sum of that value and the calculated lost energy in the period (kWh). Energy-Based Availability takes into consideration that an hour in a period with high irradiance is more valuable than in a period with low irradiance. + xml:lang="en">Identifier for Security Agreement Supplement. + xml:lang="en">Availability Of Exceptions To The Module Factory Audit Report, Flag + xml:lang="en">Availability Of Final Operating Agreements For Master Lessee, Lessee And Operator, Flag + xml:lang="en">Energy production estimate contribution from loss estimation (curtailment, shading, soiling, snow, etc.) in kWh. + xml:lang="en">Maintenance cost of racking tracker under warranty. + + + xml:lang="en">Preparer Of Certificate Of Acceptance Report, Name + xml:lang="en">Name of fund legal counsel. + xml:lang="en">Zoning Permit, Recurring Fee Required, Flag + + xml:lang="en">Completion covenant in the Master Purchase Agreement, which covers the agreement of the developer to sell the assets to the investor. + xml:lang="en">Measured Average Insolation For Period + + xml:lang="en">Percent efficiency rating of the inverter at vmax with a specified inverter power level. Vmax is the maximum DC input voltage of the inverter in DC. + xml:lang="en">Indicates if there is a cross default pool for the Power Purchase Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">SubArray Geospatial Layout File Format + + xml:lang="en">Fund Solar Assets, Flag + xml:lang="en">Information related to an issue covering future steps to be taken on the issue. + xml:lang="en">Cross Default Pool for Equity Capital Contribution Agreement, Flag + + xml:lang="en">Credit Support for Equity Capital Contribution Agreement, Flag + xml:lang="en">Link to the Incentive Assignment document. - - + xml:lang="en">Names of counterparties to the Interconnection Agreement. + xml:lang="en">Title Policy Insurance Final Policy, Link + xml:lang="en">Custom Test Condition [Member] + xml:lang="en">Names of counterparties to the Site License Agreement. + xml:lang="en">Equipment Warranties, Expiration Date + xml:lang="en">Notice Of Commercial Operation, Expiration Date + + + xml:lang="en">Information about the Operations and Maintenance Manual for the project. + xml:lang="en">Energy Availability Comparison + xml:lang="en">Sponsor Group Identifier + + xml:lang="en">Rent coverage ratio, defined as Earnings Before Income, Tax, Depreciation and Amortization, divided by rent payments. + xml:lang="en">Operational Performance, Days Of Operation + + + xml:lang="en">Environmental Site Assessment II, Report Author, Name + xml:lang="en">Operations And Maintenance Agreement Exceptions, Description + xml:lang="en">Address of the counterparty to the partnership flip. + xml:lang="en">Debt-to-income ratio, also known as Back End Ratio which is defined as the ratio of a borrower's total monthly debt expense (including mortgage payments, credit card payments, child support, and other loan payments) divided by the borrower's gross monthly income. The ratio is expressed as a percentage of the gross monthly income. Use GSE calculation. + xml:lang="en">Expiration date of the Board Resolution for Master Lessee, Lessee and Operator. + + xml:lang="en">State or province where the system is based. + xml:lang="en">Security Interest in Lease Schedule, Flag + xml:lang="en">Used as the identifier for the cultural resource. + xml:lang="en">Continuity Of Operations Agreement, Expiration Date + xml:lang="en">Power Purchase Agreement, Rate Information [Abstract] + + + xml:lang="en">Transmission Report and Curtailment Estimate, Expiration Date + xml:lang="en">Document Identifier, LLC Registration + xml:lang="en">Preparer Of Membership Certificate Of Lessee, Name + + xml:lang="en">Hedge Agreement Exceptions, Description + + xml:lang="en">Date of the partnership flip when the annual energy output is a P95 yield. + xml:lang="en">Expected Deferred Income, Amount + + xml:lang="en">Tax Equity Partner Shares, Percent Of Class Equity + xml:lang="en">Line items representing information about a Power Purchase Agreement. + xml:lang="en">Supplemental Report Review Of Local Tax Review Exceptions, Description + xml:lang="en">Uncertainty of Expected Energy Based on Total Uncertainty, Percent + xml:lang="en">Names of counterparties to the Funding Memo. + xml:lang="en">Represents information about the Engineering Procurement and Construction Contract, for example, term, description, name of contractor, scope, guaranties, type of contract, etc. - + xml:lang="en">Indicates if there are exceptions to the Pricing File or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Indicates if the Equipment Warranties is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Description of the type of Special Purpose Vehicle, for example Project Company or Fund Company. - - + xml:lang="en">Document Identifier, Operations Manual + xml:lang="en">Approval [Abstract] + xml:lang="en">Names of counterparties to the Renewable Energy Credit Offtake Agreement. - - - + xml:lang="en">Site Lease Assignment [Abstract] + xml:lang="en">Date on which the budget was entered or corrected. + xml:lang="en">Expected PV Production At P90, Energy + + xml:lang="en">Description of developers preferred independent engineers, contact information and other information including willingness to allow other stakeholders to contact them directly. + xml:lang="en">Indicates if the Certificate of Acceptance Report is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Inverter, Width + xml:lang="en">Identifier for the Monitoring Contract Agreement. + xml:lang="en">Amount of acreage where there is vegetation such as trees and grass that must be managed by the project. + xml:lang="en">Link to the Assignment And Assumption Agreement document. + + + xml:lang="en">Entity that is operating the system at the time the certificate is issued. + + xml:lang="en">Pricing Model, Effective Pre Tax Equivalent Internal Rate Of Return, Percent - - + xml:lang="en">Identifier for Term Sheet. + xml:lang="en">Average term in years of Power Purchase Agreement within a fund. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Document Identifier, Lease Schedule + + xml:lang="en">Lease Section 467 Lessor Balance, Amount + xml:lang="en">Represents the time period of the month of September. Used for this month of any year. + + + + xml:lang="en">Information about the design and modeling of the system. + xml:lang="en">Information about whether the model design takes various factors into consideration, for example, soiling, curtailment, snow, non unity power factor, and parasitic loss. + xml:lang="en">Information about any historical instance of money changing hands related to a given fund but not to a specific system in the fund. + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of EPC including substation(s). + xml:lang="en">Names of counterparties to the Building Inspection. + xml:lang="en">Financial Transaction For Fund [Table] + xml:lang="en">Width of the module. + xml:lang="en">Billing contact for Power Purchase Agreement off taker. + xml:lang="en">Operations And Maintenance Provider, Name + xml:lang="en">Fund Tax Equity Details [Abstract] - + xml:lang="en">Expiration date of the insurance. + xml:lang="en">Description of the material used to build the frame or rating as classified by IP 67/IP 68. + + + xml:lang="en">Expiration date of the parent guarantee. + xml:lang="en">Effective date of the Operations and Maintenance Manual. + xml:lang="en">Parent Guarantee, Guarantor + xml:lang="en">Identifier for the beneficiary which is a Counterparty. + + + xml:lang="en">Indicates if there are exceptions to the Equity Contribution Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Guarantee Name + xml:lang="en">Document Identifier, Parent Guarantee Agreement + xml:lang="en">Invoice Including Wiring Instructions [Abstract] + xml:lang="en">Expected flip period for the partnership based on a P75 yield. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Used to group a listing of information about zoning covenants. + + + xml:lang="en">PV DC Capacity, Power + xml:lang="en">PV Design Model + xml:lang="en">Energy Contract, Hourly Rate [Axis] + xml:lang="en">Description of any exceptions to the Equipment Warranties or issues raised. + xml:lang="en">Installation Agreement Exceptions, Description + xml:lang="en">Information specific to Transformer products that are used in the system. + xml:lang="en">Component Maintenance Cost (Under Warranty) Module, Amount + + + xml:lang="en">Information about the washing and waste activities and expenses. + xml:lang="en">Identifier for Certificate Of Formation For Master Lessee, Lessee And Operator. + xml:lang="en">Indicates if the Assignment of Interest is available in final form. If it is available in final form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of the tranformer technology style used such as 2/3/4 winding, Inverter step up transformer. + xml:lang="en">General description of environmental impact of the system, for example, soil and air quality. + xml:lang="en">Orientation Maximum Tracker Rotation Limit, Degrees + xml:lang="en">Credit Support for Membership Interest Purchase Agreement, Flag + xml:lang="en">State where the project is based. + xml:lang="en">Number of months that the project working capital account is prefunded at the start of the project. + xml:lang="en">Module has Certification IEC60364-4-41, protection against electric shock. If it does, TRUE; if it does not, FALSE. + + + xml:lang="en">Approvals Type, Description + xml:lang="en">Site Identifier [Table] + + + xml:lang="en">Local Security Company Expense For Response, Amount + xml:lang="en">Power Purchase Agreement, Term + xml:lang="en">Counterparties To The Lien Waiver, Names + xml:lang="en">Device [Abstract] + xml:lang="en">PV Installation Costs of Manufacturer, Amount + xml:lang="en">LLC Formation Documents [Abstract] + xml:lang="en">American Land Title Association Survey, Status + xml:lang="en">The Investment Tax Credit-eligible amount for the storage component. - - + xml:lang="en">Effective date of the Approval Notice. + xml:lang="en">Appraisal [Abstract] + xml:lang="en">System Availability By Month, Actual, Percent + xml:lang="en">Description of any exceptions to the Mechanical Completion Certificate. + xml:lang="en">Contractors review of part of the Independent Engineer Report covering EPC, high voltage (if applicable) and any other main subs. - + xml:lang="en">Availability Of Exceptions To The Equity Contribution Guarantee, Flag + xml:lang="en">Title Policy Exception, Description + xml:lang="en">Credit Support Provider, Name + xml:lang="en">Appraised value for the total system based on the income method. + xml:lang="en">Engineering, Procurement and Construction Guaranteed Energy Output, Energy - - + xml:lang="en">Identifies the status of the budget, for example, preliminary, indicative or final. + xml:lang="en">Link to the Monthly Operating Report document. + xml:lang="en">Energy Contract Hourly Rate, Hour 8 [Member] + xml:lang="en">UUID identifier for a specific entity. + xml:lang="en">Invoicing date of the Operations and Maintenance contract. - + xml:lang="en">Identifier for Advisor Invoices. + xml:lang="en">Credit Support Amount, Period Amount + xml:lang="en">Used as the identifier for the target balance. - - - + xml:lang="en">Effective date of the Membership Interest Purchase Agreement. - + xml:lang="en">Risk Priority Number which is a numeric indicator of the health of the plant. + xml:lang="en">Counterparties To The Construction Loan Agreement, Names - - + xml:lang="en">Backup Operations and Maintenance Contract, Term + xml:lang="en">Fund Reserve [Member] + xml:lang="en">Document Identifier, Partnership Flip Contract For Project + xml:lang="en">Email address of the Principal to the surety bond. + xml:lang="en">Items on the Independent Engineering Services Checklist regarding design review. + xml:lang="en">Measured Energy Weather Adjusted, Amount + xml:lang="en">URL link to the drawing of the system. + xml:lang="en">Availability Of Master Purchase Agreement, Flag + + + xml:lang="en">Co Tenancy Agreement, Link + xml:lang="en">Expiration date of the Other Equipment Due Diligence Reports. + xml:lang="en">Description of special covenants in the Master Purchase Agreement which covers the agreement of the developer to sell the assets to the investor. + xml:lang="en">Inverter Power At 30 Percent Power Level [Member] + xml:lang="en">Name of the Engineering Procurement and Construction contractor. + xml:lang="en">Property Insurance Flood Requirement, Description + xml:lang="en">Status Report Of Independent Engineering Reports [Member] + xml:lang="en">Energy consumed by the project, kWh per time period based on major design/energy production model used. + + + xml:lang="en">Site Permit Review Considered, Flag + xml:lang="en">Names of counterparties to the Incentive Assignment. + xml:lang="en">Used to define the hour of the day. + xml:lang="en">Indicates if credit support is for the Equity Capital Contribution Agreement. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Table used to describe the costs by equipment type. Device cost can be reported as an aggregate or can be broken down by indiviual classes of equipment. + xml:lang="en">Accounts Receivable Customer Name + xml:lang="en">Engineering, Procurement And Construction Agreement, Construction Documents Available, Flag + xml:lang="en">Expected P50 Insolation + xml:lang="en">kWh output guaranteed by the developer for the project. + xml:lang="en">Effective date of the Operating Agreements for Master Lessee, Lessee and Operator. - + xml:lang="en">Asset Management Contract, Counterparty + xml:lang="en">Counterparties To The Funding Memo, Names - - + xml:lang="en">Description of the security of the Letter of Credit. + xml:lang="en">Availability Of Exceptions To The Site Lease Assignment, Flag + xml:lang="en">Independent Engineering Services Checklist Supplemental Reports Review [Member] + xml:lang="en">Indication as to whether the meter is revenue grade. If it is revenue grade, TRUE; if not revenue grade, FALSE. - + xml:lang="en">IECRE Financing Event [Line Items] + xml:lang="en">Insurance Consultant Report [Abstract] + xml:lang="en">Availability Of Asset Management Contract, Flag + xml:lang="en">Identifier for Commercial General Liability Insurance Policy. + xml:lang="en">Indicates the investment status of the project which can be awarded, committed, partially funded, or fully funded. + + - + xml:lang="en">Availability Of Exceptions To The Lessee Collateral Agency Agreement, Flag + xml:lang="en">Indicates if there are exceptions to the Site Lease Memo or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Equipment Calibration Expense, Amount + xml:lang="en">Revenue Meter Dimensions [Abstract] + xml:lang="en">Credit Support for Master Lease Agreement, Flag + xml:lang="en">Inverter Built In Meter Availability, Flag - + xml:lang="en">Identifier for Incentive Assignment. + xml:lang="en">Guarantor Name + xml:lang="en">Power measured at the targeted measurement conditions per IEC 61724-2 in kW. + xml:lang="en">Model Ambient Temperature + xml:lang="en">Indicates if the entity or counterparty is an Operations And Maintenance Contractor; if it is, TRUE; if it is not, FALSE. + + + xml:lang="en">Used as the identifier for the funds. - + xml:lang="en">Accrual account deposit as percent of gross purchase price. + + + xml:lang="en">Indicates if there are exceptions to the Incumbency Certificate or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Represents information identified about a Power Purchase Agreement. + xml:lang="en">Description of any exceptions to the Certificates of Insurance or issues raised. + xml:lang="en">Regulatory Application, Link + xml:lang="en">Document Identifier, Power Purchase Document + xml:lang="en">Warranties Review Generation Step Up Transformers [Member] + xml:lang="en">Represents 07:00 in 24 hour military time, 7:00 am. on the am/pm 12 hour clock. + + + xml:lang="en">Solar Sub Array Identifier [Axis] - + xml:lang="en">Flag indicating if the surety bond is electronic. If it is electronic, TRUE; if it is not electronic, FALSE. + xml:lang="en">Mechanical completion review - check for confirmation all major equipment has been installed per plan including substations. + xml:lang="en">Indicates if there are exceptions to the Board Resolution for Master Lessee, Lessee and Operator or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Counterparties To The Assignment Of Interest, Names + xml:lang="en">Name of the company responsible for preparing the Supply Agreements. + xml:lang="en">Description of any exceptions to the Term Loan or issues raised. + xml:lang="en">PV AC Capacity, Power + xml:lang="en">Measured energy availability for the indicated time period calculated from the measured weather data and observed availability which can be obtained by dividing Expected Energy At Revenue Meter by Expected Energy At Unavailable Times. For solar, use IEC 61724-3, Section 6.8. + xml:lang="en">Power Purchase Agreement, Notices Contact, Email Address + + + xml:lang="en">Link to the Supply Agreements document. + xml:lang="en">Expected annualized loss due to module orientation based on major design/energy production model used. + xml:lang="en">Indicates that the fund has solar projects in it. If the fund does have solar projects, TRUE. If it does not, FALSE. + xml:lang="en">Type of file format used for the GIS File which could be GeoJSON, Shapefile, KML or GML. + xml:lang="en">Guarantee Measurement, Units + xml:lang="en">Identifier for Closing Indemnity Agreement. + xml:lang="en">Availability Of Final Title Survey, Flag + xml:lang="en">Description of any exceptions to the Shared Facility Agreement or issues raised. + xml:lang="en">Irradiance for Power Target Cap Measurement + xml:lang="en">Preparer Of Shared Facility Agreement, Name + xml:lang="en">Prefunded amount set aside by project company for working capital account in the fund. + xml:lang="en">Site Details [Line Items] + xml:lang="en">Maximum operating temperature of the combiner box, the mechanism that brings together multiple solar strings. This is used in a product specification to indicate the operating temperature of the combiner box. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Term of the warranty on the Engineering Procurement and Construction Agreement. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Title Survey, Link + xml:lang="en">Power Purchase Agreement, End Of Term Provisions, Description + xml:lang="en">Pricing Model, Effective Pre Tax Equivalent Terminal Internal Rate Of Return, Percent + xml:lang="en">Effective date of the Property Tax Exemption Opinion. + xml:lang="en">Appraisal Income Approach, Flag + xml:lang="en">Maximum power output, in AC, of the inverter model, IEC62933-1 - + xml:lang="en">Date on which credit support should end - + xml:lang="en">Description of any exceptions to the liability insurance certificate. - + xml:lang="en">Primary Operations And Maintenance Subcontractor Address + + + xml:lang="en">Contract Review Engineering Procurement and Construction Schedule [Member] + xml:lang="en">Percent of component maintenance completed. + xml:lang="en">Represents information about multiple periodic energy budgets. - + xml:lang="en">Availability Of Exceptions To The Liability Insurance Certificate, Flag + xml:lang="en">Appraisal Details [Line Items] + xml:lang="en">Indicates if the Construction Monitoring Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Name of the governing authority that issued permit + xml:lang="en">Information about details of IECRE certificates. + xml:lang="en">Zoning Permit Documents Details [Line Items] + xml:lang="en">Engineering, Procurement and Construction Contract [Abstract] + xml:lang="en">Permits and assessments review of Building permits (confirm completion). - + xml:lang="en">Pricing Model, Depreciation Method, Description + xml:lang="en">FICO Score + xml:lang="en">Used to indicate a generic period of time such as a quarter or month that is not related to a specific time span. For example rental expense for a month, or monthly . Includes specific months and the concept of a month. + xml:lang="en">Design Review Of Electrical Report [Member] + xml:lang="en">Effective date of the property insurance certificate. + + + xml:lang="en">Cross Default Pool for Asset Management Agreement, Flag + xml:lang="en">Name of contracting parties to the Continuity of Operations Agreement, which may include the project company, operator, or developer. + + + xml:lang="en">S&P rating of the provider of the Letter of Credit. + xml:lang="en">Asset Manager Billing Method, Description + xml:lang="en">Financial Model Review Of Revenue [Member] + xml:lang="en">Availability Of Exceptions To The Closing Indemnity Agreement, Flag + xml:lang="en">Cross Default Pool for Hedge Agreement, Flag + xml:lang="en">Used as the identifier for permit actions related to the natural resource. + xml:lang="en">Preparer Of LLCA Agreement, Name + xml:lang="en">Select the cell technology style used such as CSI, CdTe, CIGS, PSI, TFSC, BIPV, BiFacial, ASi, MonoSi, MultiSi, CPV, ASi (triple), ASi (tandem), ribbon, HIT (Heterojunction with Intrinsic Thin Layer), Other. + +. + xml:lang="en">Description of special provider rights and obligations in the Power Purchase Agreement. + xml:lang="en">Engineering, Procurement And Construction Agreement, Workmanship Warranty Available, Flag + xml:lang="en">Represents information about the Engineering Procurement and Construction contract. - + xml:lang="en">Product Identifier, Inverter [Abstract] + xml:lang="en">Operational Performance [Abstract] + xml:lang="en">Operations And Maintenance Contract, Termination Rights, Description + xml:lang="en">Security Interest in Operations and Maintenance Agreement, Flag + + + xml:lang="en">Simple Payback + xml:lang="en">Cost of the security guard. - + xml:lang="en">Installation Costs paid to the manufacturer, excludes cost of equipment. + xml:lang="en">Sector Of Fund, Description + xml:lang="en">Review of report for module factory audit reports typically by Independent Engineer. + + + xml:lang="en">Interconnection Agreement, Effective Date + xml:lang="en">Information about the Local Incentive Contract which can be a state, city or county incentive (not federal). amount, units, description, counterparties, effective date. + xml:lang="en">Actual Operating Expenses To Expected, Percent + xml:lang="en">Indicates if there is a cross default pool for the Asset Management Agreement. If it is, TRUE; if it is not, FALSE. + + - - + xml:lang="en">Identifier for Lessee Claim Documents. + xml:lang="en">Approval Condition, Description + xml:lang="en">IECRE System Availability [Abstract] + xml:lang="en">Funds Flow Recipient, Name - + xml:lang="en">Expiration date of the Limited Liability Company Agreement. + xml:lang="en">Inverter Transformer Design, Description + xml:lang="en">Used to group information about Business Interruption insurance related to the project or the system. + xml:lang="en">Used to group information about operational events and issues related to the system. + xml:lang="en">Financial Transaction For Fund, Date - + xml:lang="en">Used to group a listing of information about Credit Support. + xml:lang="en">Document Identifier, Supply Agreements + xml:lang="en">System Structure, Description - - - - - + xml:lang="en">Description of outstanding issues that must be resolved after the project has been funded. + xml:lang="en">Information about the agreement identifiers associated with the cross default pool. + xml:lang="en">Identifier for Building Inspection. + xml:lang="en">Link to the Construction Monitoring Dashboard. + xml:lang="en">Description of limitation of liability in the Master Services Agreement. + xml:lang="en">Identifier for Performance Guarantee Agreement. + xml:lang="en">IECRE Certificate [Abstract] + xml:lang="en">Used as the identifier for the Bank Accounts. + xml:lang="en">Information about the Funding Memo for the project. - + xml:lang="en">Termination Value Gap, Amount + xml:lang="en">Counterparties To The Equipment Warranties, Names + xml:lang="en">Availability Of Notice Of Commercial Operation, Flag + xml:lang="en">Estimated Measures [Table] + xml:lang="en">Fire Risk Report Sumitted, Flag + xml:lang="en">Name of consultant who prepared the Environmental Site Assessment Report. + xml:lang="en">Identifier for Credit Report Documents. - + xml:lang="en">Operations And Maintenance Contract, Contract Structure And History + xml:lang="en">Information about the operator performance sponsor guarantee. + xml:lang="en">Represents information about individual projects within a fund such as asset and class type, status, location and stage of development. - + xml:lang="en">Indicates if the module has a built-in DC Optimizer, if it does, TRUE; if it does not, FALSE. + xml:lang="en">LLC Formation Documents, Effective Date + + + xml:lang="en">Description of any exceptions to the Certificate of Formation for Master Lessee, Lessee and Operator or issues raised. + + + xml:lang="en">Gross investment balance minus revenue received from the project at a point in time. + xml:lang="en">Availability Of Final Monitoring Contract, Flag + xml:lang="en">Link to the Certificate Of Final Completion document. + xml:lang="en">Operations Manager Supply Strategy, Description + xml:lang="en">Date at which lease escalator goes into effect. + xml:lang="en">Construction Contractor Notice Of Certification Exceptions, Description + xml:lang="en">Names of counterparties to the Membership Interest Purchase Agreement. + + + xml:lang="en">Module Orientation + xml:lang="en">Operations And Maintenance Contract, Effective Date + xml:lang="en">Indicates if the Project Administration Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">IECRE Rules Of Procedure Met, Flag + + + xml:lang="en">Parent Guarantee, Beneficiary + xml:lang="en">Preparer Of Equity Contribution Document, Name + xml:lang="en">Mechanical completion review - check for commissioning test for string polarity, if not already covered in short circuit current testing. + xml:lang="en">State Tax Credits Term + + + xml:lang="en">Name of the company responsible for preparing the Term Loan Agreement. + xml:lang="en">Represents the time period of the month of December. Used for this month of any year. + xml:lang="en">Name of entity contracting with (paying) the IECRE CB (Certification Body). + xml:lang="en">Counterparties To The Estoppel Certificate Power Purchase Agreement, Names + xml:lang="en">Description of developer project commissioning and performance testing methods. + - + xml:lang="en">Power Purchase Agreement, Buyout Options, Description + xml:lang="en">Use Of Funds [Abstract] + xml:lang="en">Product Identifier, Tracker [Abstract] + xml:lang="en">Project Wind Status + xml:lang="en">Names of counterparties to the Investment Memo. + xml:lang="en">Insurance NAIC Number + xml:lang="en">Home Appraisal, Date + xml:lang="en">Expiration date of the LLC Formation Documents. + xml:lang="en">Name of the company responsible for preparing the Closing Certificate. + xml:lang="en">Description of the asset manager warranty claims experience and warranty work management. + xml:lang="en">Link to FERC 203 approval notice. + xml:lang="en">Date on which the cultural resource permit was issued. + + + xml:lang="en">Identifies whether this is a permit for the plant, gen tie line, or substation. + + xml:lang="en">Engineering, Procurement And Construction Agreement, Contract History And Structure, Description + xml:lang="en">Notice Of Commercial Operation, Effective Date + + xml:lang="en">Description of the operations manager billing method. + xml:lang="en">Document Identifier, Lessee Security Agreement + xml:lang="en">Form and version number of the insurance policy. + xml:lang="en">Names of counterparties to the Certificate of Acceptance Report. + xml:lang="en">Identifier for Environmental Assessment I. + xml:lang="en">Description of the Inverter Ground Fault Detector Interrupter which is a fuse that trips when ground fault current exceeds the ampere rating of the fuse. + + + xml:lang="en">Measured Energy Available Excluding Times Of External Or Other Outages, Energy + xml:lang="en">Indicates if there is a cross default pool for the Operations and Maintenance Agreement. If it is, TRUE; if it is not, FALSE. - + xml:lang="en">Indicates if there are exceptions to the Module Accelerated Age Test Report. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">The ratio of the photovoltaic array area to the total ground area. For an array configured in rows of modules, the GCR is the length of the side of one row divided by the distance between the bottom of one row and the bottom of its neighboring row. An array with a low ground coverage ratio (closer to zero) has rows spaced further apart than an array with a high ground coverage ratio (closer to 1). +The ground coverage ratio must be a value greater than 0.01 and less than 0.99. + xml:lang="en">Indicates if both parties can cross the default. If both can, TRUE; if not, FALSE. + xml:lang="en">Other Permits, Link + xml:lang="en">Represents the time period of the month of March. Used for this month of any year. + xml:lang="en">Counterparties To The Master Purchase Agreement, Names + + + xml:lang="en">Term of the Master Services Agreement. The value should be entered using the ISO8601 format of PnYnMnDTnHnMnS. For example, a 5-year term would be represented as P5Y, a 3-month term as P3M, and a 4-year, 6-month and 10-day term would be represented as P4Y6M10D. + xml:lang="en">Used to identify power levels for an inverter, for example 10% power level, 20% power level, 30% power level, weighted percent, etc. + xml:lang="en">Pricing Model, Tax Equity Contribution, Amount + xml:lang="en">Names of counterparties to the Host Acknowledgement. + xml:lang="en">Cost of disposing of waste. + + + + xml:lang="en">Present Value of the Project + xml:lang="en">Identifier for Asset Management Agreement. + xml:lang="en">Energy Contract Hourly Rate, Hour 1 [Member] + xml:lang="en">Membership Interest Purchase Agreement, Link + xml:lang="en">Closing Documents [Axis] + xml:lang="en">Total days of production lost due to issues. + xml:lang="en">Information about the Equity Contribution Agreement which is an agreement between two or more parties agreeing to pool certain capital, cash, and other assets in a company to conduct certain business in exchange for equity in the company conducting the venture. + xml:lang="en">Natural Resource Identified Location, Description + + + xml:lang="en">Represents 16:00 in 24 hour military time, 4:00 pm. on the am/pm 12 hour clock. - - - + xml:lang="en">Description of the state tax credit program. + xml:lang="en">Indicates if the Interconnection Approval is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">IECRE Financing Event [Table] + xml:lang="en">Reportable Environmental Condition, Description + xml:lang="en">Exception is made to the passing of the Performance Test. + xml:lang="en">Counterparties To The Equity Contribution Agreement, Names + xml:lang="en">Soiling Model Factor, Typical Met Year, Percent + xml:lang="en">Employee, First Name + xml:lang="en">Project Address Zip Code + xml:lang="en">Name of the beneficiary of the Letter of Credit. + xml:lang="en">Measured Insolation To Weather Adjusted Insolation, Percent + xml:lang="en">FICO Model, Origination + xml:lang="en">Name of the company responsible for preparing the Tax Indemnity Agreement. + xml:lang="en">Revenue Meter Operational Temperature + xml:lang="en">Description of Earthquake Requirement in Property Insurance - - + xml:lang="en">Indicates if the Monthly Operating Report is at the Site Level, Fund Level, or Project Level. + xml:lang="en">Supply Agreements, Effective Date + xml:lang="en">Independent Engineering Report, Link + xml:lang="en">Name of insurance consultant (hired to work on the solar installation project). + xml:lang="en">Entity Is Utility, Flag - + xml:lang="en">Electrical Completion, Date + xml:lang="en">Link to the pro forma document for the title policy. + xml:lang="en">Guarantee Reconciliation Period + xml:lang="en">Identifier for Sales Leaseback Contract For Project. + xml:lang="en">Ratio of actual measured energy to expected energy at the revenue meter, per IECRE 61724-3. + xml:lang="en">Indicates if there are exceptions to the Environmental Site Assessment II or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Credit Support for Asset Management Agreement, Flag - + xml:lang="en">Point in time for which value is appraised, for example, at commercial operations date, at flip point, at PPA expiration. + xml:lang="en">Escalator which is the percentage increase in rate per year in the financial contract between a homeowner and a residential solar company, or between a commercial building owner and a C&I solar company. + xml:lang="en">Availability Of Final Invoice Including Wiring Instructions, Flag + xml:lang="en">Asset Management Contract [Abstract] + xml:lang="en">Limited Liability Company Agreement, Sponsor Capital Contribution, Amount + xml:lang="en">Regulatory FERC205 Application, Link + xml:lang="en">Inverter Output Phase, Type + xml:lang="en">Identifier for the use of funds for an individual financing event. + xml:lang="en">Availability Of Pledge Agreement, Flag + xml:lang="en">Fund Sponsor Company, Name + xml:lang="en">Indicates if the Interconnection Agreement is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability Of Exceptions To The LCC Registration, Flag + xml:lang="en">Description of key terms in the Operations and Maintenance Continuity contract. + xml:lang="en">Effective date of the Notice and Payment Instructions. + xml:lang="en">Zoning Permit Documents [Table] + xml:lang="en">Electrical Inspection, Expiration Date + xml:lang="en">State Tax Credits Current, Flag + + + xml:lang="en">Names of counterparties to the notice of approval. + xml:lang="en">Unlevered Internal Rate Of Return, Percent + xml:lang="en">Site Environmental Condition Industrial Emissions, Flag + xml:lang="en">Portfolio [Line Items] + xml:lang="en">Security Guard Company, Address + xml:lang="en">Items on the Independent Engineering Services Checklist regarding review by contractors. + xml:lang="en">Represents a Product Class to describe types of products used in the system or plant. + xml:lang="en">Availability Of Exceptions To The Electrical Inspection, Flag + xml:lang="en">Names of counterparties to the Local Incentive Contract. + xml:lang="en">Operations And Maintenance Contract Review Considered, Flag + xml:lang="en">Breakage Fee For Investor, Amount + xml:lang="en">Indicates if there are exceptions to the UCC Tax Lien and Judgment Lien Searches or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Used to group a listing of information about Cross Default Pool Amount. + xml:lang="en">Indicates if the Master Lease is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Module Reliability Testing Statistical Module Batch Test Report [Member] + xml:lang="en">Target amount of reserve. + xml:lang="en">Indicates if the Property Tax Exemption Opinion is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Division of State Architect Approval Required, Flag + xml:lang="en">Effective date of the Easement. + xml:lang="en">Predicted energy available is calculated as predicted energy (at unity availability which means that energy is available all the time) multiplied by predicted availability equals predicted energy (at predicted availability). For example, if 10,000 MWh is predicted for unity availability and we predict availability of 0.99, then predicted energy is 9,900 MWh. 10,000=9,900/0.99. This element should be used with the PeriodAxis to indicate the period such as year. + + xml:lang="en">Identifier for Lease Contract For Project. + xml:lang="en">Expiration date of the developer performance guarantee for the project. + xml:lang="en">Funding Proposal Request, Link - - + xml:lang="en">Link to the Other Equipment Due Diligence Reports document. + xml:lang="en">Credit Support Associated Contract [Abstract] + + xml:lang="en">Effective date of the Funding Memo. + xml:lang="en">Operating Agreements For Master Lessee, Lessee And Operator Exceptions, Description + xml:lang="en">Description of buyout options in the Power Purchase Agreement. + xml:lang="en">Status report on Independent Engineer Opinion Letter for sales lease-back. + xml:lang="en">Availability Of Environmental Site Assessment II, Flag + xml:lang="en">Availability Of Exceptions To The Construction Contractor Notice Of Certification, Flag + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of EPC schedule. + + + xml:lang="en">Link to the Membership Certificate of Master Lessee document. + xml:lang="en">Security Software Upgrades Expense, Amount + xml:lang="en">Standardized form name and version of the form used for the letter of credit. + xml:lang="en">Name of the company responsible for preparing the Construction Issues Report. + xml:lang="en">Represents information about the Operations and Maintenance Contract such as term, contracting parties, scope of work, etc. + + + xml:lang="en">Type Of Device [Enumerated] + xml:lang="en">Represents information related to a bank account which can include account number, routing number, type of bank account, identifier for the special purpose vehicle to which the account is associated, and name of bank. + xml:lang="en">Membership Certificate Of Lessee, Link - + xml:lang="en">Preparer Of Term Loan Agreement, Name + xml:lang="en">Operations And Maintenance Contract, Performance Guarantee, Description + xml:lang="en">Start time and date of individual issue. + + + xml:lang="en">Description of action required by the natural resources permit, for example, a fee or covenant. + xml:lang="en">Availability Of Exceptions To The Construction Monitoring Report, Flag - + xml:lang="en">Performance guarantee output as percent of P50 energy production. + xml:lang="en">Number of Megawatt construction projects developer has performed. + xml:lang="en">Power Purchase Agreement Performance Guarantee Initiation Date + + + xml:lang="en">Expiration date of the Lessee Security Agreement. + xml:lang="en">Supply Agreements, Link + xml:lang="en">Indication as to whether there is a data collection substation located at the site. + xml:lang="en">Name of the offtaker. + xml:lang="en">Represents different classes of investors, for example Class A investors, Class B investors . + xml:lang="en">Depositary Bank Of The Collateral Agent + xml:lang="en">Identifier for Supplemental Report Review Of Local Tax Review - + xml:lang="en">Document Identifier, Operations and Maintenance Document + xml:lang="en">Asset Manager Performance By Geography [Table] + xml:lang="en">Identifier for the employee granting approval. + xml:lang="en">Period in which the curtailment amount or percent is estimated, in 'PnYnMnDTnHnMnS' format, for example, 'P1Y5M13D' represents reported fact of one year, five months, and thirteen days, or 'P1Y' represents a reported fact for one year, or 'P1M' represents a reported fact for one month. Should be used with the EstimationPeriodStartDateAxis which represents the starting date for the period. + xml:lang="en">Approval Memo [Line Items] + xml:lang="en">Commitment Agreement Exceptions, Description + xml:lang="en">Invoice Including Wiring Instructions, Link + xml:lang="en">Number of projects under management by Operations and Maintenance manager. + xml:lang="en">Power Purchase Agreement Actual revenue generated from inception to date. + xml:lang="en">Business Interruption Insurance [Abstract] + xml:lang="en">Availability Of Final Local Incentive Contract, Flag + xml:lang="en">Energy Budget [Table] + + + xml:lang="en">Identifier for Continuity Of Operations Agreement. + xml:lang="en">Availability Of Incumbency Certificate, Flag + xml:lang="en">Link to the Property Insurance Certificate document. + xml:lang="en">Power Purchase Agreement, Portion of Units + xml:lang="en">Link to the Environmental Site Assessment I document. + xml:lang="en">Installation Type [Domain] + xml:lang="en">Financing Event [Abstract] - - + xml:lang="en">Hedge Agreement, Expiration Date + xml:lang="en">Represents the total outstanding balance for customer accounts. + xml:lang="en">Asset Manager Projects Owned by Manager to Projects Owned By Third Party, Percent + xml:lang="en">Information about the fund. + xml:lang="en">Title Survey [Line Items] + xml:lang="en">Guarantee Commencement Date + xml:lang="en">Review of report for module lab testing reports typically by Indendent Engineer. + xml:lang="en">Identifier for Estoppel Certificate Power Purchase Agreement. + xml:lang="en">Information contained in a credit check report. + xml:lang="en">Estimated Degradation [Abstract] + xml:lang="en">Operating Expenses Cost Per Watt + xml:lang="en">Natural Resource Permit Action [Line Items] + xml:lang="en">Independent Engineering Services Checklist Warranties Review [Member] + xml:lang="en">Review of report for construction monitoring reports typically by Indpendent Engineer. + xml:lang="en">Indicates if there are exceptions to the Lessee Collateral Agency Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Type of Security Interest, which can be Mortgage, Deed of Trust, Lien, Pledge, Collateral Assignment. + + + + xml:lang="en">Names of counterparties to the Design and Construction Documents. + xml:lang="en">Multiplier indicating the amount that the module can operate at above the nameplate capacity. For example at factor of 1.1, can safely operate 10% above the stated nameplate capacity rating. + xml:lang="en">Description of special features in the Power Purchase Agreement. + xml:lang="en">Asset Manager Spare Parts Management Strategy, Description + xml:lang="en">Indicates if there are exceptions to the Assignment and Assumption Agreement or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Availability Of Exceptions To The Mechanical Completion Certificate, Flag + xml:lang="en">Indicates if the Equity Contribution Guarantee is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Indicates if the inverter is part of an ACPV Module. If it is, TRUE; if it is not, FALSE. + xml:lang="en">Availability Of Final Environmental Site Assessment II, Flag + xml:lang="en">Counterparties To The Construction Monitoring Report, Names + xml:lang="en">Link to the Module Factory Audit Report document. + xml:lang="en">Parent Guarantee, Minimum Liquidity, Amount + xml:lang="en">Identifier for UCC Security Agreement. + xml:lang="en">Module has certification UL1703, fire rating. If it does, TRUE; if it does not, FALSE. + xml:lang="en">Description of the operations manager consumables strategy. consumables are items such as fuses that are used up quickly and must be replenished. + + xml:lang="en">This is the maximum input current, based on PV module, that the optimizer can handle. + + + xml:lang="en">Guaranteed obligation amount. + xml:lang="en">Identifier for Shared Facility Agreement. + xml:lang="en">Lessee Security Agreement, Expiration Date + xml:lang="en">Operational Issues, Date Preventative Maintenance Started + xml:lang="en">Operator Performance Guarantee, Sponsor Performance Guarantee, Percent + xml:lang="en">Finance Overview [Abstract] + xml:lang="en">Monitoring Contract, Expiration Date + xml:lang="en">Information about expected energy related to the system. + xml:lang="en">Financial summary information about a system related to revenues and expenses. - - - + xml:lang="en">Availability Of Funding Memo, Flag + xml:lang="en">Closing Documents [Table] - - + xml:lang="en">Natural Resource Permit Action, Description + xml:lang="en">Sponsor Group Details [Line Items] + xml:lang="en">Energy production estimate of load study for non-export systems and loss estimation in kWh. + xml:lang="en">Description of pricing parameters for the Limited Liability Company Agreement. + xml:lang="en">Date of initial funding. + xml:lang="en">Case Identifier Of Operations And Maintenance Provider + xml:lang="en">Cash Distribution [Line Items] + xml:lang="en">Credit Support, Issuing Entity, Name + xml:lang="en">Name of the author of the Environmental Site Assessment II report. + xml:lang="en">Physical type of optimizer which can be stand-alone, attached to a module, embedded in the module or other. + xml:lang="en">Developer Project Performance Guarantee, Term + xml:lang="en">Indicates if there are exceptions to the Continuity Of Operations Agreement. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + xml:lang="en">Appraisal, Effective Date + xml:lang="en">Indicates if the Equipment Warranties is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Financial Contract For System Pace Eligibility, Flag + xml:lang="en">Appraisal [Table] + xml:lang="en">Inverter, California Energy Commission Weighted Efficiency, Percent + + + xml:lang="en">Indicates if there are exceptions to the Operator Guarantee or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">The amount of excise and sales taxes included in sales and revenues, which are then deducted as a cost of sales. Includes excise taxes, which are applied to specific types of transactions or items (such as gasoline or alcohol); and sales, use and value added taxes, which are applied to a broad class of revenue-producing transactions involving a wide range of goods and services. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Availability Of Letter Of Credit, Flag + xml:lang="en">Preparer Of Master Lease Agreement, Name + xml:lang="en">Indicates if there are exceptions to the Notice of Commercial Operation. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + xml:lang="en">Financial Contract For System Offtaker, Name + xml:lang="en">Site Review Of Endangered Species [Member] + xml:lang="en">American Land Title Association Survey, Link + xml:lang="en">Used to group information about financial transactions related to the system. + xml:lang="en">Link to the Wiring Instructions document. + xml:lang="en">Information about the Bill of Sale for the installation. + xml:lang="en">Availability Of Final Notice and Payment Instructions, Flag + xml:lang="en">Actual energy available excluding times of external or other outage causes per IEC 61724-3 Section 6.8.1. + xml:lang="en">Operations Manual [Abstract] + xml:lang="en">Length of the module. + xml:lang="en">Legal Entity Certificate Of Organization, Link + xml:lang="en">Counterparties To The Independent Engineering Opinion Report, Names + xml:lang="en">Inverter Output Nameplate [Abstract] + xml:lang="en">Effective date of the Notice of Commercial Operations Date. + xml:lang="en">Equipment review of other material equipment if any. + xml:lang="en">Review of supplemental reports and reference in Independent Engineer reports) for local tax review. + xml:lang="en">Indicates if the Independent Engineering Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Production Based Incentive Rate + xml:lang="en">Local Incentive Contract, Number Of Units + + xml:lang="en">Developer Current Funds, Description + xml:lang="en">Identifier for the approval needed for a financing event. + xml:lang="en">Counterparties To The Notice Of Approval, Names + xml:lang="en">LCC Registration Exceptions, Description + xml:lang="en">Used to define the month of the year. + xml:lang="en">Availability Of Final Funding Memo, Flag + xml:lang="en">Percentage of energy lost due to curtailment caused by reasons other than economics (wholesale market pricing or the like), stability, congestion, emergencies, or construction. Value reported should be based on major design/energy production model. To report estimated values for specified future periods, use the EstimationPeriodStartDateAxis, in conjunction with the concept EstimationPeriodForCurtailment. + xml:lang="en">Information about surety. + xml:lang="en">Nameplate information related to the system. + xml:lang="en">Cross Default Pool, Party Able To Default, Description + xml:lang="en">Test Condition Cell Temperature + xml:lang="en">Represents the time period of 1 year. This can be any year. Used to indicate that an amount is a annual amount. i.e. the rent is $1000 a year. + xml:lang="en">Monitoring Contract, Counterparty + xml:lang="en">Description of the product certificate type. + + + xml:lang="en">Telephone number for the backup Operations and Maintenance subcontractor. + xml:lang="en">Date on which FERC 203 application was approved. + + + xml:lang="en">Names of counterparties to the Site Lease Memo. + xml:lang="en">Document Identifier, Permission To Operate Interconnection Approval + xml:lang="en">Used to identify power levels for an inverter, for example 10% power level, 20% power level, 30% power level, weighted average.. + xml:lang="en">String equipment. + xml:lang="en">Credit rating of provider of letter of credit, either Moody's or Standard and Poors. + xml:lang="en">Active (real) Energy Performance Index measurement during times when the system is functioning (offline times removed) as in IEC 61724-3 Section 6.8, calculated as measured energy divided by expected energy. + xml:lang="en">Counterparties To The Substantial Completion Certificate, Names + xml:lang="en">Operational budget review of Monitoring Service Provider. + xml:lang="en">Parent Guarantee, Expiration Date + + xml:lang="en">Description of the location of spare parts inventory for the system. + xml:lang="en">Identifier for Renewable Energy Credit Performance Agreement. + xml:lang="en">Security Agreement Supplement, Effective Date + xml:lang="en">Qualifying Facilities Self Certification, Effective Date + xml:lang="en">Fund [Abstract] - - + xml:lang="en">Identifier for Pricing Model Report. + xml:lang="en">Represents the time period of the month of July. Used for this month of any year. + xml:lang="en">Irradiance of the reference cell (light sensor) used in the model. + xml:lang="en">Lease Initial Monthly Payment, Amount + xml:lang="en">Insurance Consultant, Name - + xml:lang="en">Minimum coverage amount of insurance. + xml:lang="en">Site Climate Zone Type ANSI, Description + xml:lang="en">Asset Manager Performance Guarantees, Description + xml:lang="en">Indicates if the entity or counterparty is an Asset Manager; if it is, TRUE; if it is not, FALSE. + xml:lang="en">Developer Executive Bios, Description + xml:lang="en">System Availability Achievement Requirement, Percent + xml:lang="en">Fund Identifier [Axis] + xml:lang="en">System Type, Description + xml:lang="en">Operations and Maintenance Company, Name + xml:lang="en">Power Purchase Agreement, Rate Type, Description + xml:lang="en">Investment Memo, Effective Date + xml:lang="en">Inverter MPPT Operating Range Maximum, Amount + xml:lang="en">Inverter Has Certification IEC62109-2, Flag + xml:lang="en">Vegetation Management [Line Items] + xml:lang="en">Date of the partnership flip when the annual energy output is a P90 yield. + xml:lang="en">Effective date of the Site Lease Memo. + xml:lang="en">Information about the renewable energy credit performance guarantee. + xml:lang="en">Name of the natural resource item identified. + + + xml:lang="en">Information about the Tax Indemnity Agreement. + xml:lang="en">State Tax Credit Program, Description + xml:lang="en">Corporate title of the employee. + xml:lang="en">Financial Lease Schedule [Abstract] + xml:lang="en">Identifier for Transmission Report and Curtailment Estimate. + xml:lang="en">Master Lease, Liability Insurance Provider Required AM Best Quality Rating + + + xml:lang="en">Information about financial and production performance data. + xml:lang="en">Preparer Of Developer Portfolio Performance Guarantee Agreement, Name + xml:lang="en">The vendor code for the entity or counterparty in the bank's internal systems. + xml:lang="en">Amount of energy (kWh) guaranteed to be generated by the installation in the Power Purchase Agreement. + xml:lang="en">Represents information related to other permits such as electrical or building permits that may be relevant to the site. + xml:lang="en">AM Best Size Rating required by the liability insurance provider in the Master Lease. + + + xml:lang="en">Series Resistance Model Factor, Typical Met Month, Percent + xml:lang="en">Effective date of the Permission To Operate Interconnection Approval. + xml:lang="en">Preparer Of Lessee Security Agreement, Name + xml:lang="en">Inverter Input Supported Battery Types, Description + xml:lang="en">Indicates if the Co Tenancy Agreement is available. If it is available, TRUE; if it is not available, FALSE. + + xml:lang="en">Identifier for Commitment Agreement. + xml:lang="en">Used to group a listing of information about the appraised value. + + + xml:lang="en">Wiring Instructions, Expiration Date + xml:lang="en">System Operational Status + xml:lang="en">Earnings before income tax, depreciation or amortization, actual and forecast. (EBITDA). Values reported as forecast should use the StatementScenarioAxis. + xml:lang="en">Insurance, Effective Date + xml:lang="en">Description of any exceptions to the Monitoring Contract. + xml:lang="en">Description of Power Purchase Agreement counterparty reporting requirements. + xml:lang="en">Indicates if there are exceptions to the Certificate of Final Completion. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Description of the history and structure of the Engineering Procurement and Construction Agreement. + xml:lang="en">Description of state tax credit. + xml:lang="en">Date when the product model was listed in the California Commission (CEC) repository. + xml:lang="en">Financial model (pro forma) review of curtailment study, which may be performed by a third party. + xml:lang="en">Entity Authorized To View Security Data, Name + + xml:lang="en">Indicates if there are exceptions to the Qualifying Facilities Self Certification or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + + + xml:lang="en">Initiation date of the backup asset management contract. + xml:lang="en">Information about energy measures, actual and expected. + xml:lang="en">Used to define the month of the year. + xml:lang="en">Description of actions taken in response to the approval condition. + xml:lang="en">Website URL of the entity. + + xml:lang="en">Fund Storage Projects, Flag + xml:lang="en">Letter of Credit, Security Provider Required S&P Rating + xml:lang="en">Rate for the Asset Management Contract. + xml:lang="en">Credit Support Amount, Start Date + xml:lang="en">Availability Of Exceptions To The Pledge Agreement, Flag + xml:lang="en">Indicates if the installation agreement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Indication if the three weighted efficiencies on the Summary sheet average to the CEC Efficiency value for the efficiency graph. If they do, TRUE; if they do not, FALSE. + xml:lang="en">Product Details [Table] + xml:lang="en">Percent escalator in the Monitoring Contract between the project company and engineering company to monitor system performance. + xml:lang="en">Information about the Master Lessee Security Agreement for the project. + xml:lang="en">Description of the warranted output. + xml:lang="en">Information about the lien waiver. + xml:lang="en">Indicates if the UCC Precautionary Lease Filing is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Availability Of Exceptions To The Operator Guarantee, Flag + + + xml:lang="en">Supplemental Report Review Of Local Tax Review, Link + xml:lang="en">Counterparties To The Site License Agreement, Names + xml:lang="en">Availability Of Estoppel Certificate Power Purchase Agreement,, Flag + xml:lang="en">Percentage of kWh lost due to shading, for a typical meteorological year, calculation based on major design/energy production model used. + xml:lang="en">Description of the payment method for the Operations and Maintenance contract. + xml:lang="en">Inverter Has Ground Fault Monitoring, Flag + xml:lang="en">Represents information about the amount of credit associated with credit supporting a specific contract, including the amount, start and end dates. + xml:lang="en">Description of scope of work in the Operations and Maintenance contract. + xml:lang="en">Amount of investment tax benefits allocated to partners, including depreciation and Investment Tax Credit. + xml:lang="en">Percentage of kWh lost due to annualized Parasitic Energy loss (inverters, trackers, etc.) for a typical meteorological month, calculation based on major design/energy production model used. + xml:lang="en">Backup Asset Management [Abstract] + xml:lang="en">Equipment Type, Average Cost Per Unit + xml:lang="en">Counterparties To The UCC Precautionary Lease Filing, Names + xml:lang="en">Orientation of the module which can be portrait or landscape. + + + xml:lang="en">Engineering Procurement Construction Cost, amount per unit of DC energy. + xml:lang="en">Identifier for Site License Agreement. + xml:lang="en">Shared Facility Agreement, Expiration Date + xml:lang="en">Description of any exceptions to the Membership Certificate of Master Lessee or issues raised. + xml:lang="en">Date on which final approval was obtained. + xml:lang="en">Maximum amount of money that can be refunded to the guarantee. + xml:lang="en">Description of the type of approval, for example Solar Project Finance, Line of Business, Credit, Special Purpose Entity. + xml:lang="en">Availability Of Final Other Equipment Due Diligence Reports, Flag + xml:lang="en">Name of the company responsible for preparing the Certificate Of Acceptance Report. + xml:lang="en">Employee Role, Level + xml:lang="en">Revenue from energy production based incentive. Value should be reported as amount per watt. The StatementScenarioAxis should be used to report values that are predicted. No axis should be used to report values that are actual. + xml:lang="en">Credit Support for Engineering Procurement and Construction Agreement, Flag + xml:lang="en">Master Services Agreement, Term + xml:lang="en">Document Identifier, Environmental Impact Report + xml:lang="en">Regulatory Certification, Number + xml:lang="en">Name of the fund company or master lessee in the Master Lease. + xml:lang="en">Document Identifier, Term Loan Agreement - + xml:lang="en">Availability Of Exceptions To The Installation Agreement, Flag + xml:lang="en">Represents information about the Cross Default Pool which is when the revenue from one project can be used to pay the expenses and lease payment for another project that would otherwise go into default. + xml:lang="en">Regulatory FERC203 Application, Link + xml:lang="en">Expected system production at P90 which is the expected energy production reached with a probability of 90%. This element is used with the PeriodAxis to indicate the period of production. Usually this will be a year. + xml:lang="en">Description of required site access notice. + xml:lang="en">Identifies how loss factor is expressed, for example as 1 - Loss or as Loss. + + + xml:lang="en">Indicates if there are exceptions to the Lessee Claim Documents or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Names of counterparties to the Assignment of Interest. + xml:lang="en">Amount of curtailment in kWh which is a reduction in the energy output of a generator from what it could otherwise produce given available resources (e.g., wind or sunlight). + xml:lang="en">Percentage of kWh lost due to atmospheric aerosol particles, including water vapor or fog, smoke from wildfires or agricultural burning, and air pollution due to urban proximity of system, for a typical meteorological month, calculation based on major design/energy production model used. + xml:lang="en">Used to identify different array types based on the orientation of the array. A sub array is a PV surface unit generally made up of the same types of module mounted together and set at the same angle and orientation. - + xml:lang="en">Availability Of Final Letter Of Credit, Flag + xml:lang="en">Pricing Model, Nominal Pre Tax Equivalent Terminal Internal Rate Of Return, Percent + + + xml:lang="en">Power Purchase Agreement, Provider + xml:lang="en">Document Identifier, Module Factory Audit Report + xml:lang="en">Operational Issues, Resolution Time + xml:lang="en">Counterparties To The Monitoring Contract, Names + xml:lang="en">Used to group information about the site license agreement related to the site. + xml:lang="en">Indicates if the Operator Guarantee is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Identifier for Certificates Of Insurance. + xml:lang="en">Name of the company responsible for preparing the Host Acknowledgement. + xml:lang="en">Component that needs to be replaced. + xml:lang="en">Cost per gallon of water. + + + xml:lang="en">Names of counterparties to the Punch List. + xml:lang="en">Site Property Photos Location, URI + + xml:lang="en">Number of years for simple payback of the project. + xml:lang="en">State Tax Credits Escalator, Percent + xml:lang="en">Punch List, Outstanding Items, Cost + xml:lang="en">Operational Budget Review Of Consumables List [Member] + + + xml:lang="en">Letter of Credit, Security, Initiation Date + xml:lang="en">Description of the status of the financing event, for example, In Process or Finalized. - + xml:lang="en">Name of the counterparty to the Partnership Flip. + xml:lang="en">Actual (measured) amount of energy lost due to soiling. + xml:lang="en">UCC Security Agreement, Link + xml:lang="en">Effective date of the Renewable Energy Credit Offtake Agreement. + xml:lang="en">Ratio of Array Capacity as Measured to Array Capacity as Rated, DC, Percent + xml:lang="en">Date when the maintenance ticket was opened. + xml:lang="en">Document Identifier, Continuity Of Operations Document + xml:lang="en">Optimizer Serviceability, Description + xml:lang="en">System Equipment [Line Items] + xml:lang="en">Indicates if the Monthly Operating Report is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">W2 Verification of Employment, Flag + xml:lang="en">Represents the time period of the second quarter. Used for this quarter of any year. + xml:lang="en">Numeric credit score for borrower (or co-borrower) resulting from credit evaluation model specified. + xml:lang="en">Insulated Gate Bipolar Transistors Of the Inverter (IGBT), Temperature + + xml:lang="en">Operations Manager [Abstract] + xml:lang="en">Link to the Master Lessee Security Agreement document. + xml:lang="en">Availability Of Exceptions To The Environmental Site Assessment I, Flag + xml:lang="en">Indicates if there are exceptions to the Tax Opinion or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Notice Of Approval, Effective Date + xml:lang="en">Availability Of Final Renewable Energy Credit Offtake Agreement, Flag + xml:lang="en">Sponsor Group [Table] + xml:lang="en">Availability Of Final Incentive Assignment, Flag + xml:lang="en">Link to the Co Tenancy Agreement document. + xml:lang="en">Annual amount of the surety premium. + xml:lang="en">Warranty review of SCADA System/Meters. + xml:lang="en">Tracker Capacity in kWdc. + + xml:lang="en">State Rebate, Amount + xml:lang="en">Description of rebate payment timing, for example monthly or quarterly payment. + xml:lang="en">Name of the company responsible for preparing the Advisor Invoices. + xml:lang="en">SubArray Geospatial Layout [Abstract] + xml:lang="en">Identifier for the natural resource. + xml:lang="en">Expiration date of the Membership Certificate of Master Lessee. + xml:lang="en">Description of any exceptions to the UCC Security Agreement or issues raised. + xml:lang="en">Insurance Type + + xml:lang="en">Document Identifier, LLCA Agreement + xml:lang="en">Future Surplus Cash to Developer + xml:lang="en">Incentive Assignment Exceptions, Description + xml:lang="en">Partnership Flip Execution, Date + xml:lang="en">Energy Contract Hourly Rate, Hour 11 [Member] + xml:lang="en">Equipment Warranties, Effective Date + xml:lang="en">Membership Certificate Of Master Lessee, Link + xml:lang="en">Preparer Of Approval Notice, Name + xml:lang="en">Effective date of the UCC Precautionary Lease Filing, a legal form filed to indicate that they have or will have an interest in the property of the debtor. + xml:lang="en">Names of counterparties to the Property Tax Exemption Opinion. + xml:lang="en">Financial Contract For System, Length In Months + xml:lang="en">Document Identifier, Lien Waiver + xml:lang="en">Identifier for Equity Capital Contribution Agreement. + xml:lang="en">Interest, which is the amount of interest that has accrued on the prepaid rent. + + + xml:lang="en">Information about inverter certifications. + xml:lang="en">Status of the inverter fan. If fan is working, TRUE; if fan is not working, FALSE. + xml:lang="en">Product Certifying Body, Name + xml:lang="en">Name of the company responsible for preparing the Operations and Maintenance Agreement. + xml:lang="en">Financing Event Identifier [Axis] + xml:lang="en">Number of the period for the credit support amount, for example, period 1. - + xml:lang="en">Roof Top [Abstract] + xml:lang="en">Installation Type [Line Items] + xml:lang="en">Standard & Poors credit rating of the entity. + xml:lang="en">Information about project financing related to a fund, project or portfolio, which may take place during onboarding or any other stage in the lifecycle of the installation. + xml:lang="en">Information about availability of the system. + xml:lang="en">Multiplier indicating the amount that the module can operate at above the nameplate capacity. For example at factor of 1.1, can safely operate 10% above the stated nameplate capacity rating. + xml:lang="en">Percent escalator of the Power Purchase Agreement. + xml:lang="en">Names of counterparties to the Certificate of Formation for Master Lessee, Lessee and Operator. + xml:lang="en">Warranties Review Data Acquisition Systems Meters [Member] + xml:lang="en">Completion confirmation of investor's parallel monitoring feed functionality via email from investor’s parallel monitoring service or other means. + xml:lang="en">Information about the Notice of Commercial Operation which is a letter from the operator confirming that the installation is operating. + xml:lang="en">Availability Of Exceptions To The Incumbency Certificate, Flag + xml:lang="en">Pricing Model, Accrual Account Deposit, Amount + xml:lang="en">System Performance Expected Energy [Abstract] + xml:lang="en">State Tax Credit Recipient, Name + xml:lang="en">Equipment Review Data Acquisition Systems Meters [Member] + xml:lang="en">Cost of the SCADA (Supervisory Control & Data Acquisition) license. + xml:lang="en">Warranty review of Meteorological Station. + xml:lang="en">Financing Event [Line Items] + xml:lang="en">Equipment Type Manufacturer, Name + xml:lang="en">Post Close [Abstract] + xml:lang="en">Amount of the tax equity cash distributions. + xml:lang="en">Utility Contact, Title + xml:lang="en">Washing And Waste [Abstract] + xml:lang="en">Actual Power Purchase Agreement Revenue Expected, Percent + xml:lang="en">Document Identifier, Construction Issues Report + xml:lang="en">Gross energy output in the period, in megawatt hours, pre availability and curtailment. + xml:lang="en">Inverter Certifications [Abstract] + xml:lang="en">Model Clipping Loss, Amount + xml:lang="en">Energy Contract Hourly Rate, Hour 19 [Member] + xml:lang="en">Entity Is EPC Contractor, Flag + xml:lang="en">Identifier for the financing event, for example, an origination request, signing a non-binding commitment, signing a binding commitment, signing and closing, closing, or funding. - + xml:lang="en">Number of columns of cells on a module. + xml:lang="en">Cost Segregation [Axis] + + - - + xml:lang="en">Indicates if the Certificate of Formation for Master Lessee, Lessee and Operator is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Amount of expected asset management expenses. + xml:lang="en">Link to the Renewable Energy Credit Offtake Agreement document. + xml:lang="en">Inverter Power At 75 Percent Power Level [Member] + xml:lang="en">Term Loan [Abstract] + xml:lang="en">Confirmation of the availability of the Site Lease Agreement per the Power Purchase Agreement Agreement. If available, TRUE; if not available, FALSE. + xml:lang="en">Fund Bank Investment, Description - + xml:lang="en">Indicates if the Security Agreement Supplement is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of the location of the met station. + xml:lang="en">Link to the Pro Forma document. + xml:lang="en">Description of the contract type of the Engineering Procurement and Construction Agreement. + xml:lang="en">Indicates if the site permit review has been considered. If it has been considered, TRUE; if it has not been considered, FALSE. + xml:lang="en">Counterparties To The Tax Opinion, Names + xml:lang="en">Link to the Certificate Of Formation document. + xml:lang="en">Description of any exceptions to the Other Equipment Due Diligence Reports. + xml:lang="en">Availability Of Shared Facility Agreement, Flag + xml:lang="en">Equipment Type Warranty, End Date + xml:lang="en">Project Company (Special Purpose Vehicle), Federal Tax Identifier + xml:lang="en">System Design And Model [Abstract] + xml:lang="en">Indicates if the Closing Certificate is available in final form. If it is available in fnal form, TRUE; if it is only available in draft form, FALSE. + xml:lang="en">Description of any exceptions to the UCC Precautionary Lease Filing or issues raised. - + xml:lang="en">Period Third Quarter [Member] + xml:lang="en">Indicates if there are exceptions to the Independent Engineering Report or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Product Notes, Description - - - + xml:lang="en">Preventative Maintenance Remaining, Percent + xml:lang="en">Module Power Tolerance Range Minimum, Percent + + xml:lang="en">Environmental Site Assessment I [Abstract] + xml:lang="en">Information about the Easement Report. + xml:lang="en">Expiration date of the Commitment Agreement. + xml:lang="en">Environmental Site Assessment II Exceptions, Description + xml:lang="en">Transportation expense for the security company. + xml:lang="en">Credit Support for Lease Schedule, Flag + xml:lang="en">The final PV system yield Yf is the net energy output of the entire PV system (AC) per rated kW (DC) of installed PV array: Yf = Eout / P0.Calculated for a one year period. + xml:lang="en">Expiration date of the property insurance certificate. + xml:lang="en">Effective date of the Master Lease. + xml:lang="en">Ratio of projects owned by Operations and Maintenance Manager versus projected owned by third parties. + xml:lang="en">Name of the company responsible for preparing the Hedge Agreement. + xml:lang="en">Supplemental Report Review Of Insurance Review, Effective Date + xml:lang="en">Availability Of Certificate Of Formation For Master Lessee, Lessee And Operator, Flag + xml:lang="en">Description of any exceptions to the Equity Contribution Guarantee or issues raised. + xml:lang="en">Developer Project Development Strategy, Description + xml:lang="en">Availability Of Exceptions To The Equity Contribution Agreement, Flag + xml:lang="en">Certificate Of Formation For Master Lessee, Lessee And Operator Exceptions, Description + xml:lang="en">Indicates if there are exceptions to the Title Survey or issues raised. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Initiation date of the Letter of Credit. + xml:lang="en">Identifier for the Counterparty which is a grantee. + xml:lang="en">Project Performance [Line Items] + xml:lang="en">Lease Base Stipulated Loss Value, Amount + xml:lang="en">Description of the aspects of EPC (Engineering Procurement and Construction) performed by the developer as a prime contractor. + xml:lang="en">Indication that reserve has been used. If it has been used, TRUE; if it has not been used, FALSE. + xml:lang="en">Abstract used to classify general nameplate information about the inverter. + xml:lang="en">Developer [Table] + xml:lang="en">Information about the Reportable Environmental Condition. + xml:lang="en">Incumbency Certificate, Effective Date + xml:lang="en">Project Company Lessee + xml:lang="en">Table represents early buy out options in project financing. Project financing may have more than one early buy out option with associated date and amount. + + xml:lang="en">Transformer temperature. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Effective date of the Financial Lease Schedule. + xml:lang="en">Indicates if the Construction Contractor Notice of Certification is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Expiration date of the Equity Contribution Guarantee. + xml:lang="en">Cost for local security company to respond to an event. + xml:lang="en">Minimum irradiance required to activate a PV system or subarray. + xml:lang="en">Inverter MPPT Operating Range Minimum, Amount + xml:lang="en">Expiration date of the state tax credit. + xml:lang="en">Name of project company or developer (organization that produces energy) in the Power Purchase Agreement. + xml:lang="en">Parent Company [Table] + xml:lang="en">Design Review Of Civil Report [Member] + xml:lang="en">Number of cells in a solar module series. + xml:lang="en">Document Identifier, Equity Contribution Guarantee + xml:lang="en">Availability Of Exceptions To The Substantial Completion Certificate, Flag + xml:lang="en">Asset Manager Details [Line Items] + xml:lang="en">Date when owner accepts system as final per EPC Agreement. + xml:lang="en">Zoning Permit Property, Description - + xml:lang="en">Address for the backup Operations and Maintenance subcontractor. + xml:lang="en">Total appraised value for the system at fair market value. + xml:lang="en">Depth of the Module + xml:lang="en">Approval Condition, Status + xml:lang="en">Actual renewable energy credit revenue divided by expected renewable energy credit revenue. + xml:lang="en">Engineering, Procurement and Construction Performance Guarantee, Expiration Date + xml:lang="en">Information about the Operating Agreements for Master Lessee, Lessee and Operator for the project. + xml:lang="en">Approvals [Line Items] + xml:lang="en">Component Maintenance Cost (Under Warranty) Met Station, Amount + xml:lang="en">Surety bond number which is assigned by the surety company and is the surety company's unique identifier. + xml:lang="en">Maintenance cost of other with no warranty. + xml:lang="en">Total DC Capacity of the system based on the design of the system at Standard Test Conditions. + xml:lang="en">Availability Of Monitoring Contract, Flag + xml:lang="en">Cultural Resource Identified Location, Description + xml:lang="en">Identifier for Guarantee Agreement. + xml:lang="en">Information about the Certificate of Acceptance Report which is issued when the project is complete, to provide confirmation that whoever receives the project has accepted it from the contractor. + xml:lang="en">True up equals the difference between the amount of kWh originally estimated and the actual output. + xml:lang="en">Name of the company responsible for preparing the Liability Insurance Certificate Agreement. + xml:lang="en">Document Identifier, Tax Opinion + xml:lang="en">Information about the Building Inspection for the project. + xml:lang="en">Pricing Model, Nominal After Tax Internal Rate Of Return, Percent + xml:lang="en">Name of the company responsible for preparing the Commercial General Liability Insurance Policy. + + + xml:lang="en">Engineering, Procurement and Construction Cost Per Unit of Energy, Percent + xml:lang="en">Indication if a Construction Data Report (CDR) was submitted. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Ratio between expected (assumed) one year in-plane measured irradiation and actual one year in-plane measured irradiation. + xml:lang="en">Counterparties To The Co Tenancy Agreement, Names + xml:lang="en">Name assigned to the project. + xml:lang="en">Availability Of Final Commitment Agreement, Flag + + xml:lang="en">Security [Abstract] + xml:lang="en">Site Lease Access Agreement, Initiation Date + xml:lang="en">Name of the beneficiary of the Parent Guaranty, which is provided by the parent of the developer to the project company in the event project revenue goals are not met. + + + xml:lang="en">Discount rate used by lessor to determine present value of finance lease payments. + + + xml:lang="en">Substantial Completion Certificate, Link + xml:lang="en">Amount of the the cap on operations and maintenance liabilities. + xml:lang="en">Indication if the multiple listee letter for the inverter was signed by an NRTL. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Names of counterparties to the Financial Lease Schedule. + xml:lang="en">Operations And Maintenance Contract, Rate Type, Description + xml:lang="en">Energy measured at the revenue meter for the indicated time period according to IEC 61724-3 Section 6.7. + xml:lang="en">Property Insurance Certificate Exceptions, Description + xml:lang="en">All Project Account Balances, Amount + + + xml:lang="en">Expiration date of the Tax Opinion. + xml:lang="en">Title Policy Exception Details [Line Items] + xml:lang="en">Contractors review of part of the Independent Engineer Report covering Asset Management including infrastructure (ticketing, billing system, etc.). + xml:lang="en">Start date of initial insurance coverage. + + + xml:lang="en">Operating Agreements For Master Lessee, Lessee And Operator, Expiration Date + xml:lang="en">Periodic Budget, State Date + + + + xml:lang="en">Indemnification section of the Limited Liability Company Agreement. + xml:lang="en">Security Interest in Limited Liability Company Agreement, Flag + xml:lang="en">Information about the Advisor Invoices for the project. + xml:lang="en">Link to the Operations And Maintenance Manual document. + xml:lang="en">Wiring Instructions, ABA Number + xml:lang="en">SCADA System Communication Protocol + xml:lang="en">Link to the Substantial Completion Certificate document. - + xml:lang="en">URI of the geospatial boundary information file. + xml:lang="en">Maximum, nameplate (nominal) output of the inverter, measured in real power (watts) which is the amount of power actually consumed or utilized in an AC Circuit. It is also called True power or Active Power. + xml:lang="en">Used to group financial summary information about the system. + xml:lang="en">Limited Liability Company Agreement, Indemnities, Description + xml:lang="en">Placed In Service (PIS), Date + xml:lang="en">Post Closing Items, Description + xml:lang="en">Punch List Counterparties, Names + xml:lang="en">Zoning Permit Authority, Description + xml:lang="en">Funding Memo, Expiration Date + xml:lang="en">Number of megawatts under management by Operations and Maintenance manager. + xml:lang="en">Security Interest Identifier [Axis] + xml:lang="en">System Details [Abstract] + xml:lang="en">Model Factors Soiling, Flag + xml:lang="en">Principal Amount Outstanding On Loans And Managed And Securitized Per Watt + xml:lang="en">Information about the Investment Memo. + xml:lang="en">Site Lease Agreement [Abstract] + xml:lang="en">Indication if the night tare loss data was provided in the Weighted Inverter Efficiency Form. If it was, TRUE; if it was not, FALSE. + xml:lang="en">Effective date of the interconnection agreement, allowing the project company to distribute energy onto the electrical grid. + xml:lang="en">Percentage of kWh lost due to Ohmic losses (both AC and DC), for a typical meteorological month, calculation based on major design/energy production model used. + + xml:lang="en">Number of components affected by the maintenance requirements. + xml:lang="en">Actual amount of active energy consumed by the system, also called Parasitic Load. + xml:lang="en">Document Identifier, Lessee Claim Documents + xml:lang="en">Completion of Operations and Maintenance Manual Review. + xml:lang="en">Availability Of Exceptions To The Lessee Claim Documents, Flag - - + xml:lang="en">Exposure Report [Abstract] + xml:lang="en">Document Identifier, Installation Agreement + xml:lang="en">Indicates if the beneficiary is an SPV or a counterparty. + xml:lang="en">PV Installation Cost of Engineering Procurement And Construction, Amount + xml:lang="en">Information specific to Logger products that are used in the system. + xml:lang="en">Expected Gross Investment Balance, Amount + xml:lang="en">Site Address State + xml:lang="en">Tax Indemnity Agreement [Abstract] + xml:lang="en">Description of state incentives and credit filings. + xml:lang="en">Description of any exceptions to the Pledge Agreement or issues raised. + xml:lang="en">Description of mandatory requirements for access to the site, such as background checks. + xml:lang="en">Master Purchase Agreement, Link + xml:lang="en">Document Identifier, Operations and Maintenance Document + xml:lang="en">Number of days of operation on the project. + xml:lang="en">Entity Email + xml:lang="en">Link to the Site License Agreement document. + xml:lang="en">Product Model Cut Sheet New, Flag + xml:lang="en">Information about the underwriting structure of the fund. + xml:lang="en">Tax Opinion, Expiration Date + xml:lang="en">Operational Issues, Environmental Health And Safety Related, Flag + xml:lang="en">Preparer Of Interconnection Approval, Name + xml:lang="en">Equipment Type Warranty, Description + xml:lang="en">Description of rebate program for Property Insurance. + xml:lang="en">Name of the holder of the product certification. + xml:lang="en">Technical contract review including gap analysis of guarantees, tests, and operating requirements of Spare Parts List. - + xml:lang="en">Name of the company responsible for preparing the Incumbency Certificate. + xml:lang="en">Host Acknowledgement [Abstract] + xml:lang="en">Information about the title policy. - + xml:lang="en">Module Cell Count, Number + xml:lang="en">Counterparties To The Appraisal, Names + xml:lang="en">Name of the company responsible for preparing the Monthly Operating Report. + xml:lang="en">Preparer Of LLCA Agreement, Name + xml:lang="en">Author of the Independent Engineering Production Estimate, Name + xml:lang="en">Identifier for Independent Engineering Opinion Report. + xml:lang="en">Transformer equipment. + xml:lang="en">Continuity of Operations Agreement, Backup Asset Management, Initiation Date + xml:lang="en">Title Survey Exceptions, Description + xml:lang="en">Indication that fund is cross collateralized. If cross collateralized, TRUE; if not cross collateralized, FALSE. + xml:lang="en">Document Identifier, Other Equipment Due Diligence Reports + xml:lang="en">Link to the Supplemental Report Review Of Local Tax Review document. - + xml:lang="en">List of member entities in the partnership per the Limited Liability Company Agreement. + xml:lang="en">Preparer Of Property Insurance Policy, Name + xml:lang="en">Security Interest Details [Line Items] + xml:lang="en">Renewable Energy Credit Performance Guarantee, RECs Guaranteed, Number + xml:lang="en">Indicates if there are exceptions to the Asset Management Contract. If there are exceptions, TRUE; if there are no exceptions, FALSE. + xml:lang="en">Counterparties To The Site Lease Memo, Names + xml:lang="en">Lessor, Finance Lease, Discount Rate - + xml:lang="en">Secondary Operations and Maintenance Subcontractor, Phone + xml:lang="en">Regulatory FERC203, Status + xml:lang="en">Email address for Data Acquisition System. + xml:lang="en">Bank Account Details [Line Items] + xml:lang="en">Component Maintenance Cost (No Warranty) Racking Tracker, Amount + xml:lang="en">Energy Contract Hourly Rate, Hour 15 [Member] + xml:lang="en">Name of customer (developer) per the Engineering Procurement and Construction agreement. + xml:lang="en">Fund, Name + xml:lang="en">Date of the partnership flip when the annual energy output is a P99 yield. + xml:lang="en">Pricing Model, Effective After Tax Terminal Internal Rate Of Return, Percent + xml:lang="en">Information about the role of the entity, indicated as boolean flag. + xml:lang="en">Description of certifications available for the inverter. + xml:lang="en">Expiration date of the Wiring Instructions. + xml:lang="en">Description of developer experience with technology contemplated for funding, customers, amount of megawatts developed in US and abroad, time in business in US and abroad. + xml:lang="en">Link to the Investment Memo document. + xml:lang="en">Minimum operating temperature of the solar module. Can be reported as Celsius or Fahrenheit by the preparer when specifying units in the instance document. + xml:lang="en">Project Early Buyout, Date + xml:lang="en">Certificate Of Formation For Master Lessee, Lessee And Operator [Abstract] + xml:lang="en">Information about incentives. + xml:lang="en">California Rule 21 Source Requirement Document Used, Flag + + xml:lang="en">Indicates if the Environmental Site Assessment I is available. If it is available, TRUE; if it is not available, FALSE. + xml:lang="en">Electrical Power Test, Start Date Time Stamp + xml:lang="en">Guaranteed volume of energy to be delivered as part of the state tax credit agreement (in kWh). + xml:lang="en">Surety Bond Form And Version Number, Description + xml:lang="en">European Efficiency rating of the inverter which is an averaged operating efficiency over a yearly power distribution corresponding to middle-Europe climate. diff --git a/core/solar_all_2019-07-31_def.xml b/core/solar_all_2019-07-31_def.xml index 22478d0..c4e3169 100644 --- a/core/solar_all_2019-07-31_def.xml +++ b/core/solar_all_2019-07-31_def.xml @@ -23,228 +23,228 @@ Initial Solar taxonomy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - + - - - - + + + xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + + + + + - - - - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd http://xbrl.org/2008/generic http://www.xbrl.org/2008/generic-link.xsd"> - - - + + + diff --git a/data/solar-AssetManager_2019-07-31_def.xml b/data/solar-AssetManager_2019-07-31_def.xml index 2141bfa..b6fe7c0 100644 --- a/data/solar-AssetManager_2019-07-31_def.xml +++ b/data/solar-AssetManager_2019-07-31_def.xml @@ -22,30 +22,30 @@ Orange Button Taxonomy - AssetManager--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + - - + diff --git a/data/solar-Developer_2019-07-31_def.xml b/data/solar-Developer_2019-07-31_def.xml index f607661..6cecd7a 100644 --- a/data/solar-Developer_2019-07-31_def.xml +++ b/data/solar-Developer_2019-07-31_def.xml @@ -22,9 +22,13 @@ Orange Button Taxonomy - Developer--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - arcroleURI="http://xbrl.org/int/dim/arcrole/all" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#all" xlink:type="simple"/> + diff --git a/data/solar-FinancialPerformance_2019-07-31_def.xml b/data/solar-FinancialPerformance_2019-07-31_def.xml index 9e91666..20c3f29 100644 --- a/data/solar-FinancialPerformance_2019-07-31_def.xml +++ b/data/solar-FinancialPerformance_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - FinancialPerformance--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> + - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - roleURI="http://xbrl.us/Solar/2019-07-31/roles/Fund" xlink:href="../data\solar-Fund_2019-07-31.xsd#roleType_Fund" xlink:type="simple"/> + diff --git a/data/solar-Insurance_2019-07-31_def.xml b/data/solar-Insurance_2019-07-31_def.xml index 966f38b..4f1c91f 100644 --- a/data/solar-Insurance_2019-07-31_def.xml +++ b/data/solar-Insurance_2019-07-31_def.xml @@ -22,13 +22,9 @@ Orange Button Taxonomy - Insurance--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - + + diff --git a/data/solar-OperationalPerformance_2019-07-31_def.xml b/data/solar-OperationalPerformance_2019-07-31_def.xml index dbf5d95..7bfc01c 100644 --- a/data/solar-OperationalPerformance_2019-07-31_def.xml +++ b/data/solar-OperationalPerformance_2019-07-31_def.xml @@ -23,25 +23,25 @@ Orange Button Taxonomy - OperationalPerformance--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + - arcroleURI="http://xbrl.org/int/dim/arcrole/all" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#all" xlink:type="simple"/> - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - roleURI="http://xbrl.us/Solar/2019-07-31/roles/OperationsManager" xlink:href="../data\solar-OperationsManager_2019-07-31.xsd#roleType_OperationsManager" xlink:type="simple"/> + diff --git a/data/solar-Portfolio_2019-07-31_def.xml b/data/solar-Portfolio_2019-07-31_def.xml index 7e4c2eb..f7f03bc 100644 --- a/data/solar-Portfolio_2019-07-31_def.xml +++ b/data/solar-Portfolio_2019-07-31_def.xml @@ -22,13 +22,9 @@ Orange Button Taxonomy - Portfolio--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - + diff --git a/data/solar-Project_2019-07-31_def.xml b/data/solar-Project_2019-07-31_def.xml index 60bbd72..7fe0858 100644 --- a/data/solar-Project_2019-07-31_def.xml +++ b/data/solar-Project_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - Project--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - + diff --git a/data/solar-Sponsor_2019-07-31_def.xml b/data/solar-Sponsor_2019-07-31_def.xml index 798ec54..f1a74cb 100644 --- a/data/solar-Sponsor_2019-07-31_def.xml +++ b/data/solar-Sponsor_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - Sponsor--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - arcroleURI="http://xbrl.org/int/dim/arcrole/all" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#all" xlink:type="simple"/> + diff --git a/data/solar-System_2019-07-31_def.xml b/data/solar-System_2019-07-31_def.xml index be22f34..06d6238 100644 --- a/data/solar-System_2019-07-31_def.xml +++ b/data/solar-System_2019-07-31_def.xml @@ -22,45 +22,45 @@ Orange Button Taxonomy - System--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - - - + + xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - roleURI="http://xbrl.us/Solar/2019-07-31/roles/SystemDeviceListing" xlink:href="../data\solar-System_2019-07-31.xsd#roleType_SystemDeviceListing" xlink:type="simple"/> + + +Orange Button Taxonomy - System--> xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd http://xbrl.org/2008/generic http://www.xbrl.org/2008/generic-link.xsd"> - - xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + - - + diff --git a/documents/solar-AdvisorInvoices_2019-07-31_def.xml b/documents/solar-AdvisorInvoices_2019-07-31_def.xml index 2c1a16e..e88494f 100644 --- a/documents/solar-AdvisorInvoices_2019-07-31_def.xml +++ b/documents/solar-AdvisorInvoices_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - AdvisorInvoices--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-Appraisal_2019-07-31_def.xml b/documents/solar-Appraisal_2019-07-31_def.xml index 7a66703..0cee81d 100644 --- a/documents/solar-Appraisal_2019-07-31_def.xml +++ b/documents/solar-Appraisal_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - Appraisal--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ApprovalNotice_2019-07-31_def.xml b/documents/solar-ApprovalNotice_2019-07-31_def.xml index f7e2eb9..8d33e9d 100644 --- a/documents/solar-ApprovalNotice_2019-07-31_def.xml +++ b/documents/solar-ApprovalNotice_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ApprovalNotice--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-AssetManagementContract_2019-07-31_def.xml b/documents/solar-AssetManagementContract_2019-07-31_def.xml index 0e2b7a5..bcfb928 100644 --- a/documents/solar-AssetManagementContract_2019-07-31_def.xml +++ b/documents/solar-AssetManagementContract_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - AssetManagementContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-AssignmentOfInterest_2019-07-31_def.xml b/documents/solar-AssignmentOfInterest_2019-07-31_def.xml index 9150909..34b6e95 100644 --- a/documents/solar-AssignmentOfInterest_2019-07-31_def.xml +++ b/documents/solar-AssignmentOfInterest_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - AssignmentOfInterest--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-AssignmentandAssumptionAgreement_2019-07-31_def.xml b/documents/solar-AssignmentandAssumptionAgreement_2019-07-31_def.xml index ab14df9..d81af75 100644 --- a/documents/solar-AssignmentandAssumptionAgreement_2019-07-31_def.xml +++ b/documents/solar-AssignmentandAssumptionAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - AssignmentandAssumptionAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-BillOfSale_2019-07-31_def.xml b/documents/solar-BillOfSale_2019-07-31_def.xml index f9289c0..0d0df04 100644 --- a/documents/solar-BillOfSale_2019-07-31_def.xml +++ b/documents/solar-BillOfSale_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - BillOfSale--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-BoardResolutionforMasterLesseeLesseeandOperator_2019-07-31_def.xml b/documents/solar-BoardResolutionforMasterLesseeLesseeandOperator_2019-07-31_def.xml index 7052984..d866faa 100644 --- a/documents/solar-BoardResolutionforMasterLesseeLesseeandOperator_2019-07-31_def.xml +++ b/documents/solar-BoardResolutionforMasterLesseeLesseeandOperator_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - BoardResolutionforMasterLesseeLesseeandOperator--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-BreakageFeeSideLetter_2019-07-31_def.xml b/documents/solar-BreakageFeeSideLetter_2019-07-31_def.xml index e535c27..1cef98b 100644 --- a/documents/solar-BreakageFeeSideLetter_2019-07-31_def.xml +++ b/documents/solar-BreakageFeeSideLetter_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - BreakageFeeSideLetter--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-BuildingInspection_2019-07-31_def.xml b/documents/solar-BuildingInspection_2019-07-31_def.xml index ba608ca..6b7e73b 100644 --- a/documents/solar-BuildingInspection_2019-07-31_def.xml +++ b/documents/solar-BuildingInspection_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - BuildingInspection--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-BusinessInterruptionInsurancePolicy_2019-07-31_def.xml b/documents/solar-BusinessInterruptionInsurancePolicy_2019-07-31_def.xml index 0efda14..0e56e70 100644 --- a/documents/solar-BusinessInterruptionInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-BusinessInterruptionInsurancePolicy_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - BusinessInterruptionInsurancePolicy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - + + diff --git a/documents/solar-CasualtyInsurancePolicy_2019-07-31_def.xml b/documents/solar-CasualtyInsurancePolicy_2019-07-31_def.xml index 937951e..5e7296a 100644 --- a/documents/solar-CasualtyInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-CasualtyInsurancePolicy_2019-07-31_def.xml @@ -23,29 +23,29 @@ Orange Button Taxonomy - CasualtyInsurancePolicy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - + + diff --git a/documents/solar-CertificateOfAcceptanceReport_2019-07-31_def.xml b/documents/solar-CertificateOfAcceptanceReport_2019-07-31_def.xml index 4ea5edd..6e56632 100644 --- a/documents/solar-CertificateOfAcceptanceReport_2019-07-31_def.xml +++ b/documents/solar-CertificateOfAcceptanceReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CertificateOfAcceptanceReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CertificateOfCompletion_2019-07-31_def.xml b/documents/solar-CertificateOfCompletion_2019-07-31_def.xml index 155fe53..e105c5f 100644 --- a/documents/solar-CertificateOfCompletion_2019-07-31_def.xml +++ b/documents/solar-CertificateOfCompletion_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CertificateOfCompletion--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CertificateOfFinalCompletion_2019-07-31_def.xml b/documents/solar-CertificateOfFinalCompletion_2019-07-31_def.xml index 6214901..5439ed3 100644 --- a/documents/solar-CertificateOfFinalCompletion_2019-07-31_def.xml +++ b/documents/solar-CertificateOfFinalCompletion_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CertificateOfFinalCompletion--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CertificateOfFormationForMasterLesseeLesseeAndOperator_2019-07-31_def.xml b/documents/solar-CertificateOfFormationForMasterLesseeLesseeAndOperator_2019-07-31_def.xml index 6c23f9f..acbe61c 100644 --- a/documents/solar-CertificateOfFormationForMasterLesseeLesseeAndOperator_2019-07-31_def.xml +++ b/documents/solar-CertificateOfFormationForMasterLesseeLesseeAndOperator_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CertificateOfFormationForMasterLesseeLesseeAndOperator- xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CertificatesofInsurance_2019-07-31_def.xml b/documents/solar-CertificatesofInsurance_2019-07-31_def.xml index 9ef51ce..046ff70 100644 --- a/documents/solar-CertificatesofInsurance_2019-07-31_def.xml +++ b/documents/solar-CertificatesofInsurance_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CertificatesofInsurance--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ClosingCertificate_2019-07-31_def.xml b/documents/solar-ClosingCertificate_2019-07-31_def.xml index 2cc3b9d..57c49c9 100644 --- a/documents/solar-ClosingCertificate_2019-07-31_def.xml +++ b/documents/solar-ClosingCertificate_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ClosingCertificate--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ClosingIndemnityAgreement_2019-07-31_def.xml b/documents/solar-ClosingIndemnityAgreement_2019-07-31_def.xml index 79ac7cd..d9eb837 100644 --- a/documents/solar-ClosingIndemnityAgreement_2019-07-31_def.xml +++ b/documents/solar-ClosingIndemnityAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ClosingIndemnityAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CoTenancyAgreement_2019-07-31_def.xml b/documents/solar-CoTenancyAgreement_2019-07-31_def.xml index 41596e6..bc64367 100644 --- a/documents/solar-CoTenancyAgreement_2019-07-31_def.xml +++ b/documents/solar-CoTenancyAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CoTenancyAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CommercialGeneralInsurancePolicy_2019-07-31_def.xml b/documents/solar-CommercialGeneralInsurancePolicy_2019-07-31_def.xml index e60dd01..f12e2f9 100644 --- a/documents/solar-CommercialGeneralInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-CommercialGeneralInsurancePolicy_2019-07-31_def.xml @@ -23,29 +23,29 @@ Orange Button Taxonomy - CommercialGeneralInsurancePolicy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - + diff --git a/documents/solar-CommitmentAgreement_2019-07-31_def.xml b/documents/solar-CommitmentAgreement_2019-07-31_def.xml index 4fc0fed..fd940a6 100644 --- a/documents/solar-CommitmentAgreement_2019-07-31_def.xml +++ b/documents/solar-CommitmentAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - CommitmentAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ComponentStatusReport_2019-07-31_def.xml b/documents/solar-ComponentStatusReport_2019-07-31_def.xml index 603a1de..014f6b4 100644 --- a/documents/solar-ComponentStatusReport_2019-07-31_def.xml +++ b/documents/solar-ComponentStatusReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ComponentStatusReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ConstructionContractorNoticeofCertification_2019-07-31_def.xml b/documents/solar-ConstructionContractorNoticeofCertification_2019-07-31_def.xml index e0f65d6..4e957bd 100644 --- a/documents/solar-ConstructionContractorNoticeofCertification_2019-07-31_def.xml +++ b/documents/solar-ConstructionContractorNoticeofCertification_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ConstructionContractorNoticeofCertification--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ConstructionIssuesReport_2019-07-31_def.xml b/documents/solar-ConstructionIssuesReport_2019-07-31_def.xml index fdc73c9..c21ad67 100644 --- a/documents/solar-ConstructionIssuesReport_2019-07-31_def.xml +++ b/documents/solar-ConstructionIssuesReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ConstructionIssuesReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ConstructionLoanAgreement_2019-07-31_def.xml b/documents/solar-ConstructionLoanAgreement_2019-07-31_def.xml index 2bd52c8..80dfbf2 100644 --- a/documents/solar-ConstructionLoanAgreement_2019-07-31_def.xml +++ b/documents/solar-ConstructionLoanAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ConstructionLoanAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ConstructionMonitoringReport_2019-07-31_def.xml b/documents/solar-ConstructionMonitoringReport_2019-07-31_def.xml index 78f59df..338b019 100644 --- a/documents/solar-ConstructionMonitoringReport_2019-07-31_def.xml +++ b/documents/solar-ConstructionMonitoringReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ConstructionMonitoringReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ContinuityofOperationsAgreement_2019-07-31_def.xml b/documents/solar-ContinuityofOperationsAgreement_2019-07-31_def.xml index f51f69d..75157bf 100644 --- a/documents/solar-ContinuityofOperationsAgreement_2019-07-31_def.xml +++ b/documents/solar-ContinuityofOperationsAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ContinuityofOperationsAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-CutSheet_2019-07-31_def.xml b/documents/solar-CutSheet_2019-07-31_def.xml index f4983e1..8eaa221 100644 --- a/documents/solar-CutSheet_2019-07-31_def.xml +++ b/documents/solar-CutSheet_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - Cut Sheet (Data Sheet)--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - + diff --git a/documents/solar-CutSheet_2019-07-31_uml.xml b/documents/solar-CutSheet_2019-07-31_uml.xml index 110dca9..c9affb6 100644 --- a/documents/solar-CutSheet_2019-07-31_uml.xml +++ b/documents/solar-CutSheet_2019-07-31_uml.xml @@ -24,12 +24,8 @@ Orange Button Taxonomy - Cut Sheet (Data Sheet)--> xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd http://xbrl.org/2008/generic http://www.xbrl.org/2008/generic-link.xsd"> - xlink:href="../documents\solar-CutSheet_2019-07-31.xsd#roleType_CutSheet" xlink:type="simple"/> + xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-DeveloperPerformanceGuarantee_2019-07-31_def.xml b/documents/solar-DeveloperPerformanceGuarantee_2019-07-31_def.xml index 9d84379..4951d3f 100644 --- a/documents/solar-DeveloperPerformanceGuarantee_2019-07-31_def.xml +++ b/documents/solar-DeveloperPerformanceGuarantee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - DeveloperPerformanceGuarantee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-EasementReport_2019-07-31_def.xml b/documents/solar-EasementReport_2019-07-31_def.xml index 76b0d38..2c2a61a 100644 --- a/documents/solar-EasementReport_2019-07-31_def.xml +++ b/documents/solar-EasementReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - EasementReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ElectricalInspection_2019-07-31_def.xml b/documents/solar-ElectricalInspection_2019-07-31_def.xml index f3a043d..d370904 100644 --- a/documents/solar-ElectricalInspection_2019-07-31_def.xml +++ b/documents/solar-ElectricalInspection_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ElectricalInspection--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-EnergyProductionInsurancePolicy_2019-07-31_def.xml b/documents/solar-EnergyProductionInsurancePolicy_2019-07-31_def.xml index 34b70b6..9e49ea0 100644 --- a/documents/solar-EnergyProductionInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-EnergyProductionInsurancePolicy_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - EnergyProductionInsurancePolicy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - + + diff --git a/documents/solar-EngineeringProcurementAndConstructionContract_2019-07-31_def.xml b/documents/solar-EngineeringProcurementAndConstructionContract_2019-07-31_def.xml index a44c111..5d4e2f6 100644 --- a/documents/solar-EngineeringProcurementAndConstructionContract_2019-07-31_def.xml +++ b/documents/solar-EngineeringProcurementAndConstructionContract_2019-07-31_def.xml @@ -23,29 +23,29 @@ Orange Button Taxonomy - EngineeringProcurementAndConstructionContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - + + diff --git a/documents/solar-EnvironmentalAssessmentII_2019-07-31_def.xml b/documents/solar-EnvironmentalAssessmentII_2019-07-31_def.xml index 9691d03..7efe137 100644 --- a/documents/solar-EnvironmentalAssessmentII_2019-07-31_def.xml +++ b/documents/solar-EnvironmentalAssessmentII_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - EnvironmentalAssessmentII--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - roleURI="http://xbrl.us/Solar/2019-07-31/roles/EnvironmentalAssessmentII" xlink:href="../documents\solar-EnvironmentalAssessmentII_2019-07-31.xsd#roleType_EnvironmentalAssessmentII" xlink:type="simple"/> + diff --git a/documents/solar-EnvironmentalAssessmentI_2019-07-31_def.xml b/documents/solar-EnvironmentalAssessmentI_2019-07-31_def.xml index 13c905b..734d6d8 100644 --- a/documents/solar-EnvironmentalAssessmentI_2019-07-31_def.xml +++ b/documents/solar-EnvironmentalAssessmentI_2019-07-31_def.xml @@ -23,29 +23,29 @@ Orange Button Taxonomy - EnvironmentalAssessmentI--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - + diff --git a/documents/solar-EnvironmentalImpactReport_2019-07-31_def.xml b/documents/solar-EnvironmentalImpactReport_2019-07-31_def.xml index 36814ed..fdd6e32 100644 --- a/documents/solar-EnvironmentalImpactReport_2019-07-31_def.xml +++ b/documents/solar-EnvironmentalImpactReport_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - EnvironmentalImpactReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-EquityContributionAgreement_2019-07-31_def.xml b/documents/solar-EquityContributionAgreement_2019-07-31_def.xml index 76a4ff4..b536e94 100644 --- a/documents/solar-EquityContributionAgreement_2019-07-31_def.xml +++ b/documents/solar-EquityContributionAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - EquityContributionAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-EquityContributionGuarantee_2019-07-31_def.xml b/documents/solar-EquityContributionGuarantee_2019-07-31_def.xml index 713d19c..0c69092 100644 --- a/documents/solar-EquityContributionGuarantee_2019-07-31_def.xml +++ b/documents/solar-EquityContributionGuarantee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - EquityContributionGuarantee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-EstoppelCertificatePowerPurchaseAgreement_2019-07-31_def.xml b/documents/solar-EstoppelCertificatePowerPurchaseAgreement_2019-07-31_def.xml index ce03302..3540b6c 100644 --- a/documents/solar-EstoppelCertificatePowerPurchaseAgreement_2019-07-31_def.xml +++ b/documents/solar-EstoppelCertificatePowerPurchaseAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - EstoppelCertificatePowerPurchaseAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ExposureReport_2019-07-31_def.xml b/documents/solar-ExposureReport_2019-07-31_def.xml index a79b82f..7ef7661 100644 --- a/documents/solar-ExposureReport_2019-07-31_def.xml +++ b/documents/solar-ExposureReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ExposureReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-FinancialLeaseSchedule_2019-07-31_def.xml b/documents/solar-FinancialLeaseSchedule_2019-07-31_def.xml index a88bfa8..7183a39 100644 --- a/documents/solar-FinancialLeaseSchedule_2019-07-31_def.xml +++ b/documents/solar-FinancialLeaseSchedule_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - FinancialLeaseSchedule--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-FundingMemo_2019-07-31_def.xml b/documents/solar-FundingMemo_2019-07-31_def.xml index e9e1e78..cea2af2 100644 --- a/documents/solar-FundingMemo_2019-07-31_def.xml +++ b/documents/solar-FundingMemo_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - FundingMemo--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-GuaranteeandPledgementAgreement_2019-07-31_def.xml b/documents/solar-GuaranteeandPledgementAgreement_2019-07-31_def.xml index 0d3f216..f6c3929 100644 --- a/documents/solar-GuaranteeandPledgementAgreement_2019-07-31_def.xml +++ b/documents/solar-GuaranteeandPledgementAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - GuaranteeandPledgementAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-Guarantees_2019-07-31_def.xml b/documents/solar-Guarantees_2019-07-31_def.xml index a43d374..142e97e 100644 --- a/documents/solar-Guarantees_2019-07-31_def.xml +++ b/documents/solar-Guarantees_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - Guarantees--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-HedgeAgreement_2019-07-31_def.xml b/documents/solar-HedgeAgreement_2019-07-31_def.xml index b3d8ea6..a1c6cee 100644 --- a/documents/solar-HedgeAgreement_2019-07-31_def.xml +++ b/documents/solar-HedgeAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - HedgeAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-HostAcknowledgement_2019-07-31_def.xml b/documents/solar-HostAcknowledgement_2019-07-31_def.xml index 100fd60..fa16f99 100644 --- a/documents/solar-HostAcknowledgement_2019-07-31_def.xml +++ b/documents/solar-HostAcknowledgement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - HostAcknowledgement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-IECRECertificate_2019-07-31_def.xml b/documents/solar-IECRECertificate_2019-07-31_def.xml index 0ebde10..4675b11 100644 --- a/documents/solar-IECRECertificate_2019-07-31_def.xml +++ b/documents/solar-IECRECertificate_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - IECRECertificate--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> roleURI="http://xbrl.us/Solar/2019-07-31/roles/IECRECertificate" xlink:href="../documents\solar-IECRECertificate_2019-07-31.xsd#roleType_IECRECertificate" xlink:type="simple"/> - + diff --git a/documents/solar-IncentiveAssignment_2019-07-31_def.xml b/documents/solar-IncentiveAssignment_2019-07-31_def.xml index 2e3c0bb..a5db08a 100644 --- a/documents/solar-IncentiveAssignment_2019-07-31_def.xml +++ b/documents/solar-IncentiveAssignment_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - IncentiveAssignment--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-IncumbencyCertificate_2019-07-31_def.xml b/documents/solar-IncumbencyCertificate_2019-07-31_def.xml index 8ebc431..8e06386 100644 --- a/documents/solar-IncumbencyCertificate_2019-07-31_def.xml +++ b/documents/solar-IncumbencyCertificate_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - IncumbencyCertificate--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-IndependentEngineeringOpinionReport_2019-07-31_def.xml b/documents/solar-IndependentEngineeringOpinionReport_2019-07-31_def.xml index 63f43c2..247d35c 100644 --- a/documents/solar-IndependentEngineeringOpinionReport_2019-07-31_def.xml +++ b/documents/solar-IndependentEngineeringOpinionReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - IndependentEngineeringOpinionReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-IndependentEngineeringReport_2019-07-31_def.xml b/documents/solar-IndependentEngineeringReport_2019-07-31_def.xml index f3a3245..187af5b 100644 --- a/documents/solar-IndependentEngineeringReport_2019-07-31_def.xml +++ b/documents/solar-IndependentEngineeringReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - IndependentEngineeringReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-IndependentEngineeringServicesCheckList_2019-07-31_def.xml b/documents/solar-IndependentEngineeringServicesCheckList_2019-07-31_def.xml index 107c979..c99b5eb 100644 --- a/documents/solar-IndependentEngineeringServicesCheckList_2019-07-31_def.xml +++ b/documents/solar-IndependentEngineeringServicesCheckList_2019-07-31_def.xml @@ -23,29 +23,29 @@ Orange Button Taxonomy - IndependentEngineeringServicesCheckList--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - - + diff --git a/documents/solar-InsuranceConsultantReport_2019-07-31_def.xml b/documents/solar-InsuranceConsultantReport_2019-07-31_def.xml index 47d85a7..2c214d4 100644 --- a/documents/solar-InsuranceConsultantReport_2019-07-31_def.xml +++ b/documents/solar-InsuranceConsultantReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - InsuranceConsultantReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-InterconnectionAgreement_2019-07-31_def.xml b/documents/solar-InterconnectionAgreement_2019-07-31_def.xml index 2b9b12e..f5c6c45 100644 --- a/documents/solar-InterconnectionAgreement_2019-07-31_def.xml +++ b/documents/solar-InterconnectionAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - InterconnectionAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-InterconnectionApproval_2019-07-31_def.xml b/documents/solar-InterconnectionApproval_2019-07-31_def.xml index ca3d09d..63573ed 100644 --- a/documents/solar-InterconnectionApproval_2019-07-31_def.xml +++ b/documents/solar-InterconnectionApproval_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - InterconnectionApproval--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-InvestmentMemo_2019-07-31_def.xml b/documents/solar-InvestmentMemo_2019-07-31_def.xml index 0d36dbf..13db620 100644 --- a/documents/solar-InvestmentMemo_2019-07-31_def.xml +++ b/documents/solar-InvestmentMemo_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - InvestmentMemo--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-InvoiceIncludingWiringInstructions_2019-07-31_def.xml b/documents/solar-InvoiceIncludingWiringInstructions_2019-07-31_def.xml index dbe9035..98699c3 100644 --- a/documents/solar-InvoiceIncludingWiringInstructions_2019-07-31_def.xml +++ b/documents/solar-InvoiceIncludingWiringInstructions_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - InvoiceIncludingWiringInstructions--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LCCRegistration_2019-07-31_def.xml b/documents/solar-LCCRegistration_2019-07-31_def.xml index 8ff4eda..9fedc39 100644 --- a/documents/solar-LCCRegistration_2019-07-31_def.xml +++ b/documents/solar-LCCRegistration_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LCCRegistration--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LLCFormationDocuments_2019-07-31_def.xml b/documents/solar-LLCFormationDocuments_2019-07-31_def.xml index 150568d..08ea8bb 100644 --- a/documents/solar-LLCFormationDocuments_2019-07-31_def.xml +++ b/documents/solar-LLCFormationDocuments_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LLCFormationDocuments--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LeaseContractForProject_2019-07-31_def.xml b/documents/solar-LeaseContractForProject_2019-07-31_def.xml index 15a138a..f6d8671 100644 --- a/documents/solar-LeaseContractForProject_2019-07-31_def.xml +++ b/documents/solar-LeaseContractForProject_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - LeaseContractForProject--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LesseeCollateralAgencyAgreement_2019-07-31_def.xml b/documents/solar-LesseeCollateralAgencyAgreement_2019-07-31_def.xml index c918305..65c1800 100644 --- a/documents/solar-LesseeCollateralAgencyAgreement_2019-07-31_def.xml +++ b/documents/solar-LesseeCollateralAgencyAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LesseeCollateralAgencyAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LesseeSecurityAgreement_2019-07-31_def.xml b/documents/solar-LesseeSecurityAgreement_2019-07-31_def.xml index 8232ac7..ffdd86e 100644 --- a/documents/solar-LesseeSecurityAgreement_2019-07-31_def.xml +++ b/documents/solar-LesseeSecurityAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LesseeSecurityAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LetterofCredit_2019-07-31_def.xml b/documents/solar-LetterofCredit_2019-07-31_def.xml index e53cf92..887f782 100644 --- a/documents/solar-LetterofCredit_2019-07-31_def.xml +++ b/documents/solar-LetterofCredit_2019-07-31_def.xml @@ -22,9 +22,13 @@ Orange Button Taxonomy - LetterofCredit--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LienWaiver_2019-07-31_def.xml b/documents/solar-LienWaiver_2019-07-31_def.xml index 219a25f..510f7b2 100644 --- a/documents/solar-LienWaiver_2019-07-31_def.xml +++ b/documents/solar-LienWaiver_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LienWaiver--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LimitedLiabilityCompanyAgreement_2019-07-31_def.xml b/documents/solar-LimitedLiabilityCompanyAgreement_2019-07-31_def.xml index 181581c..aa84dc6 100644 --- a/documents/solar-LimitedLiabilityCompanyAgreement_2019-07-31_def.xml +++ b/documents/solar-LimitedLiabilityCompanyAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LimitedLiabilityCompanyAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-LocalIncentiveContract_2019-07-31_def.xml b/documents/solar-LocalIncentiveContract_2019-07-31_def.xml index bfdb6ab..1e678c3 100644 --- a/documents/solar-LocalIncentiveContract_2019-07-31_def.xml +++ b/documents/solar-LocalIncentiveContract_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - LocalIncentiveContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MasterLease_2019-07-31_def.xml b/documents/solar-MasterLease_2019-07-31_def.xml index 3d8f5e6..82aea5f 100644 --- a/documents/solar-MasterLease_2019-07-31_def.xml +++ b/documents/solar-MasterLease_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MasterLease--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MasterLesseeCollateralAgencyAgreement_2019-07-31_def.xml b/documents/solar-MasterLesseeCollateralAgencyAgreement_2019-07-31_def.xml index d257a7c..853acec 100644 --- a/documents/solar-MasterLesseeCollateralAgencyAgreement_2019-07-31_def.xml +++ b/documents/solar-MasterLesseeCollateralAgencyAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MasterLesseeCollateralAgencyAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MasterLesseeSecurityAgreement_2019-07-31_def.xml b/documents/solar-MasterLesseeSecurityAgreement_2019-07-31_def.xml index 5ed4473..30e3d90 100644 --- a/documents/solar-MasterLesseeSecurityAgreement_2019-07-31_def.xml +++ b/documents/solar-MasterLesseeSecurityAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MasterLesseeSecurityAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MasterPurchaseAgreement_2019-07-31_def.xml b/documents/solar-MasterPurchaseAgreement_2019-07-31_def.xml index 081fbf5..eee7290 100644 --- a/documents/solar-MasterPurchaseAgreement_2019-07-31_def.xml +++ b/documents/solar-MasterPurchaseAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MasterPurchaseAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MasterServicesAgreement_2019-07-31_def.xml b/documents/solar-MasterServicesAgreement_2019-07-31_def.xml index 6788e72..ca12a07 100644 --- a/documents/solar-MasterServicesAgreement_2019-07-31_def.xml +++ b/documents/solar-MasterServicesAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MasterServicesAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MechanicalCompletionCertificate_2019-07-31_def.xml b/documents/solar-MechanicalCompletionCertificate_2019-07-31_def.xml index efd8cc3..35a02ed 100644 --- a/documents/solar-MechanicalCompletionCertificate_2019-07-31_def.xml +++ b/documents/solar-MechanicalCompletionCertificate_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MechanicalCompletionCertificate--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MembershipCertificateofLessee_2019-07-31_def.xml b/documents/solar-MembershipCertificateofLessee_2019-07-31_def.xml index 03d785b..c5f55d2 100644 --- a/documents/solar-MembershipCertificateofLessee_2019-07-31_def.xml +++ b/documents/solar-MembershipCertificateofLessee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MembershipCertificateofLessee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MembershipCertificateofMasterLessee_2019-07-31_def.xml b/documents/solar-MembershipCertificateofMasterLessee_2019-07-31_def.xml index 251d11c..3de8b96 100644 --- a/documents/solar-MembershipCertificateofMasterLessee_2019-07-31_def.xml +++ b/documents/solar-MembershipCertificateofMasterLessee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MembershipCertificateofMasterLessee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MembershipInterestPurchaseAgreement_2019-07-31_def.xml b/documents/solar-MembershipInterestPurchaseAgreement_2019-07-31_def.xml index 09338ef..b04ca97 100644 --- a/documents/solar-MembershipInterestPurchaseAgreement_2019-07-31_def.xml +++ b/documents/solar-MembershipInterestPurchaseAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - MembershipInterestPurchaseAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ModuleAcceleratedAgeTestReport_2019-07-31_def.xml b/documents/solar-ModuleAcceleratedAgeTestReport_2019-07-31_def.xml index 6b5b76c..8973fab 100644 --- a/documents/solar-ModuleAcceleratedAgeTestReport_2019-07-31_def.xml +++ b/documents/solar-ModuleAcceleratedAgeTestReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ModuleAcceleratedAgeTestReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ModuleFactoryAuditReport_2019-07-31_def.xml b/documents/solar-ModuleFactoryAuditReport_2019-07-31_def.xml index 9a43f9a..3ec0a0f 100644 --- a/documents/solar-ModuleFactoryAuditReport_2019-07-31_def.xml +++ b/documents/solar-ModuleFactoryAuditReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ModuleFactoryAuditReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MonitoringContract_2019-07-31.xsd b/documents/solar-MonitoringContract_2019-07-31.xsd index 2ed08f9..1bf72cc 100644 --- a/documents/solar-MonitoringContract_2019-07-31.xsd +++ b/documents/solar-MonitoringContract_2019-07-31.xsd @@ -14,7 +14,7 @@ See the License for the specific language governing permissions and limitations under the License. -Orange Button Taxonomy - MonitoringContract--> +Orange Button D1176 - MonitoringContract--> +Orange Button D1176 - MonitoringContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-MonitoringContract_2019-07-31_pre.xml b/documents/solar-MonitoringContract_2019-07-31_pre.xml index 2c397d1..f64a103 100644 --- a/documents/solar-MonitoringContract_2019-07-31_pre.xml +++ b/documents/solar-MonitoringContract_2019-07-31_pre.xml @@ -14,7 +14,7 @@ See the License for the specific language governing permissions and limitations under the License. -Orange Button Taxonomy - MonitoringContract--> +Orange Button D1176 - MonitoringContract--> + + + + This schema contains the entry point for the MonthlyOperatingReport + + + 100825 - Documents - Monthly Operating Report + link:presentationLink + link:definitionLink + + + + + + + + diff --git a/documents/solar-MonthlyOperatingReport_2019-07-31_def.xml b/documents/solar-MonthlyOperatingReport_2019-07-31_def.xml new file mode 100644 index 0000000..dc4dd18 --- /dev/null +++ b/documents/solar-MonthlyOperatingReport_2019-07-31_def.xml @@ -0,0 +1,919 @@ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + diff --git a/documents/solar-MonthlyOperatingReport_2019-07-31_pre.xml b/documents/solar-MonthlyOperatingReport_2019-07-31_pre.xml new file mode 100644 index 0000000..e1a1d81 --- /dev/null +++ b/documents/solar-MonthlyOperatingReport_2019-07-31_pre.xml @@ -0,0 +1,876 @@ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + diff --git a/documents/solar-NoticeOfCommercialOperation_2019-07-31_def.xml b/documents/solar-NoticeOfCommercialOperation_2019-07-31_def.xml index db5a96f..bc99397 100644 --- a/documents/solar-NoticeOfCommercialOperation_2019-07-31_def.xml +++ b/documents/solar-NoticeOfCommercialOperation_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - NoticeOfCommercialOperation--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-NoticeandPaymentInstructions_2019-07-31_def.xml b/documents/solar-NoticeandPaymentInstructions_2019-07-31_def.xml index 25fab47..3449bb5 100644 --- a/documents/solar-NoticeandPaymentInstructions_2019-07-31_def.xml +++ b/documents/solar-NoticeandPaymentInstructions_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - NoticeandPaymentInstructions--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-NoticeofApproval_2019-07-31_def.xml b/documents/solar-NoticeofApproval_2019-07-31_def.xml index 3b11494..f510df9 100644 --- a/documents/solar-NoticeofApproval_2019-07-31_def.xml +++ b/documents/solar-NoticeofApproval_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - NoticeofApproval--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-NoticeofCommercialOperationsDate_2019-07-31_def.xml b/documents/solar-NoticeofCommercialOperationsDate_2019-07-31_def.xml index 95290dc..045a427 100644 --- a/documents/solar-NoticeofCommercialOperationsDate_2019-07-31_def.xml +++ b/documents/solar-NoticeofCommercialOperationsDate_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - NoticeofCommercialOperationsDate--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperatingAgreementsForMasterLesseeLesseeandOperator_2019-07-31_def.xml b/documents/solar-OperatingAgreementsForMasterLesseeLesseeandOperator_2019-07-31_def.xml index c5cec58..ae28ef1 100644 --- a/documents/solar-OperatingAgreementsForMasterLesseeLesseeandOperator_2019-07-31_def.xml +++ b/documents/solar-OperatingAgreementsForMasterLesseeLesseeandOperator_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperatingAgreementsForMasterLesseeLesseeandOperator--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperationalEventReport_2019-07-31_def.xml b/documents/solar-OperationalEventReport_2019-07-31_def.xml index ac58b34..a2fadfa 100644 --- a/documents/solar-OperationalEventReport_2019-07-31_def.xml +++ b/documents/solar-OperationalEventReport_2019-07-31_def.xml @@ -22,9 +22,13 @@ Orange Button Taxonomy - OperationalEventReport--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - + diff --git a/documents/solar-OperationalIssuesReport_2019-07-31_def.xml b/documents/solar-OperationalIssuesReport_2019-07-31_def.xml index 6f0bf89..fce0d91 100644 --- a/documents/solar-OperationalIssuesReport_2019-07-31_def.xml +++ b/documents/solar-OperationalIssuesReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperationalIssuesReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperationsAndMaintenanceSubcontractorContract_2019-07-31_def.xml b/documents/solar-OperationsAndMaintenanceSubcontractorContract_2019-07-31_def.xml index 86e7d12..9e555d6 100644 --- a/documents/solar-OperationsAndMaintenanceSubcontractorContract_2019-07-31_def.xml +++ b/documents/solar-OperationsAndMaintenanceSubcontractorContract_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperationsAndMaintenanceSubcontractorContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperationsManual_2019-07-31_def.xml b/documents/solar-OperationsManual_2019-07-31_def.xml index 4f5840b..39591d1 100644 --- a/documents/solar-OperationsManual_2019-07-31_def.xml +++ b/documents/solar-OperationsManual_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperationsManual--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperationsandMaintenanceContract_2019-07-31_def.xml b/documents/solar-OperationsandMaintenanceContract_2019-07-31_def.xml index da7145e..6220f07 100644 --- a/documents/solar-OperationsandMaintenanceContract_2019-07-31_def.xml +++ b/documents/solar-OperationsandMaintenanceContract_2019-07-31_def.xml @@ -23,8 +23,12 @@ Orange Button Taxonomy - OperationsandMaintenanceContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - + diff --git a/documents/solar-OperationsandMaintenanceManual_2019-07-31_def.xml b/documents/solar-OperationsandMaintenanceManual_2019-07-31_def.xml index df821bf..abf7ed7 100644 --- a/documents/solar-OperationsandMaintenanceManual_2019-07-31_def.xml +++ b/documents/solar-OperationsandMaintenanceManual_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperationsandMaintenanceManual--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperatorGuarantee_2019-07-31_def.xml b/documents/solar-OperatorGuarantee_2019-07-31_def.xml index 0d1adc8..8a23121 100644 --- a/documents/solar-OperatorGuarantee_2019-07-31_def.xml +++ b/documents/solar-OperatorGuarantee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperatorGuarantee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OperatorPerformanceSponsorGuaranteeContract_2019-07-31_def.xml b/documents/solar-OperatorPerformanceSponsorGuaranteeContract_2019-07-31_def.xml index 199b0c7..df337c2 100644 --- a/documents/solar-OperatorPerformanceSponsorGuaranteeContract_2019-07-31_def.xml +++ b/documents/solar-OperatorPerformanceSponsorGuaranteeContract_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OperatorPerformanceSponsorGuaranteeContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OriginationRequest_2019-07-31_def.xml b/documents/solar-OriginationRequest_2019-07-31_def.xml index c18e0de..aced878 100644 --- a/documents/solar-OriginationRequest_2019-07-31_def.xml +++ b/documents/solar-OriginationRequest_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OriginationRequest--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-OtherEquipmentDueDiligenceReports_2019-07-31_def.xml b/documents/solar-OtherEquipmentDueDiligenceReports_2019-07-31_def.xml index 8bdbe95..4c8ab66 100644 --- a/documents/solar-OtherEquipmentDueDiligenceReports_2019-07-31_def.xml +++ b/documents/solar-OtherEquipmentDueDiligenceReports_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - OtherEquipmentDueDiligenceReports--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ParentGuarantee_2019-07-31_def.xml b/documents/solar-ParentGuarantee_2019-07-31_def.xml index 2b5ecf3..eeaacdf 100644 --- a/documents/solar-ParentGuarantee_2019-07-31_def.xml +++ b/documents/solar-ParentGuarantee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ParentGuarantee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PartnershipFlipContractForProject_2019-07-31_def.xml b/documents/solar-PartnershipFlipContractForProject_2019-07-31_def.xml index 044fbba..736ee0c 100644 --- a/documents/solar-PartnershipFlipContractForProject_2019-07-31_def.xml +++ b/documents/solar-PartnershipFlipContractForProject_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PartnershipFlipContractForProject--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PerformanceGuarantee_2019-07-31_def.xml b/documents/solar-PerformanceGuarantee_2019-07-31_def.xml index 123d78b..d74f187 100644 --- a/documents/solar-PerformanceGuarantee_2019-07-31_def.xml +++ b/documents/solar-PerformanceGuarantee_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PerformanceGuarantee--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PermissionToOperateInterconnectionApproval_2019-07-31_def.xml b/documents/solar-PermissionToOperateInterconnectionApproval_2019-07-31_def.xml index 576a178..db1f8a2 100644 --- a/documents/solar-PermissionToOperateInterconnectionApproval_2019-07-31_def.xml +++ b/documents/solar-PermissionToOperateInterconnectionApproval_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PermissionToOperateInterconnectionApproval--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PledgeAgreement_2019-07-31_def.xml b/documents/solar-PledgeAgreement_2019-07-31_def.xml index f4bf8a9..045b6df 100644 --- a/documents/solar-PledgeAgreement_2019-07-31_def.xml +++ b/documents/solar-PledgeAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PledgeAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PowerPurchaseAgreement_2019-07-31_def.xml b/documents/solar-PowerPurchaseAgreement_2019-07-31_def.xml index da3bdea..d95ed8d 100644 --- a/documents/solar-PowerPurchaseAgreement_2019-07-31_def.xml +++ b/documents/solar-PowerPurchaseAgreement_2019-07-31_def.xml @@ -22,30 +22,30 @@ Orange Button Taxonomy - PowerPurchaseAgreement--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + - - + diff --git a/documents/solar-PricingFile_2019-07-31_def.xml b/documents/solar-PricingFile_2019-07-31_def.xml index 8585cba..e1edfc6 100644 --- a/documents/solar-PricingFile_2019-07-31_def.xml +++ b/documents/solar-PricingFile_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PricingFile--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PricingModelReport_2019-07-31_def.xml b/documents/solar-PricingModelReport_2019-07-31_def.xml index ff610d3..976234b 100644 --- a/documents/solar-PricingModelReport_2019-07-31_def.xml +++ b/documents/solar-PricingModelReport_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PricingModelReport--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-ProjectAdministrationAgreement_2019-07-31_def.xml b/documents/solar-ProjectAdministrationAgreement_2019-07-31_def.xml index 4af99e7..2c0bd78 100644 --- a/documents/solar-ProjectAdministrationAgreement_2019-07-31_def.xml +++ b/documents/solar-ProjectAdministrationAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - ProjectAdministrationAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PropertyInsuranceCertificate_2019-07-31_def.xml b/documents/solar-PropertyInsuranceCertificate_2019-07-31_def.xml index c92fc8c..44a7263 100644 --- a/documents/solar-PropertyInsuranceCertificate_2019-07-31_def.xml +++ b/documents/solar-PropertyInsuranceCertificate_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PropertyInsuranceCertificate--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PropertyInsurancePolicy_2019-07-31_def.xml b/documents/solar-PropertyInsurancePolicy_2019-07-31_def.xml index 314503a..41aacd6 100644 --- a/documents/solar-PropertyInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-PropertyInsurancePolicy_2019-07-31_def.xml @@ -22,14 +22,14 @@ Orange Button Taxonomy - PropertyInsurancePolicy--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> - + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - + diff --git a/documents/solar-PropertyTaxExemptionOpinion_2019-07-31_def.xml b/documents/solar-PropertyTaxExemptionOpinion_2019-07-31_def.xml index d3dc509..ad52fd4 100644 --- a/documents/solar-PropertyTaxExemptionOpinion_2019-07-31_def.xml +++ b/documents/solar-PropertyTaxExemptionOpinion_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PropertyTaxExemptionOpinion--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-PunchList_2019-07-31_def.xml b/documents/solar-PunchList_2019-07-31_def.xml index 3bb4b01..97e0fbb 100644 --- a/documents/solar-PunchList_2019-07-31_def.xml +++ b/documents/solar-PunchList_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - PunchList--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-QualifyingFacilitiesSelfCertification_2019-07-31_def.xml b/documents/solar-QualifyingFacilitiesSelfCertification_2019-07-31_def.xml index b502b8b..0b68c17 100644 --- a/documents/solar-QualifyingFacilitiesSelfCertification_2019-07-31_def.xml +++ b/documents/solar-QualifyingFacilitiesSelfCertification_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - QualifyingFacilitiesSelfCertification--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-RECBuyerAcknowledgement_2019-07-31_def.xml b/documents/solar-RECBuyerAcknowledgement_2019-07-31_def.xml index c2c1920..6d7f700 100644 --- a/documents/solar-RECBuyerAcknowledgement_2019-07-31_def.xml +++ b/documents/solar-RECBuyerAcknowledgement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - RECBuyerAcknowledgement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-RenewableEnergyCreditOfftakeAgreement_2019-07-31_def.xml b/documents/solar-RenewableEnergyCreditOfftakeAgreement_2019-07-31_def.xml index 25d741c..99a3ee8 100644 --- a/documents/solar-RenewableEnergyCreditOfftakeAgreement_2019-07-31_def.xml +++ b/documents/solar-RenewableEnergyCreditOfftakeAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - RenewableEnergyCreditOfftakeAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-RenewableEnergyCreditPerformanceAgreement_2019-07-31_def.xml b/documents/solar-RenewableEnergyCreditPerformanceAgreement_2019-07-31_def.xml index 01cb06e..60a40be 100644 --- a/documents/solar-RenewableEnergyCreditPerformanceAgreement_2019-07-31_def.xml +++ b/documents/solar-RenewableEnergyCreditPerformanceAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - RenewableEnergyCreditPerformanceAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-RentReserveLetterofCredit_2019-07-31_def.xml b/documents/solar-RentReserveLetterofCredit_2019-07-31_def.xml index ae355ae..332d526 100644 --- a/documents/solar-RentReserveLetterofCredit_2019-07-31_def.xml +++ b/documents/solar-RentReserveLetterofCredit_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - RentReserveLetterofCredit--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-SalesLeasebackContractForProject_2019-07-31_def.xml b/documents/solar-SalesLeasebackContractForProject_2019-07-31_def.xml index bfcfaa0..d3d8b20 100644 --- a/documents/solar-SalesLeasebackContractForProject_2019-07-31_def.xml +++ b/documents/solar-SalesLeasebackContractForProject_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - SalesLeasebackContractForProject--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-SecurityAgreementSupplement_2019-07-31_def.xml b/documents/solar-SecurityAgreementSupplement_2019-07-31_def.xml index 332fdf0..54b4a53 100644 --- a/documents/solar-SecurityAgreementSupplement_2019-07-31_def.xml +++ b/documents/solar-SecurityAgreementSupplement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - SecurityAgreementSupplement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-SecurityContract_2019-07-31_def.xml b/documents/solar-SecurityContract_2019-07-31_def.xml index f1c84e1..b1104c8 100644 --- a/documents/solar-SecurityContract_2019-07-31_def.xml +++ b/documents/solar-SecurityContract_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - SecurityContract--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-SharedFacilityAgreement_2019-07-31_def.xml b/documents/solar-SharedFacilityAgreement_2019-07-31_def.xml index 1588ba8..f418865 100644 --- a/documents/solar-SharedFacilityAgreement_2019-07-31_def.xml +++ b/documents/solar-SharedFacilityAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - SharedFacilityAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-SiteControlContract_2019-07-31_def.xml b/documents/solar-SiteControlContract_2019-07-31_def.xml index 1e812e3..5ad2d61 100644 --- a/documents/solar-SiteControlContract_2019-07-31_def.xml +++ b/documents/solar-SiteControlContract_2019-07-31_def.xml @@ -22,9 +22,13 @@ Orange Button Taxonomy - SiteControlContract--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - + diff --git a/documents/solar-SiteLeaseMemo_2019-07-31_def.xml b/documents/solar-SiteLeaseMemo_2019-07-31_def.xml index c1093cb..127b1e0 100644 --- a/documents/solar-SiteLeaseMemo_2019-07-31_def.xml +++ b/documents/solar-SiteLeaseMemo_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - SiteLeaseMemo--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - roleURI="http://xbrl.us/Solar/2019-07-31/roles/SiteLeaseMemo" xlink:href="../documents\solar-SiteLeaseMemo_2019-07-31.xsd#roleType_SiteLeaseMemo" xlink:type="simple"/> + diff --git a/documents/solar-SiteLease_2019-07-31_def.xml b/documents/solar-SiteLease_2019-07-31_def.xml index d1f2ab5..4b77285 100644 --- a/documents/solar-SiteLease_2019-07-31_def.xml +++ b/documents/solar-SiteLease_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - SiteLease--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> roleURI="http://xbrl.us/Solar/2019-07-31/roles/SiteLease" xlink:href="../documents\solar-SiteLease_2019-07-31.xsd#roleType_SiteLease" xlink:type="simple"/> - + diff --git a/documents/solar-SiteLicenseAgreement_2019-07-31_def.xml b/documents/solar-SiteLicenseAgreement_2019-07-31_def.xml index 915f2a0..b44d949 100644 --- a/documents/solar-SiteLicenseAgreement_2019-07-31_def.xml +++ b/documents/solar-SiteLicenseAgreement_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - SiteLicenseAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-SupplyAgreements_2019-07-31_def.xml b/documents/solar-SupplyAgreements_2019-07-31_def.xml index ccc082f..e5b6465 100644 --- a/documents/solar-SupplyAgreements_2019-07-31_def.xml +++ b/documents/solar-SupplyAgreements_2019-07-31_def.xml @@ -22,9 +22,13 @@ Orange Button Taxonomy - SupplyAgreements--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - + diff --git a/documents/solar-SuretyBondPolicy_2019-07-31_def.xml b/documents/solar-SuretyBondPolicy_2019-07-31_def.xml index 838f551..a334151 100644 --- a/documents/solar-SuretyBondPolicy_2019-07-31_def.xml +++ b/documents/solar-SuretyBondPolicy_2019-07-31_def.xml @@ -22,9 +22,13 @@ Orange Button Taxonomy - SuretyBondPolicy--> xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-TaxOpinion_2019-07-31_def.xml b/documents/solar-TaxOpinion_2019-07-31_def.xml index 3e916aa..3978ef5 100644 --- a/documents/solar-TaxOpinion_2019-07-31_def.xml +++ b/documents/solar-TaxOpinion_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - TaxOpinion--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-TermLoan_2019-07-31_def.xml b/documents/solar-TermLoan_2019-07-31_def.xml index efcb7a6..66b5103 100644 --- a/documents/solar-TermLoan_2019-07-31_def.xml +++ b/documents/solar-TermLoan_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - TermLoan--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-TermSheet_2019-07-31_def.xml b/documents/solar-TermSheet_2019-07-31_def.xml index 68657a3..4101a47 100644 --- a/documents/solar-TermSheet_2019-07-31_def.xml +++ b/documents/solar-TermSheet_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - TermSheet--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-TitleSurvey_2019-07-31_def.xml b/documents/solar-TitleSurvey_2019-07-31_def.xml index 8a57a17..c48ce53 100644 --- a/documents/solar-TitleSurvey_2019-07-31_def.xml +++ b/documents/solar-TitleSurvey_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - TitleSurvey--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> + - xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-UCCPrecautionaryLeaseFiling_2019-07-31_def.xml b/documents/solar-UCCPrecautionaryLeaseFiling_2019-07-31_def.xml index 0a86207..b1d6952 100644 --- a/documents/solar-UCCPrecautionaryLeaseFiling_2019-07-31_def.xml +++ b/documents/solar-UCCPrecautionaryLeaseFiling_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - UCCPrecautionaryLeaseFiling--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-UCCSecurityAgreement_2019-07-31_def.xml b/documents/solar-UCCSecurityAgreement_2019-07-31_def.xml index a6a210f..6c328f0 100644 --- a/documents/solar-UCCSecurityAgreement_2019-07-31_def.xml +++ b/documents/solar-UCCSecurityAgreement_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - UCCSecurityAgreement--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-UCCTaxLienandJudgmentLienSearches_2019-07-31_def.xml b/documents/solar-UCCTaxLienandJudgmentLienSearches_2019-07-31_def.xml index 7683cb3..7635949 100644 --- a/documents/solar-UCCTaxLienandJudgmentLienSearches_2019-07-31_def.xml +++ b/documents/solar-UCCTaxLienandJudgmentLienSearches_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - UCCTaxLienandJudgmentLienSearches--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-UniversalInsurancePolicy_2019-07-31_def.xml b/documents/solar-UniversalInsurancePolicy_2019-07-31_def.xml index bc09fdd..498e2bd 100644 --- a/documents/solar-UniversalInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-UniversalInsurancePolicy_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - UniversalInsurancePolicy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - + xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> + - - + diff --git a/documents/solar-WashingAndWasteAgreement_2019-07-31_def.xml b/documents/solar-WashingAndWasteAgreement_2019-07-31_def.xml index f759540..a07223b 100644 --- a/documents/solar-WashingAndWasteAgreement_2019-07-31_def.xml +++ b/documents/solar-WashingAndWasteAgreement_2019-07-31_def.xml @@ -27,8 +27,8 @@ Orange Button Taxonomy - WashingAndWasteAgreement--> xlink:href="../documents\solar-WashingAndWasteAgreement_2019-07-31.xsd#roleType_WashingAndWasteAgreement" xlink:type="simple"/> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - + diff --git a/documents/solar-WiringInstructions_2019-07-31_def.xml b/documents/solar-WiringInstructions_2019-07-31_def.xml index d18d063..8f6f006 100644 --- a/documents/solar-WiringInstructions_2019-07-31_def.xml +++ b/documents/solar-WiringInstructions_2019-07-31_def.xml @@ -22,23 +22,23 @@ Orange Button Taxonomy - WiringInstructions--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> diff --git a/documents/solar-WorkersCompensationInsurancePolicy_2019-07-31_def.xml b/documents/solar-WorkersCompensationInsurancePolicy_2019-07-31_def.xml index 5926125..f48c90c 100644 --- a/documents/solar-WorkersCompensationInsurancePolicy_2019-07-31_def.xml +++ b/documents/solar-WorkersCompensationInsurancePolicy_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - WorkersCompensationInsurancePolicy--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> + - diff --git a/process/solar-ProjectFinancing_2019-07-31_def.xml b/process/solar-ProjectFinancing_2019-07-31_def.xml index 37b8660..a798d1d 100644 --- a/process/solar-ProjectFinancing_2019-07-31_def.xml +++ b/process/solar-ProjectFinancing_2019-07-31_def.xml @@ -23,8 +23,8 @@ Orange Button Taxonomy - ProjectFinancing--> xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.xbrl.org/2003/linkbase http://www.xbrl.org/2003/xbrl-linkbase-2003-12-31.xsd"> arcroleURI="http://xbrl.org/int/dim/arcrole/hypercube-dimension" xlink:href="http://www.xbrl.org/2005/xbrldt-2005.xsd#hypercube-dimension" xlink:type="simple"/> - roleURI="http://xbrl.us/Solar/2019-07-31/roles/ProjectFinancing" xlink:href="../process\solar-ProjectFinancing_2019-07-31.xsd#roleType_ProjectFinancing" xlink:type="simple"/> +