-
Notifications
You must be signed in to change notification settings - Fork 0
Sprint 1 Testing and Validation
Heather Blakeway edited this page Sep 12, 2022
·
5 revisions
Throughout sprint 1 several measures have been taken to ensure the design and functionality of the ranged enemy are suitable for Atlantis Sinks.
Technical User testing of character in-game engine
- Test for a successful spawn
- Test for successful functionality targetting player
Electric Eel Medium Fidelity User Testing
J-Unit tests were not our main source of testing in sprint 1 as we only constructed the main enemy entity to spawn in the game engine. We endeavor to utilise this type of testing in future sprints once more features such as projectiles etc. are introduced.
The Final Boss
Shop
Inventory
Achievements
Infrastructure
User Interfaces Across All Pages
User Interfaces Buildings
Guidebook
[Resource Management](Resource-Management)