Skip to content

Sprint 15

Drew Rotheram edited this page Oct 30, 2023 · 5 revisions

Sprint Notes

ESA Proposal

  • Literature Review
  • Review potential AI Collaborators (Minerva, IVADO, MDA, others?) - Drew/Mandip/Melanie/Nick
  • Draft rough proposal - Drew/Mandip
  • Draft rough budget - Drew/Mandip
  • Draft rough schedule - Drew/Mandip
  • Draft rough IT plan - Drew/Mandip/Tim
  • Draft rough scientific concept (Automated Fringe detection, automated/optimized source modelling, maybe some kind of Sentinel-1 tip and queue) - Drew/Mandip/Nick

VRRC Dashboard

  • Add AOI overlay homepage in Dashboard from VRRC-API - Drew

VRRC API

  • Rework link between SLC and target table - Tim

  • Develop concept for storing static masks - Tim - backlogged

  • Add DEM entry to targets table - Tim - backlogged

    • Storing of DEM data - Tim
  • Implement HyP3 processing/download for test site - Edgecumbe - Mandip - backlog

    • Try running on eodms-cli ec2 instance

DUAP-InSAR-Processor

  • single command average coherence matrix production - Mandip

    • args: target, method
  • Gacos atm correction - Mandip - On Pause - develop workflow to apply a single atmospheric correction - Mandip - [ ] Reprocess 2-3 beam stacks to get files for atm correction analysis: Nick - backlog - incidence angle in map coords - IFG in RDC - DEM in RDC - Open conversation with Gacos Dev team

  • RAiDER Atmospheric Correction - Mandip

    • Investigate use - Mandip
    • Generate test correction - Mandip
    • Document Weather model requirements - Mandip
      • ECMWF Costs
      • Access to Environment Canada weather model - Nick
  • Raster Tiles - Mandip

    • auto create RGB Geotiff
    • create raster tiles (gdal2tiles.py)
    • Test on Dash leaflet
    • Test on S3 directly

Docker-Geoserver

  • Geoserver bug crashing unexpectedly
    • Investigate why it's crashing - Tim/Drew/Nick
  • Migrate S3 IFG storage to EFS - Drew/Tim/
    • Investigate the use of pre-cached raster tiles

VRRC-InSAR-Hub

  • Implement EODMS product upload workflow 50%
    • Finish implementing EODMS search
    • Implement EODMS Ordering/Download
    • create database record
    • Download and move image product to S3
    • Create SQS job in AWS to start processing

SAR Data Sources

  • RCM MOU - Brianna - Drew

System Architecture

  • Dedicated AWS (Dev/Staging) Environment - Tim/Drew
  • Cloud Formation (aws cdk) add geoserver deployment - Tim - backlogged
  • Investigate Cloud Formation (aws cdk) and Kubernetes - Tim - backlogged

Documenting & Reporting

Administrative

  • Defining Global Volcano watch shapefile for CSA
    • High Frequency -
    • Medium Frequency -
    • Low Frequency -
    • MOU
  • Draft MOU with U-Bristol Research Team/COMET

Travel & Conference

  • ASAR Presentation TCP Deadline Aug 24 - Mandip - Drew
  • Re:Invent Nov 27th - Dec 1st - Tim

Demos

  • Mandip - rastertiles v2
  • Tim - eodms ordering/downloading
  • Drew - Bid draft update

Scrum Notes:

Clone this wiki locally