Skip to content

build(deps): Upgrade ECC crates for Zebra v2.0.0-rc.0 release candidate #1943

build(deps): Upgrade ECC crates for Zebra v2.0.0-rc.0 release candidate

build(deps): Upgrade ECC crates for Zebra v2.0.0-rc.0 release candidate #1943

Triggered via pull request October 9, 2024 12:36
Status Failure
Total duration 9m 25s
Billable time 35m
Artifacts

ci-build-crates.yml

on: pull_request
Generate crates matrix
18s
Generate crates matrix
Check crates matrix
5s
Check crates matrix
Matrix: build
Open or update issues for building crates individually failures
0s
Open or update issues for building crates individually failures
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Build zebra-utils crate
the method `root_at_checkpoint_id` exists for mutable reference `&mut ShardTree<<DbT as WalletCommitmentTrees>::SaplingShardStore<'_>, 32, 16>`, but its trait bounds were not satisfied
Build zebra-utils crate
the method `witness_at_checkpoint_id_caching` exists for mutable reference `&mut ShardTree<<DbT as WalletCommitmentTrees>::SaplingShardStore<'_>, 32, 16>`, but its trait bounds were not satisfied
Build zebra-utils crate
Process completed with exit code 101.
Build zebrad crate
The job was canceled because "zebra-utils" failed.
Build zebrad crate
The operation was canceled.
Build zebra-state crate
The job was canceled because "zebra-utils" failed.
Build zebra-state crate
The operation was canceled.
Build zebra-scan crate
The job was canceled because "zebra-utils" failed.
Build zebra-scan crate
the method `root_at_checkpoint_id` exists for mutable reference `&mut ShardTree<<DbT as WalletCommitmentTrees>::SaplingShardStore<'_>, 32, 16>`, but its trait bounds were not satisfied
Build zebra-scan crate
the method `witness_at_checkpoint_id_caching` exists for mutable reference `&mut ShardTree<<DbT as WalletCommitmentTrees>::SaplingShardStore<'_>, 32, 16>`, but its trait bounds were not satisfied
Build zebra-scan crate
The operation was canceled.