Skip to content

WIP: Implement worker data listening mechanism p2 #30

WIP: Implement worker data listening mechanism p2

WIP: Implement worker data listening mechanism p2 #30

Triggered via push October 12, 2024 13:39
Status Failure
Total duration 40s
Artifacts

pipeline.yaml

on: push
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

8 errors
integration (3.9)
Process completed with exit code 1.
integration (3.11)
Process completed with exit code 1.
integration (3.10)
The job was canceled because "_3_9" failed.
integration (3.10)
Process completed with exit code 1.
integration (3.12)
The job was canceled because "_3_9" failed.
integration (3.12)
Process completed with exit code 1.
integration (3.8)
The job was canceled because "_3_9" failed.
integration (3.8)
The operation was canceled.