Skip to content

Run test

Run test #2621

Triggered via push July 10, 2023 12:45
Status Failure
Total duration 12m 19s
Artifacts
Matrix: airflow-integration-tests
Matrix: airflow-tox
Fit to window
Zoom out
Zoom in

Annotations

5 errors
airflow-integration-tests (1.20): internal/scheduler/schedulerapp.go#L131
not enough arguments in call to certs.NewCachedCertificateService
airflow-integration-tests (1.20)
Process completed with exit code 1.
airflow-tox (1.20, 3.9)
Process completed with exit code 1.
airflow-tox (1.20, 3.8)
The operation was canceled.
airflow-tox (1.20, 3.10)
The operation was canceled.