Skip to content

chore(deps): bump github.com/blinklabs-io/gouroboros from 0.101.0 to 0.102.0 #340

chore(deps): bump github.com/blinklabs-io/gouroboros from 0.101.0 to 0.102.0

chore(deps): bump github.com/blinklabs-io/gouroboros from 0.101.0 to 0.102.0 #340

Triggered via pull request October 28, 2024 18:28
Status Failure
Total duration 34s
Artifacts

go-test.yml

on: pull_request
Matrix: go-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
go-test (1.22.x, ubuntu-latest)
Process completed with exit code 1.
go-test (1.21.x, ubuntu-latest)
The job was canceled because "_1_22_x_ubuntu-latest" failed.
go-test (1.21.x, ubuntu-latest)
The operation was canceled.
go-test (1.21.x, macos-latest)
The job was canceled because "_1_22_x_ubuntu-latest" failed.
go-test (1.21.x, macos-latest)
The operation was canceled.
go-test (1.22.x, macos-latest)
The job was canceled because "_1_22_x_ubuntu-latest" failed.
go-test (1.22.x, macos-latest)
The operation was canceled.