Switches must be powered on and operating. This procedure is optional if switch configurations have not changed.
Optional Task: Save management spine and leaf switch configurations, and other network switch configurations before removing power from cabinets or the CDU. Management switch names are listed in the /etc/hosts
file.
-
Connect to all management network Dell leaf switches and write memory configuration to startup.xml.
The management switches in CDU cabinets are leaf switches.
Dell leaf switches, for example
sw-leaf-001
:ncn-m001# ssh admin@sw-leaf-001 admin@sw-leaf-001s password: sw-leaf-001# write memory sw-leaf-001# dir config sw-leaf-001# exit
Use a for loop:
ncn-m001# for sw in sw-leaf-001 sw-leaf-002 sw-cdu-001 sw-cdu-002; \ do ssh admin@$sw; done
-
Connect to all management network Mellanox spine switches and write memory configuration.
Mellanox spine switches, for example
sw-spine-001.nmn
:ncn-m001# ssh admin@sw-spine-001.nmn admin@sw-spine-001 password: sw-spine-001# enable sw-spine-001# write memory sw-spine-001# exit
-
Connect to all management network Aruba switches and write memory configuration.
ncn-m001# ssh admin@sw-spine-001.nmn admin@sw-spine-001 password: sw-spine-001# write memory sw-spine-001# exit
-
Save configuration settings on link aggregation group (LAG) switches that connect customer storage networks to the Slingshot network.
LAG switches are accessible from the ClusterStor management network.
ncn-m001# ssh admin@cls01053n00 admin@cls01053n00 password: cls01053n00# ssh r0-100gb-sw01 r0-100gb-sw01# enable r0-100gb-sw01# write memory r0-100gb-sw01# exit