Skip to content

Merge pull request #31 from boergegrunicke/dependabot/npm_and_yarn/io… #150

Merge pull request #31 from boergegrunicke/dependabot/npm_and_yarn/io…

Merge pull request #31 from boergegrunicke/dependabot/npm_and_yarn/io… #150

Triggered via push August 7, 2023 18:55
Status Failure
Total duration 23s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention
Matrix: adapter-tests
check-and-lint
6s
check-and-lint
Fit to window
Zoom out
Zoom in

Annotations

11 errors
adapter-tests (18.x, ubuntu-latest)
Process completed with exit code 1.
check-and-lint
Process completed with exit code 1.
adapter-tests (16.x, ubuntu-latest)
The operation was canceled.
adapter-tests (16.x, macos-latest)
The job was canceled because "_18_x_ubuntu-latest" failed.
adapter-tests (16.x, macos-latest)
The operation was canceled.
adapter-tests (20.x, ubuntu-latest)
The operation was canceled.
adapter-tests (18.x, windows-latest)
The operation was canceled.
adapter-tests (20.x, macos-latest)
The operation was canceled.
adapter-tests (18.x, macos-latest)
The operation was canceled.
adapter-tests (20.x, windows-latest)
The operation was canceled.
adapter-tests (16.x, windows-latest)
The operation was canceled.