Skip to content

Tests

Tests #2381

Triggered via schedule September 14, 2024 01:21
Status Failure
Total duration 7m 30s
Artifacts 1

ci.yaml

on: schedule
Matrix: build
Lint  /  Lint .github/workflows/
4s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
1m 1s
Lint / tox run -e lint
Unit test charm
1m 2s
Unit test charm
Check libraries
1m 19s
Check libraries
Integration test charm | 3.5.3  /  collect-integration-tests
Integration test charm | 3.5.3 / collect-integration-tests
Matrix: Integration test charm | 3.5.3 / integration-test
Waiting for pending jobs
Integration test charm | 3.5.3  /  (beta) Publish Allure report
Integration test charm | 3.5.3 / (beta) Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Unit test charm
Process completed with exit code 1.
Build charm | tests/integration/relation_tests/application-charm / Build charm | base #0
Failed to CreateArtifact: Failed to make request after 5 attempts: Request timeout: /twirp/github.actions.results.api.v1.ArtifactService/CreateArtifact
Build charm | . / Build charm | base #0
FailFast: cancelling since parallel instance has failed
Build charm | . / Build charm | base #0
The operation was canceled.

Artifacts

Produced during runtime
Name Size
packed-charm-cache-true-tests-integration-ha_tests-application_charm-base-0
7.94 MB