Skip to content

Tests

Tests #2482

Triggered via schedule October 5, 2024 01:21
Status Cancelled
Total duration 18m 19s
Artifacts 2

ci.yaml

on: schedule
Matrix: build
Lint  /  Lint .github/workflows/
4s
Lint / Lint .github/workflows/
Lint  /  tox run -e lint
19s
Lint / tox run -e lint
Unit test charm
1m 5s
Unit test charm
Check libraries
37s
Check libraries
Integration test charm | 3.5.3  /  collect-integration-tests
Integration test charm | 3.5.3 / collect-integration-tests
Matrix: Integration test charm | 3.5.3 / integration-test
Waiting for pending jobs
Integration test charm | 3.5.3  /  (beta) Publish Allure report
Integration test charm | 3.5.3 / (beta) Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

1 error
Build charm | tests/integration/ha_tests/application_charm / Build charm | base #0
The hosted runner encountered an error while running your job. (Error Type: Disconnect).

Artifacts

Produced during runtime
Name Size
packed-charm-cache-true-.-base-0
36.2 MB
packed-charm-cache-true-tests-integration-relation_tests-application-charm-base-0
6.19 MB