Update data-platform-workflows to v16.7.0 #2019
ci.yaml
on: pull_request
Build charm
/
Collect bases for charm | .
16s
Lint
/
Lint .github/workflows/
3s
Lint
/
tox run -e lint
19s
Unit test charm
1m 8s
Matrix: Build charm / build
Matrix: integration-test
Annotations
5 warnings
Integration | 3.4.4 | amd64 / relations/test_db_admin.py | group 1
Failed to download action 'https://api.github.com/repos/canonical/get-workflow-version-action/tarball/a5d53b08d254a157ea441c9819ea5002ffc12edc'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Integration | 3.4.4 | amd64 / relations/test_db_admin.py | group 1
Back off 12.934 seconds before retry.
|
Integration | 3.4.4 | amd64 / relations/test_db_admin.py | group 1
Failed to download action 'https://api.github.com/repos/canonical/get-workflow-version-action/tarball/a5d53b08d254a157ea441c9819ea5002ffc12edc'. Error: Connection reset by peer (api.github.com:443)
|
Integration | 3.4.4 | amd64 / relations/test_db_admin.py | group 1
Back off 29.762 seconds before retry.
|
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
logs-intergration-test-charm-microk8s-juju-2.9.49-amd64-relations-pgbouncer_provider-test_pgbouncer_provider.py-group-1
Expired
|
164 KB |
|
logs-intergration-test-charm-microk8s-juju-2.9.49-amd64-test_upgrade.py-group-1
Expired
|
63.7 KB |
|
logs-intergration-test-charm-microk8s-juju-3.4.4-amd64-test_tls.py-group-1
Expired
|
182 KB |
|