Skip to content

Fixes OP CL driven block production (#7240) #12

Fixes OP CL driven block production (#7240)

Fixes OP CL driven block production (#7240) #12

Triggered via push July 7, 2024 19:17
Status Failure
Total duration 1d 0h 26m 5s
Artifacts

posdao-tests.yml

on: push
Prepare branches
4s
Prepare branches
Matrix: Run Nethermind POSDAO tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Run Nethermind POSDAO tests (master)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
Run Nethermind POSDAO tests (bc-test-merge)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.