[LP#2034080] purge nvidia packages vigorously #187
main.yaml
on: pull_request
Matrix: Lint Unit / Lint and Unit Tests
Inclusive naming
/
check
6s
Integration test with VMWare
0s
Annotations
7 errors
Lint Unit / Lint and Unit Tests (3.11)
Process completed with exit code 1.
|
Lint Unit / Lint and Unit Tests (3.9)
The job was canceled because "_3_11" failed.
|
Lint Unit / Lint and Unit Tests (3.9)
Process completed with exit code 1.
|
Lint Unit / Lint and Unit Tests (3.8)
The job was canceled because "_3_11" failed.
|
Lint Unit / Lint and Unit Tests (3.8)
Process completed with exit code 1.
|
Lint Unit / Lint and Unit Tests (3.10)
The job was canceled because "_3_11" failed.
|
Lint Unit / Lint and Unit Tests (3.10)
Process completed with exit code 1.
|