Skip to content

Sync with upstream (#9) #49

Sync with upstream (#9)

Sync with upstream (#9) #49

Triggered via push June 25, 2024 10:10
Status Failure
Total duration 11m 40s
Artifacts

unit_tests.yml

on: push
Matrix: CPU Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
CPU Tests (3.9)
Process completed with exit code 1.
CPU Tests (3.8)
The job was canceled because "_3_9" failed.
CPU Tests (3.8)
The operation was canceled.
CPU Tests (3.10)
The job was canceled because "_3_9" failed.
CPU Tests (3.10)
The operation was canceled.
CPU Tests (3.11)
The job was canceled because "_3_9" failed.
CPU Tests (3.11)
The operation was canceled.