Skip to content

chore(deps): bump google.golang.org/api from 0.129.0 to 0.130.0 (#2533) #1458

chore(deps): bump google.golang.org/api from 0.129.0 to 0.130.0 (#2533)

chore(deps): bump google.golang.org/api from 0.129.0 to 0.130.0 (#2533) #1458

Triggered via push July 11, 2023 02:32
Status Failure
Total duration 21m 47s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

docker.yml

on: push
Matrix: Push Image
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Push Image (scheduler)
buildx failed with: ERROR: failed to solve: failed to push ghcr.io/***/dragonfly2/scheduler:latest: failed to copy: failed to do request: Put "https://ghcr.io/v2/***/dragonfly2/scheduler/blobs/upload/68aa6715-e69e-4b0a-8ff1-b9c5ba61f566?digest=sha256%3Aac86479457507e90c257ffb49f963f71a751e4eec0592a7027812512f1f0e1d2": write tcp 172.17.0.2:36706->140.82.112.34:443: write: connection reset by peer
Push Image (manager)
The job was canceled because "scheduler" failed.
Push Image (manager)
The operation was canceled.