remove electra related contracts & disable electra activation #281
Annotations
3 errors and 4 warnings
deploy (linux/amd64, ubuntu-latest, linux-amd64)
buildx failed with: ERROR: invalid tag "-linux-amd64": invalid reference format
|
deploy (linux/arm64, self-hosted-ghr-size-l-arm64, linux-arm64)
buildx failed with: ERROR: invalid tag "-linux-arm64": invalid reference format
|
manifest
Process completed with exit code 125.
|
prepare
ephemery-v1.0.0 is not a valid semver. More info: https://semver.org/
|
prepare
ephemery-v1.0.0 is not a valid semver. More info: https://semver.org/
|
prepare
No Docker image version has been generated. Check tags input.
|
prepare
No Docker tag has been generated. Check tags input.
|