Skip to content

Commit

Permalink
Add step in drafting to get feedback from CSMs (#23946)
Browse files Browse the repository at this point in the history
  • Loading branch information
noahtalerman authored Nov 19, 2024
1 parent 40c1358 commit f390db7
Showing 1 changed file with 2 additions and 0 deletions.
2 changes: 2 additions & 0 deletions handbook/product-design/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -102,6 +102,8 @@ The EM is responsible for moving the user story to the "Specified" and "Estimate

Before assigning an EM, double-check that the "Product" section of the user story [checklist](https://github.com/fleetdm/fleet/issues/new?assignees=&labels=story&projects=&template=story.md&title=) is complete (no TODOs).

If the story is tied to a customer feature request, the Head of Product Design (HPD) is responsible for adding the feature request issue to the [🏹 #g-customer-success board](https://github.com/fleetdm/fleet/issues#workspaces/g-customer-success-642c83a53e96760014c978bd/board). This way the Customer Success Manager (CSM) can review the wireframes and provide feedback on whether the proposed changes solve the customer's problem. If the changes don't, it's up to the HPD to decide whether to bring the user story back for more drafting or file a follow up user story (iteration).

Once a bug is approved in design review, The Product Designer is responsible for moving the bug to the appropriate release board.


Expand Down

0 comments on commit f390db7

Please sign in to comment.