Skip to content

CI with Nox

CI with Nox #1

Triggered via push January 15, 2024 13:29
Status Failure
Total duration 2m 23s
Artifacts

ci-linux.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.12)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_12" failed.
build (3.9)
The operation was canceled.
build (3.11)
The job was canceled because "_3_12" failed.
build (3.11)
The operation was canceled.
build (3.10)
The job was canceled because "_3_12" failed.
build (3.10)
The operation was canceled.