Skip to content
Triggered via pull request July 24, 2023 19:34
Status Failure
Total duration 10m 51s
Artifacts

test-build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (3.8)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (3.8)
The operation was canceled.
build (3.9)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (3.9)
The operation was canceled.
build (3.10)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (3.10)
The operation was canceled.