chore(helm): update pipeline db version #1256
helm-integration-test-latest.yml
on: push
console
/
helm-integration-test-console
2h 0m
Matrix: backend
Annotations
9 errors and 1 warning
backend (model-backend) / helm-integration-test
The job running on runner GitHub Actions 42 has exceeded the maximum execution time of 120 minutes.
|
backend (model-backend) / helm-integration-test
The operation was canceled.
|
console / helm-integration-test-console
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 120 minutes.
|
console / helm-integration-test-console
Process completed with exit code 1.
|
console / helm-integration-test-console
The operation was canceled.
|
backend (mgmt-backend) / helm-integration-test
The job running on runner GitHub Actions 21 has exceeded the maximum execution time of 120 minutes.
|
backend (mgmt-backend) / helm-integration-test
The operation was canceled.
|
backend (artifact-backend) / helm-integration-test
The job running on runner GitHub Actions 28 has exceeded the maximum execution time of 120 minutes.
|
backend (artifact-backend) / helm-integration-test
The operation was canceled.
|
console / helm-integration-test-console
No files were found with the provided path: test-results. No artifacts will be uploaded.
|