Skip to content

build(deps): update prost-types requirement from 0.11 to 0.12 #38

build(deps): update prost-types requirement from 0.11 to 0.12

build(deps): update prost-types requirement from 0.11 to 0.12 #38

Triggered via push December 7, 2023 23:46
Status Failure
Total duration 3m 11s
Artifacts

ci.yml

on: push
Matrix: Checks
Matrix: Integration
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Checks (ubuntu-latest)
Process completed with exit code 101.
Tests (ubuntu-latest)
Process completed with exit code 101.
Checks (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Checks (macos-latest)
The operation was canceled.
Tests (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Tests (macos-latest)
The operation was canceled.
Timings
Process completed with exit code 101.
Integration (ubuntu-latest, v1.5.13)
Process completed with exit code 101.
Integration (ubuntu-latest, v1.6.8)
The job was canceled because "ubuntu-latest_v1_5_13" failed.
Integration (ubuntu-latest, v1.6.8)
The operation was canceled.