build(deps): bump the k8s group with 3 updates #5606
test.yml
on: pull_request
Lints
4m 25s
Windows tests
7m 51s
Integration tests
12m 23s
VMNet test
11m 29s
Matrix: Colima
Matrix: Integration tests (on Linux)
Matrix: Unit tests
Matrix: Upgrade test
Matrix: vz
Annotations
1 error and 7 warnings
Upgrade test (v0.15.1)
The hosted runner encountered an error while running your job. (Error Type: Disconnect).
|
Integration tests
curl 8.9.1 is already installed and up-to-date.
To reinstall 8.9.1, run:
brew reinstall curl
|
Integration tests
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (default.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
vz (fedora.yaml)
Received request to deprovision: The request was cancelled by the remote provider.
|
VMNet test
qemu 9.1.0 is already installed and up-to-date.
To reinstall 9.1.0, run:
brew reinstall qemu
|
vz (fedora.yaml)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Upgrade test (v0.15.1)
qemu 9.1.0 is already installed and up-to-date.
To reinstall 9.1.0, run:
brew reinstall qemu
|