Skip to content

Continuous Integration #278

Continuous Integration

Continuous Integration #278

Triggered via schedule November 7, 2023 01:38
Status Failure
Total duration 5m 39s
Artifacts 2

CI.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (ubuntu-latest)
Process completed with exit code 101.
build (windows-latest)
The job was canceled because "ubuntu-latest" failed.
build (windows-latest)
The operation was canceled.
build (macos-latest)
The job was canceled because "ubuntu-latest" failed.
build (macos-latest)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
dezoomify-rs macos-latest Expired
48.7 MB
dezoomify-rs ubuntu-latest Expired
223 MB