Skip to content
This repository has been archived by the owner on Apr 26, 2024. It is now read-only.

Bump matrix-org/netlify-pr-preview from 2 to 3 (#16719) #23604

Bump matrix-org/netlify-pr-preview from 2 to 3 (#16719)

Bump matrix-org/netlify-pr-preview from 2 to 3 (#16719) #23604

Triggered via push December 4, 2023 12:02
Status Cancelled
Total duration 29m 43s
Artifacts 7

tests.yml

on: push
changes
2s
changes
check-lockfile
9s
check-lockfile
lint-crlf
7s
lint-crlf
lint-newsfile
0s
lint-newsfile
check-signoff  /  signoff
check-signoff / signoff
check-sampleconfig
37s
check-sampleconfig
check-schema-delta
1m 18s
check-schema-delta
lint
57s
lint
Typechecking
54s
Typechecking
lint-pydantic
58s
lint-pydantic
lint-clippy
20s
lint-clippy
lint-rustfmt
17s
lint-rustfmt
lint-clippy-nightly
18s
lint-clippy-nightly
linting-done
0s
linting-done
Matrix: portdb
calculate-test-jobs
5s
calculate-test-jobs
Matrix: complement
trial-olddeps
8m 6s
trial-olddeps
cargo-test
0s
cargo-test
cargo-bench
0s
cargo-bench
Matrix: trial-pypy
Matrix: sytest
Matrix: trial
tests-done
2s
tests-done
Fit to window
Zoom out
Zoom in

Annotations

13 errors and 3 warnings
sytest (focal)
FAILURE: #598: After /purge_history users still get pushed for new messages
sytest (focal)
Process completed with exit code 1.
sytest (focal)
Process completed with exit code 1.
complement (monolith, SQLite)
Process completed with exit code 1.
sytest (focal, multi-postgres, workers, asyncio)
Canceling since a higher priority waiting request for 'Tests-refs/heads/develop' exists
sytest (focal, multi-postgres, workers, asyncio)
The operation was canceled.
sytest (focal, multi-postgres, workers)
Canceling since a higher priority waiting request for 'Tests-refs/heads/develop' exists
sytest (focal, multi-postgres, workers)
The operation was canceled.
complement (workers, Postgres)
Canceling since a higher priority waiting request for 'Tests-refs/heads/develop' exists
complement (workers, Postgres)
The operation was canceled.
trial (3.8, postgres, 11, all)
Canceling since a higher priority waiting request for 'Tests-refs/heads/develop' exists
trial (3.8, postgres, 11, all)
The operation was canceled.
tests-done
Job trial returned cancelled
complement (monolith, SQLite)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
complement (monolith, Postgres)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
complement (workers, Postgres)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
Sytest Logs - cancelled - (focal, multi-postgres, workers) Expired
98 KB
Sytest Logs - cancelled - (focal, multi-postgres, workers, asyncio) Expired
65.3 KB
Sytest Logs - failure - (focal) Expired
7.62 MB
Sytest Logs - success - (focal, asyncio) Expired
7.64 MB
Sytest Logs - success - (focal, postgres) Expired
7.63 MB
Sytest Logs - success - (focal, postgres, asyncio) Expired
7.66 MB
Sytest Logs - success - (testing, postgres) Expired
7.63 MB