Skip to content

test: remove pkcs11 engine test #21

test: remove pkcs11 engine test

test: remove pkcs11 engine test #21

Triggered via push June 20, 2024 20:17
Status Cancelled
Total duration 21m 17s
Artifacts

ci.yml

on: push
Matrix: job
Fit to window
Zoom out
Zoom in

Annotations

5 errors
job (fedora:latest, clang, ibmtss, um, ../linux, 1)
Process completed with exit code 2.
job (alt:sisyphus, gcc, libtpm2-tss-devel)
The run was canceled by @mimizohar.
job (alt:sisyphus, gcc, libtpm2-tss-devel)
The operation was canceled.
job (debian:testing, clang, tpm2-tss)
The run was canceled by @mimizohar.
job (debian:testing, clang, tpm2-tss)
The operation was canceled.