Cosign improvements - batch 1 #14391
ci.yml
on: pull_request
Set up docker build 'dynamic' env variables
0s
Run the Django test suite
3m 23s
Matrix: e2etests
Run the Django test suite in reverse
3m 5s
Build and check documentation
3m 38s
Matrix: docker_build
Scan docker image
2m 5s
Matrix: Simulate upgrading instances
Validate OAS
0s
Generate Postman collection from OAS
0s
Generate SDKs from OAS
0s
Matrix: Push Docker image
update-docker-readme
/
Generate and update Docker Hub description
Annotations
8 errors and 3 warnings
End-to-end tests, chromium
Process completed with exit code 1.
|
Run the Django test suite in reverse
Process completed with exit code 1.
|
End-to-end tests, firefox
Process completed with exit code 1.
|
Run the Django test suite
Process completed with exit code 1.
|
End-to-end tests, webkit
Process completed with exit code 1.
|
Simulate upgrading instances (2.7.4)
Process completed with exit code 1.
|
Simulate upgrading instances (2.7.8)
The job was canceled because "_2_7_4" failed.
|
Simulate upgrading instances (2.7.8)
The operation was canceled.
|
End-to-end tests, chromium
No files were found with the provided path: /tmp/playwright_traces. No artifacts will be uploaded.
|
End-to-end tests, firefox
No files were found with the provided path: /tmp/playwright_traces. No artifacts will be uploaded.
|
End-to-end tests, webkit
No files were found with the provided path: /tmp/playwright_traces. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
docker-image-all-extensions-latest
Expired
|
268 MB |
|
docker-image-latest
Expired
|
268 MB |
|