Skip to content

CI/CD fix attempt

CI/CD fix attempt #68

Triggered via push January 16, 2025 22:04
Status Cancelled
Total duration 4m 17s
Artifacts 1

publish.yml

on: push
Matrix: test
Matrix: macos
Matrix: musllinux
Matrix: windows
Release
0s
Release
Fit to window
Zoom out
Zoom in

Annotations

13 errors and 3 warnings
musllinux (ubuntu-latest, x86)
Process completed with exit code 100.
musllinux (ubuntu-latest, x86_64)
The job was canceled because "ubuntu-latest_x86" failed.
musllinux (ubuntu-latest, x86_64)
The operation was canceled.
musllinux (ubuntu-latest, aarch64)
The job was canceled because "ubuntu-latest_x86" failed.
musllinux (ubuntu-latest, aarch64)
Process completed with exit code 100.
musllinux (ubuntu-latest, armv7)
The job was canceled because "ubuntu-latest_x86" failed.
musllinux (ubuntu-latest, armv7)
The operation was canceled.
windows (windows-latest, x86)
The run was canceled by @scnerd.
windows (windows-latest, x86)
The operation was canceled.
windows (windows-latest, x64)
The run was canceled by @scnerd.
windows (windows-latest, x64)
The operation was canceled.
macos (macos-14, aarch64)
The run was canceled by @scnerd.
macos (macos-14, aarch64)
The operation was canceled.
test (ubuntu-latest, x86_64)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
musllinux (ubuntu-latest, x86)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
sdist
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
wheels-sdist
582 KB