Skip to content

build(deps): bump actions/labeler from 4 to 5 (#5) #101

build(deps): bump actions/labeler from 4 to 5 (#5)

build(deps): bump actions/labeler from 4 to 5 (#5) #101

Triggered via push March 12, 2024 11:58
Status Cancelled
Total duration 1m 31s
Artifacts 1

test.yaml

on: push
Matrix: matrix test
coverage
0s
coverage
all-tests
2s
all-tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors
matrix test (sqlconnect/internal/trino)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/snowflake)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/mysql)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/databricks)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/redshift)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/redshift)
The operation was canceled.
matrix test (sqlconnect/internal/bigquery)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/bigquery)
The operation was canceled.
matrix test (sqlconnect/internal)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (.)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (.)
The operation was canceled.
matrix test (sqlconnect/internal/postgres)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
matrix test (sqlconnect/internal/postgres)
A task was canceled.
all-tests
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
sqlconnect_internal_profile.out Expired
6.74 KB