Skip to content

Merge pull request #50 from runk/runk-patch-2 #22

Merge pull request #50 from runk/runk-patch-2

Merge pull request #50 from runk/runk-patch-2 #22

Triggered via push March 17, 2024 22:57
Status Failure
Total duration 4h 53m 16s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (16.x)
The hosted runner: GitHub Actions 11 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
build (14.x)
The job was canceled because "_16_x" failed.
build (14.x)
The operation was canceled.
build (12.x)
The job was canceled because "_16_x" failed.
build (12.x)
The operation was canceled.