Skip to content

Added Shelly switches (2/2) #67

Added Shelly switches (2/2)

Added Shelly switches (2/2) #67

Triggered via push December 3, 2023 14:16
Status Failure
Total duration 28s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.