Skip to content

chore(deps): bump goschtalt/.github from 1.0.12 to 1.0.13 #10

chore(deps): bump goschtalt/.github from 1.0.12 to 1.0.13

chore(deps): bump goschtalt/.github from 1.0.12 to 1.0.13 #10

Triggered via pull request January 18, 2024 14:13
Status Failure
Total duration 2m 26s
Artifacts 1

ci.yml

on: pull_request
ci  /  Check code style
33s
ci / Check code style
ci  /  Golint Checking
36s
ci / Golint Checking
ci  /  REUSE Checking
18s
ci / REUSE Checking
ci  /  Build & Test & Report Coverage
51s
ci / Build & Test & Report Coverage
ci  /  Update goreportcard.com
23s
ci / Update goreportcard.com
Matrix: ci / Build & Test
ci  /  All checks passed check.
19s
ci / All checks passed check.
Fit to window
Zoom out
Zoom in

Annotations

12 errors
ci / Build & Test & Report Coverage
Process completed with exit code 1.
ci / Build & Test (ubuntu-latest, 1.19)
Process completed with exit code 1.
ci / Build & Test (ubuntu-latest, 1.18)
The job was canceled because "ubuntu-latest_1_19" failed.
ci / Build & Test (ubuntu-latest, 1.18)
Process completed with exit code 1.
ci / Build & Test (macos-latest, 1.19)
The job was canceled because "ubuntu-latest_1_19" failed.
ci / Build & Test (macos-latest, 1.19)
Process completed with exit code 1.
ci / Build & Test (windows-latest, 1.18)
The operation was canceled.
ci / Build & Test (windows-latest, 1.19)
The operation was canceled.
ci / Build & Test (macos-latest, 1.18)
The job was canceled because "ubuntu-latest_1_19" failed.
ci / Build & Test (macos-latest, 1.18)
The operation was canceled.
ci / License Checking
Process completed with exit code 1.
ci / All checks passed check.
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
licensing Expired
3.09 KB