You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This task is not about parallel IMA message streams. It's about SKALE Network Browser (SNB) unable to fecth connected chains to this S-Chain from SKALE Manager smart contracts behind Main Net node running by validator. If SNB cannot fetch connected chains then S2S transfers will not be preformed until list of conneted chains fetched later.
The issue is reproduced with working geth node (load balancer) 2023-07-25 11:47:13.532: Failed to start parallel periodic SNB refresh, error is: timeout of 60 reached, will restart periodic SNB refresh in non-parallel mode non-parallel.txt
Preconditions
IMA Agent: 2.0.0-beta.5
To Reproduce
Run IMA Agent
Observe logs
Expected behavior
IMA parallel works properly
Actual result
IMA parallel search failed and skip, was started previous algorithm(s
imaPar.txt
equential search)
The text was updated successfully, but these errors were encountered: