Skip to content

Also build the host executables. (#3) #25

Also build the host executables. (#3)

Also build the host executables. (#3) #25

Triggered via push July 8, 2024 10:31
Status Cancelled
Total duration 10m 0s
Artifacts 1

build.yml

on: push
Matrix: build-cross-esptool-binaries
Fit to window
Zoom out
Zoom in

Annotations

8 errors
esptool - s390x
The run was canceled by @floitsch.
esptool - s390x
The operation was canceled.
esptool - riscv64
The run was canceled by @floitsch.
esptool - riscv64
The operation was canceled.
esptool - ppc64le
The run was canceled by @floitsch.
esptool - ppc64le
The operation was canceled.
esptool - armv7
The run was canceled by @floitsch.
esptool - armv7
The operation was canceled.

Artifacts

Produced during runtime
Name Size
esptool-linux-aarch64 Expired
30.7 MB