Skip to content

fix(deps): update dependency io.insert-koin:koin-androidx-compose to v4 #202

fix(deps): update dependency io.insert-koin:koin-androidx-compose to v4

fix(deps): update dependency io.insert-koin:koin-androidx-compose to v4 #202

Triggered via push December 22, 2024 19:30
Status Failure
Total duration 8m 15s
Artifacts

android_test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
test (26)
The process '/usr/bin/sh' failed with exit code 1
test (31)
The job was canceled because "_26" failed.
test (31)
The operation was canceled.
test (21)
The job was canceled because "_26" failed.
test (21)
The operation was canceled.
test (34)
The job was canceled because "_26" failed.
test (34)
The operation was canceled.
test (26)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636