Skip to content

Linter fixes

Linter fixes #29

Triggered via push August 30, 2024 13:33
Status Failure
Total duration 50s
Artifacts

tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (3.8)
Process completed with exit code 4.
build (3.7)
The job was canceled because "_3_8" failed.
build (3.7)
Process completed with exit code 4.
build (3.11)
The job was canceled because "_3_8" failed.
build (3.11)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.12)
The job was canceled because "_3_8" failed.
build (3.12)
The operation was canceled.