Skip to content

Upgrade

Upgrade #1

Triggered via pull request January 19, 2024 06:27
Status Failure
Total duration 21s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.0)
The process '/opt/hostedtoolcache/Ruby/3.0.6/x64/bin/bundle' failed with exit code 7
build (3.2)
The job was canceled because "_3_0" failed.
build (3.2)
The operation was canceled.
build (3.1)
The job was canceled because "_3_0" failed.
build (3.1)
The operation was canceled.